Zunyi Xinzhou Airport
Zunyi Xinzhou Airport 遵义新舟机场 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
| Summary | |||||||||||
| Airport type | Public / Military | ||||||||||
| Serves | Zunyi, Guizhou, China | ||||||||||
| Location | Xinzhou, Xinpu New Area | ||||||||||
| Opened | 28 August 2012 | ||||||||||
| Coordinates | 27°48′40.2″N 107°14′45.5″E / 27.811167°N 107.245972°E | ||||||||||
| Website | zunyiairport.cn | ||||||||||
| Map | |||||||||||
![]() ZYI/ZUZY Location in Guizhou ![]() ZYI/ZUZY ZYI/ZUZY (China) | |||||||||||
| Runways | |||||||||||
| |||||||||||
| Statistics (2025 [1]) | |||||||||||
| |||||||||||
| Source: CAAC[2] | |||||||||||
| Zunyi Xinzhou Airport | |||||||
|---|---|---|---|---|---|---|---|
| Simplified Chinese | 遵义新舟机场 | ||||||
| Traditional Chinese | 遵義新舟機場 | ||||||
| |||||||
Zunyi Xinzhou Airport (IATA: ZYI, ICAO: ZUZY) is a dual-use military and civil airport serving the city of Zunyi in China's southwestern Guizhou Province. It is located in the town of Xinzhou in Xinpu New Area. The military air base was built in 1966 and completed in 1970.[3]
In September 2009 construction was started to convert the air base to a dual-use airport, with an estimated total investment of 408 million yuan.[3] The airport opened on 28 August 2012, with inaugural flights to Beijing and Guangzhou.[4]
History
Zunyi Xinzhou Airport is an airport with a rich historical background. Its predecessor was the Zunyi Air Force Airport (also known as Xinzhou Airport). Zunyi established Laopuchang Airport in 1934 and Longping Airport in 1940. The latter was converted into the Zunyi Civil Aviation Station in 1970, but both airports have been abandoned.[5] Xinzhou Airport started construction on December 17, 1969, and was officially completed and put into use in January 1980, initially as a secondary permanent air force base. At that time, the runway was 3,000 meters long, but civil aviation services had not yet been opened.[6]
In January 2009, the Central Military Commission and the State Council approved the airport to be used for both military and civilian purposes. The airport expansion project was launched on May 4 of the same year.[7] The design goal at that time was to achieve an annual passenger flow of 300,000 people by 2020. In July 2011, the design scheme of the Xinzhou Airport terminal building was determined to be based on the Zunyi Conference site.[8]
Zunyi Xinzhou Airport made its first calibration flight on December 31, 2011[9] and its first test flight on June 2, 2012 by China Southern Airlines Boeing 737-800.[10] On July 26, 2012, the expansion and renovation project of Zunyi Xinzhou Airport passed the acceptance of the Civil Aviation Administration of Southwest China and officially opened to traffic on August 28 of the same year.[11] Subsequently, due to the rapid growth of passenger flow, Zunyi Airport, which only had 3 Class C parking stands, experienced a shortage of facilities just one year after its opening. Therefore, the Zunyi Municipal Government decided to expand the airport in 2013.[12][13][14] In July 2018, the expansion project of part of the airport apron was completed, with 5 new Class C parking stands and one taxiway. The number of parking stands at Xinzhou Airport increased to 10 and the number of taxiways increased to 2.[15] By the end of the same year, the airport's passenger throughput reached 2 million passengers.[16]
On July 1, 2014, the Zunyi Airport Expressway was completed and opened to traffic.[17] On December 30 of the same year, Zunyi Xinzhou Airport was approved by the National Port Management Office to temporarily open its port from January 1, 2015 to June 30, 2015.[18][19] On June 28, 2015, Air China launched a temporary passenger charter flight from Zunyi to Hong Kong International Airport, making Zunyi the second city in Guizhou Province to open its aviation port.[20][21] The temporary opening period of Zunyi Airport was subsequently extended to December 31, 2015[18][22]. It was temporarily opened again from 2016 to 2018. The international passenger throughput in 2017 exceeded 25,000[23], and the international passenger throughput in 2018 exceeded 60,000[24].
Since its opening in 2012, Xinzhou Airport has seen rapid growth in passenger throughput (exceeding 2 million passengers in 2018), and the existing facilities could no longer meet the growing travel demand, making expansion of the airport an urgent necessity.[25]
On December 28, 2018, the civil‑aviation portion of the Xinzhou Airport expansion and renovation project held its ground-breaking ceremony, with the pilot section of the civil‑aviation work area’s foundation treatment and earthwork project commencing first. The total investment is estimated at approximately 3 billion yuan. The expansion plan includes extending the existing runway 200 meters southward to a total length of 3,000 meters; constructing a new 3,000‑meter‑long, 18‑meter‑wide parallel taxiway; building 26 Class‑C aircraft stands, including four cargo stands; constructing a 60,000‑square‑meter terminal building, of which 11,000 square meters are designated for international operations; and adding a parking area of approximately 40,000 square meters. The project also includes a 3,600‑square‑meter cargo terminal equipped with inspection and quarantine facilities meeting port‑of‑entry requirements, as well as supporting infrastructure such as an aviation‑fuel depot, an air‑traffic‑management complex, a fire‑rescue station, an electrical and lighting substation, customs and border‑inspection facilities, and an airport hotel, totalling roughly 74,000 square meters of operational and service buildings. The expansion was planned for completion and commissioning in 2021, after which the new terminal area would be ten times larger than the existing one and capable of handling 4.5 million passengers annually (including 250,000 international passengers) and 12,500 tons of cargo, meeting the standards required for opening as an international aviation port.[26][27]
Although the initial plan of Xinzhou Airport expansion and renovation project was to complete in 2021 or 2022, according to People Daily, the project had not yet started as of April 14, 2023.[28] Meanwhile, the airport's passenger throughput fell from 2 million in 2018 to fewer than 1.4 million in 2025.[1]
Facilities
The airport has a 2,800-meter (9,200 ft) runway (class 4C)[4] and an 11,000-square-meter (120,000 sq ft) terminal building that is designed to resemble the site of Zunyi Conference.[29] It was projected to handle 300,000 passengers annually by 2020,[3] although during its first year in operation the airport already handled 309,531.[30]
Airlines and destinations
See also
References
- 1 2 中国民航局 (2026-02-26). "2025年全国民用运输机场生产统计公报". 中国民航局. Retrieved 2026-03-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2023年全国民用运输机场生产统计公报".
- 1 2 3 "遵义机场改扩建完成投资1.38亿". airnews.cn. 2010-12-17. Archived from the original on 2011-11-22. Retrieved 2011-10-22.
- 1 2 "北京遵义首航 南航贵州支线机场航线增至3条". Carnoc. 2012-08-31. Archived from the original on 2022-08-11. Retrieved 2012-08-31.
- ↑ 民航贵州省管理局史志编纂委员会 (1997). 贵州省志·民用航空志. 方志出版社. pp. 36–38. ISBN 7-80122-145-1.
- ↑ 贵州省遵义地区地方志编纂委员会 (1997). 遵义地区志·交通志、邮电志、城乡建设环境保护志. 贵州人民出版社. p. 100. ISBN 7-22104-486-4.
- ↑ "遵义机场改扩建工程奠基". 贵州商报. 2009-05-05. Archived from the original on 2018-01-29. Retrieved 2018-01-29.
- ↑ 唐正平 (2011-07-11). "遵义机场选定"会址"造型航站楼或年内启用". 贵州都市报. Archived from the original on 2019-08-24. Retrieved 2018-01-29.
- ↑ 杨茜 (2012-01-01). "遵义机场昨天首次校飞". 中国新闻社. Archived from the original on 2019-08-23. Retrieved 2018-01-29.
- ↑ 李光伟 (2012-06-02). "贵州遵义机场首次试飞成功". 中国新闻社. Archived from the original on 2019-08-28. Retrieved 2018-01-29.
- ↑ "遵义新舟机场通航 "十二五"再建两座机场". 贵州都市报. 2012-08-29. Archived from the original on 2018-01-29. Retrieved 2018-01-29.
- ↑ "遵义机场改善硬件设施破解"成长烦恼"". 金黔在线. 2013-07-11. Archived from the original on 2019-08-24. Retrieved 2018-01-29.
- ↑ 莫莉; 刘鸿 (2013-12-13). "遵义机场 缺的不仅是停机位". 贵州都市报. Archived from the original on 2019-08-16. Retrieved 2018-01-29.
{{cite news}}: CS1 maint: multiple names: authors list (link) - ↑ 唐正平 (2014-03-20). "机场"一飞冲天"——提前七年实现旅客年吞吐目标". 贵州日报. Archived from the original on 2018-01-29. Retrieved 2018-01-29.
- ↑ "遵义新舟机场改扩建工程部分完成 停机位增至10个". www.sohu.com. Archived from the original on 2019-08-27. Retrieved 2018-12-26.
- ↑ 黄宝华 (2018-12-25). "通航6年后 新舟机场迎来第200万名旅客". 贵阳晚报. Archived from the original on 2019-08-24. Retrieved 2018-12-26.
- ↑ 黄宝华 (2014-07-01). "遵义机场高速今日通车 机场至遵义城区最快只要20多分钟". 贵阳晚报. Archived from the original on 2018-01-30. Retrieved 2018-01-29.
- 1 2 "遵义机场延长临时开放已获国家口岸办批复". www.xinpu.gov.cn. Retrieved 2026-03-28.
- ↑ "国务院批复同意了!贵州第二个航空口岸对外开放". www.gzstv.com. Retrieved 2026-03-28.
- ↑ "遵义至香港临时客运包机首航成功". 遵义市政府门户网站. 2015-06-29. Archived from the original on 2018-01-30. Retrieved 2018-01-29.
- ↑ "临时客运包机首航成功 遵义飞香港不到两小时". 多彩贵州网. 2015-06-29. Archived from the original on 2018-01-29. Retrieved 2018-01-29.
- ↑ "遵义新舟机场延长临时开放获得批复". 遵义市政府门户网站. 2015-07-21. Archived from the original on 2018-01-30. Retrieved 2018-01-29.
- ↑ 张成宇 (2017-12-19). "遵义机场2017年国际旅客吞吐量突破2.5万人次". 人民网-贵州频道. Archived from the original on 2018-01-30. Retrieved 2018-01-29.
- ↑ "遵义新舟机场年旅客量突破200万,正式跨入中型机场行列_服务". www.sohu.com. Archived from the original on 2019-08-16. Retrieved 2018-12-26.
- ↑ "遵义机场扩建,计划投资约46.8亿,预计2022年建成投用!". www.sohu.com. Retrieved 2026-03-28.
- ↑ 唐正平 (2018-12-29). "遵义新舟机场改扩建工程动工". 贵州日报. Archived from the original on 2019-08-23. Retrieved 2018-12-29.
- ↑ "遵义新舟机场改扩建工程动工_央广网". gz.cnr.cn. Retrieved 2026-03-28.
- ↑ "有回音 | 贵州遵义回应机场改扩建进展:已完成前置工作 尽早开工建设". gz.people.com.cn. Retrieved 2026-03-28.
- ↑ "遵义机场选定"会址"造型航站楼或年内启用". Carnoc. 2011-07-11. Archived from the original on 2019-08-24. Retrieved 2011-10-22.
- ↑ "民航机场业务量(排序)". CAAC. 2014-04-07.
- ↑ "江苏多地机场,官宣!". Retrieved 14 February 2026.
- ↑ "China Southern to transfer first 13 services to Beijing Daxing Airport in Oct-2019 | Corporate Travel Community". 4 July 2019. Archived from the original on 7 November 2022. Retrieved 22 September 2019.
- 1 2 "注意!3月30 日起遵义机场将执行2025年夏秋航季航班时刻了!". Retrieved 21 April 2025.
- ↑ "官宣!东海航空换季启航,冬春航班一览!". Retrieved 22 October 2025.
- ↑ "跟着航线去旅游 | 江西航空2025年冬航季航班抢先看!". Retrieved 15 November 2025.
- 1 2 "10月30日起,丽江机场将执行2022年冬航季航班计划". Retrieved February 12, 2023.
- 1 2 "遵义新舟机场2022年冬春航季航班计划来了!". Retrieved December 27, 2022.
- 1 2 "2026夏航季启幕|合肥新桥机场航线焕新,一翼乘风,畅飞春夏好光景". Retrieved 25 May 2026.
- 1 2 3 "天津航空冬春航季,邀您悦享万里河山,连通世界精彩". Retrieved 7 November 2025.
- ↑ "遵义新舟机场2023年夏航季航班时刻表来了!新增沈阳、常州、南通3个航点城市!". Retrieved 16 May 2023.
- ↑ "航班换季 | 三亚机场2025年冬春航季航班抢先看". Retrieved 6 January 2026.


