Line S7 (Nanjing Metro)

Line S7
Overview
Other names
  • Lishui line[1]
  • Ningli Line[2]
  • Nanjing–Lishui intercity railway[3]
  • Ningli intercity railway[4][a]
StatusIn operation
LocaleJiangning and Lishui districts
Nanjing, Jiangsu
Termini
Stations9
Service
TypeRapid transit
OperatorNanjing Metro
History
Opened26 May 2018 (2018-05-26)
Technical
Line length28.869 km (17.9 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)

Line S7 of the Nanjing Metro (Chinese: 南京地铁S7号线; pinyin: Nánjīng Dìtiě S-Qī Hào Xiàn) is a north–south suburban rapid transit line primarily serving Nanjing's Lishui District, running from Konggangxinchengjiangning to Wuxiangshan, and was opened on 26 May 2018.[5] The line is served by 4 car Class B trains with a maximum speed of 100 km/h (62 mph). The line is designed to allow for 6 cars trains to accommodate long term growth.[6]

Opening timeline

SegmentCommencementLengthStation(s)Name
Konggangxinchengjiangning — Wuxiangshan 26 May 2018 28.869 km (17.94 mi) 9 Ningli ICR Phase 2
Nanjing South — Konggangxinchengjiangning 26 May 2018 see Line S1 (through services)

Station list

Service
routes
Station name Connections Distance
km
Location
English Chinese
● Nanjing South Railway Station 南京南站  1   3   S3  Nanjing South railway station NKH see
Line S1
Yuhuatai / Jiangning
| Cuipingshan 翠屏山 Jiangning
| HHU / Fochengxilu 河海大学·佛城西路
| Jiyindadao 吉印大道  5 
| Zhengfang­zhonglu 正方中路
| Xiangyulubei 翔宇路北
● Xiangyulunan 翔宇路南  S9 
● Lukou International Airport 禄口机场 Nanjing Lukou International Airport NKG
● ● | Konggangxinchengjiangning 空港新城江宁 0.000 0.000 Jiangning
● | | Zhetang 柘塘 5.701 5.701 Lishui
● | | Konggangxinchenglishui 空港新城溧水 5.623 11.324
● | | Qunli 群力 3.301 14.625
● | | Wolonghu 卧龙湖 5.938 20.563
● ● ● Lishui 溧水 2.595 23.158
● ● ● Zhongshanhu 中山湖 1.630 24.788
● ● ● Xingzhuang 幸庄 2.617 27.405
● ● ● Wuxiangshan 无想山 1.464 28.869

Notes

  1. ↑ "Ning" (宁), is the standard Chinese abbreviation for Nanjing. It comes from the name "Jiangning" (江宁) that the city had in the early Qing.

References

  1. ↑ simplified Chinese: 溧水线; traditional Chinese: 溧水線; pinyin: Lìshuǐ Xiàn
  2. ↑ "南京地铁S7号线(宁溧城际)最新高清线路图,全程站点及沿途换乘站一览表".
  3. ↑ 南京到溧水城际轨道交通; 南京到溧水城際軌道交通; Nánjīng dào Lìshuǐ Chéngjì Guǐdào Jiāotōng
  4. ↑ 宁溧城际轨道交通; 寧溧城際軌道交通; Níng-Lì Chéngjì Guǐdào Jiāotōng
  5. ↑ 南京地铁S7号线信号、通信等工程预验收顺利完成. 中国江苏网 (in Chinese). 9 February 2018. Archived from the original on 22 February 2018. Retrieved 21 February 2018.
  6. ↑ "南京地铁S7号线26日开通试运营 单趟运营时间约30分钟_ 龙虎网". news.longhoo.net. Archived from the original on 10 June 2019. Retrieved 10 May 2020.