North Avenue station (Metro Manila Subway)
North Avenue | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Drone view of the under-construction station (right) in February 2026 | |||||||||||||||||||||||||
| General information | |||||||||||||||||||||||||
| Location | Mindanao Avenue corner North Avenue Project 6, Quezon City, Metro Manila | ||||||||||||||||||||||||
| Coordinates | 14°39′11″N 121°01′52″E / 14.6531°N 121.0311°E | ||||||||||||||||||||||||
| Owner | Department of Transportation | ||||||||||||||||||||||||
| Operator | Department of Transportation | ||||||||||||||||||||||||
| Line | Metro Manila Subway | ||||||||||||||||||||||||
| Construction | |||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||
| Other information | |||||||||||||||||||||||||
| Status | Under construction | ||||||||||||||||||||||||
| Station code | BL04 | ||||||||||||||||||||||||
| History | |||||||||||||||||||||||||
| Opening | c. 2032 | ||||||||||||||||||||||||
| Services | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| Transfer at North Triangle Common Station | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
North Avenue station is an under-construction underground Metro Rail Transit (MRT) station located on the Metro Manila Subway (Line 9) system in Quezon City, Metro Manila, Philippines.
The station serves as a critical multi-modal transit gateway, connecting commuters directly to the elevated Unified Grand Central Station (also known as the Common Station). This integration allows seamless transfers to LRT Line 1, MRT Line 3, and MRT Line 7. It is surrounded by primary commercial hubs and institutions, including SM North EDSA, TriNoma (and its transit wing, The Exchange), Ayala Malls Vertis North, the Triangle Park, and the Veterans Memorial Medical Center.
History

In February 2019, the Department of Transportation signed a deal with the joint venture of Shimizu Corporation, Fujita Corporation, Takenaka Civil Engineering Co., Ltd., and EEI Corporation for the design and build contract for the first three stations of the Metro Manila Subway, which includes the Quirino Highway station, Tandang Sora station, and North Avenue station under Contract Package 101 (CP101).[1][2] Following finalizations, a groundbreaking ceremony officially launching the MMSP was held on February 27, 2019.[2]
Initial utility relocation and site preparation kicked off along the North Triangle area and Mindanao Avenue in 2022.[1] Following adjustments to the line's overall timeline due to urban right of way challenges, full underground civil works are scheduled to align with the complete system's targeted commissioning by c. 2032.
Station layout
Designed as a multi-level subterranean facility, the station features an extensive layout planned to handle high daily passenger volumes transferring through the North Triangle hub. The lower platform level will hold a standard 210-meter (690 ft) footprint to process high-capacity eight-car train configurations. The station connects directly via pedestrian concourses to the main terminal spaces of the Unified Grand Central Station structure overhead.
References
- 1 2 "DOTr - Metro Manila Subway Project Phase 1". Department of Transportation. Archived from the original on June 10, 2021. Retrieved July 23, 2022.
- 1 2 Pateña, Aerol John (February 25, 2019). "DOTr signs deal for Metro Manila Subway's first 3 stations". Philippine News Agency. Archived from the original on July 23, 2022. Retrieved June 21, 2026.
.jpg)