Tappan Street station
Tappan Street | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
An outbound train at Tappan Street in 2016 | |||||||||||
| General information | |||||||||||
| Location | Beacon Street at Tappan Street Brookline, Massachusetts | ||||||||||
| Coordinates | 42°20′19″N 71°08′19″W / 42.33852°N 71.13852°W | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Rebuilt | 2026 | ||||||||||
| Passengers | |||||||||||
| 2011 | 674 daily boardings[1] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Tappan Street station is a light rail stop on the Green Line C branch of the MBTA subway system, located in the median of Beacon Street east of Tappan Street in Brookline, Massachusetts. The station consists of two side platforms which serve the C branch's two tracks. Tappan Street station is accessible, with raised platforms to accommodate low-floor light rail vehicles.
Reconstruction
%252C_June_2026.jpg)
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[2] Design work for Tappan Street and seven other C Branch stations was 15% complete by December 2022.[3] Designs shown in February 2024 called for the Tappan Street platforms to be widened and rebuilt at their current locations.[4]
In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Tappan Street.[5] The MBTA awarded a $41.9 million design-build contract in April 2025.[6] Design work for Tappan Street and Englewood Avenue was complete by September 2025, with the Tappan Street platforms to be widened and rebuilt at their current locations.[7]
By March 2026, reconstruction of Tappan Street station was expected to last from April to July 2026. Tappan Street and Englewood Avenue were planned to be the first stations in the project to be completed.[8] Construction began during a shutdown of the C Branch on May 6–17, 2026.[9] The station remained closed for reconstruction: the inbound platform reopened on June 29 (eight days later than planned), and the outbound platform reopened on July 18.[10][11][12] This made the station accessible, though some items like signage, railings, shelters, and trees were installed later.[13][14]
References
- ↑ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ↑ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
- ↑ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
- ↑ "Green Line C Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. February 15, 2024.
- ↑
- "All Stations Accessibility Program FY24 Projects". Federal Transit Administration. May 28, 2024.
- "Biden-Harris Administration Announces $343 Million to Modernize Transit Stations, Improve Accessibility Across the Country" (Press release). Federal Transit Administration. May 28, 2024.
- "MBTA Wins $67 Million Federal Grant to Improve Green Line Accessibility for People with Disabilities" (Press release). Massachusetts Bay Transportation Authority. May 30, 2024.
- ↑ Dunlevy, Gwen (April 24, 2025). "MBTA Construction Contract No. A26CN04 Design Build Green Line C Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
- ↑ "Item 6a - MBTA Beacon Street C Branch Station Accessibility Project Memo With Attachments". Town of Brookline. September 12, 2025. pp. 10, 32, 36.
- ↑ "Green Line C Branch Station Accessibility Upgrades Project: Town of Brookline Pre-Construction Public Meeting". Massachusetts Bay Transportation Authority. March 30, 2026. p. 26.
- ↑ "MBTA Successfully Completes Latest Work on Green Line C Branch" (Press release). Massachusetts Bay Transportation Authority. May 18, 2026.
- ↑
- "Alerts: Green Line". Massachusetts Bay Transportation Authority. June 10, 2026. Archived from the original on June 11, 2026.
- "Alerts: Green Line". Massachusetts Bay Transportation Authority. June 26, 2026. Archived from the original on June 26, 2026.
- "Alerts: Green Line". Massachusetts Bay Transportation Authority. June 29, 2026. Archived from the original on June 29, 2026.
- ↑ "Green Line Closure Travel Options". Massachusetts Bay Transportation Authority. May 6, 2026. Archived from the original on May 6, 2026.
- ↑
- "Alerts: Green Line C". Massachusetts Bay Transportation Authority. July 8, 2026. Archived from the original on July 9, 2026.
- "Alerts: Green Line C". Massachusetts Bay Transportation Authority. Archived from the original on July 18, 2026.
- ↑ "MBTA Beacon Street C-branch Station Accessibility Project UPDATE". Town of Brookline. July 30, 2026. Archived from the original on July 30, 2026.
- ↑ "MBTA Stations". Massachusetts Bay Transportation Authority. Archived from the original on July 31, 2026.
External links
Media related to Tappan Street station at Wikimedia Commons