Anonas station (Metro Manila Subway)
Anonas | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Construction of the station along F. Castillo Street, May 2026 | |||||||||||
| General information | |||||||||||
| Location | Anonas Street corner Aurora Boulevard Project 3, Quezon City, Metro Manila | ||||||||||
| Coordinates | 14°37′41″N 121°03′52″E / 14.6281°N 121.0645°E | ||||||||||
| Owner | Department of Transportation | ||||||||||
| Operator | Department of Transportation | ||||||||||
| Line | Metro Manila Subway | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Other information | |||||||||||
| Status | Under construction | ||||||||||
| Station code | BL07 | ||||||||||
| History | |||||||||||
| Opening | c. 2032 | ||||||||||
| Services | |||||||||||
| |||||||||||
| Out-of-system interchange | |||||||||||
| |||||||||||
| |||||||||||
Anonas station is an under-construction underground Metro Rail Transit (MRT) station located on the Metro Manila Subway (Line 9) system in Quezon City, Metro Manila, Philippines.
The station sits under the busy intersection of Anonas Street and Aurora Boulevard, acting as a structural out-of-system interchange linking commuters directly with the elevated Anonas station of the LRT Line 2. This link provides a key cross-transit corridor between the eastern-facing lines of Metro Manila and the subway's north-to-south axis.
History
The Department of Transportation (DOTr) issued a formal Notice of Award for the station's civil footprint on September 23, 2022, to Sumitomo Mitsui Construction Co., Ltd. under Contract Package 103 (CP103).[1] The ₱21.13 billion baseline contract was officially signed on November 3, 2022, during a ceremony held at Malacañang Palace witnessed by President Bongbong Marcos and Japanese diplomatic representatives.[2][3]
The project officially broke ground on February 13, 2023, under the supervision of DOTr Secretary Jaime Bautista. CP103 comprises a 6.6-kilometer (4.1 mi) operational corridor. Tunneling works connecting the Anonas hub use advanced Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs) alongside localized New Austrian Tunneling Method (NATM) configurations to lower surface interruptions along Aurora Boulevard.[4]
References
- ↑ "Notice of Award: Metro Manila Subway Project Contract Package 103" (PDF). Procurement Service - Philippine Government Electronic Procurement System (PS-PhilGEPS). September 23, 2022. Retrieved June 21, 2026.
- ↑ "DOTr Awards 2 Subway Contracts to Nishimatsu-DMCI JV and Sumitomo Mitsui Construction". Embassy of Japan in the Philippines. November 3, 2022. Retrieved June 21, 2026.
- ↑ "Metro Manila Subway CP102 & CP103 Contract Signing". Quezon City Government Official Website. November 4, 2022. Retrieved June 21, 2026.
- ↑ De Leon, Susan (February 13, 2023). "Metro Manila Subway Project breaks ground for CP 103's Anonas, Camp Aguinaldo Stations". Philippine Information Agency. Retrieved June 21, 2026.
External links
Media related to Anonas station (Metro Manila Subway) at Wikimedia Commons
