Dean Road station

Dean Road
An outbound train at Dean Road, with the inbound platform to the right, in April 2025
General information
LocationBeacon Street at Dean Road / Corey Road
Brookline, Massachusetts
Coordinates42°20′16″N 71°08′31″W / 42.33773°N 71.14198°W / 42.33773; -71.14198
Platforms2 side platforms
Tracks2
Construction
AccessibleNo
History
Rebuilt2026
Passengers
2011398 daily boardings[1]
Services
Preceding station MBTA Following station
Englewood Avenue Green Line Tappan Street
Location

Dean Road station is a light rail stop on the Green Line C branch of the MBTA subway system, located in the median of Beacon Street in Brookline, Massachusetts. The station has two staggered side platforms, serving the C branch's two tracks; the inbound platform is to the west of the intersection, and the outbound platform to the east. Dean Road is not accessible; a reconstruction for accessibility is taking place in 2026.

Reconstruction

Reconstruction work in May 2026

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[2] Dean Road was the only non-accessible C Branch stop not included in these plans.[3] Designs shown in February 2024 included Dean Road and called for both platforms to be shifted to the far side of the intersection.[4] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Dean Road.[5]

The MBTA awarded a $41.9 million design-build contract in April 2025.[6] Designs shown in February 2026 called for only the outbound platform to be moved to the far side; the inbound platform would be rebuilt at its existing location.[7]

By March 2026, preliminary construction work was expected to take place in April and May 2026, followed by main construction from July to September 2026.[8] Construction began during a shutdown of the C Branch on May 6–17, 2026.[9] The inbound platform will be closed from September 14 to October 9, 2026, for reconstruction.[10]

References

  1. ↑ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ↑ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  3. ↑ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 4–5.
  4. ↑ "Green Line C Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. February 15, 2024.
  5. ↑
  6. ↑ Dunlevy, Gwen (April 24, 2025). "MBTA Construction Contract No. A26CN04 Design Build Green Line C Branch Short Term Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority.
  7. ↑ "Green Line C Branch Station Accessibility Upgrade Project". Massachusetts Bay Transportation Authority. February 3, 2026. p. 10.
  8. ↑ "Green Line C Branch Station Accessibility Upgrades Project: Town of Brookline Pre-Construction Public Meeting". Massachusetts Bay Transportation Authority. March 30, 2026. p. 26.
  9. ↑ "MBTA Successfully Completes Latest Work on Green Line C Branch" (Press release). Massachusetts Bay Transportation Authority. May 18, 2026.
  10. ↑ "MBTA Announces September Service Changes". Massachusetts Bay Transportation Authority. August 18, 2026.

Wikimedia Commons logo Media related to Dean Road station at Wikimedia Commons