Hawes Street station

Hawes Street
An outbound train at Hawes Street in 2026
General information
LocationBeacon Street at Hawes Street
Brookline, Massachusetts
Coordinates42°20′41″N 71°06′41″W / 42.34481°N 71.11144°W / 42.34481; -71.11144
Platforms2 side platforms
Tracks2
Construction
AccessibleNo
History
Rebuilt2026
Passengers
2011339 daily boardings[1]
Services
Preceding station MBTA Following station
Kent Street Green Line Saint Mary's Street
Location

Hawes Street station is a light rail stop on the Green Line C branch of the MBTA subway system, located in the median of Beacon Street west of Hawes Street in Brookline, Massachusetts. The station has two side platforms which serve the C branch's two tracks. With 339 boardings on an average weekday in 2011, Hawes Street had the lowest ridership on the C branch and fourth-lowest on the entire Green Line.[1] Hawes Street is not accessible; a reconstruction for accessibility is taking place in 2026.

Reconstruction

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[2] Design work for Hawes Street and seven other C Branch stations was 15% complete by December 2022.[3] Designs shown in February 2024 called for the inbound platform at Hawes Street to be shifted to the east side of the intersection.[4] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Hawes Street.[5]

The MBTA awarded a $41.9 million design-build contract in April 2025.[6] Designs shown in February 2026 called for the platforms at Hawes Street to be widened and rebuilt in their current locations.[7] By March 2026, preliminary construction work was expected to take place in May and August 2026, followed by main construction from October to December 2026.[8] Platform construction began during a shutdown of the C branch from August 8–16, 2026.[9]

References

  1. 1 2 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ↑ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  3. ↑ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  4. ↑ "Green Line C Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. February 15, 2024.
  5. ↑
  6. ↑ Dunlevy, Gwen (April 24, 2025). "MBTA Construction Contract No. A26CN04 Design Build Green Line C Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
  7. ↑ "Green Line C Branch Station Accessibility Upgrade Project". Massachusetts Bay Transportation Authority. February 3, 2026. p. 55.
  8. ↑ "Green Line C Branch Station Accessibility Upgrades Project: Town of Brookline Pre-Construction Public Meeting". Massachusetts Bay Transportation Authority. March 30, 2026. p. 26.
  9. ↑ "MBTA Beacon Street C-branch Station Accessibility Project UPDATE". Town of Brookline. July 30, 2026. Archived from the original on July 30, 2026.

Wikimedia Commons logo Media related to Hawes Street station at Wikimedia Commons