Line 6 (Xuzhou Metro)

Line 6
6
Xuzhou Tongshan District Hospital of TCM station platform
Overview
StatusOperational
OwnerXuzhou Metro
LocaleXuzhou, Jiangsu, China
Termini
Stations16
Service
TypeRapid transit
SystemXuzhou Metro
OperatorXuzhou Metro
Depot(s)Wangzhuang Depot[1], Gaotie Parking Lot (高铁停车场)[2]
Rolling stockCRRC Nanjing Puzhen 4 cars type B[3]
History
Opened28 September 2025 (2025-09-28)
Technical
Line length22.9 km (14.2 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1,500 V DC Overhead catenary
Operating speed80 km/h (50 mph) (Maximum design speed)

Line 6 of the Xuzhou Metro (Chinese: 徐州地铁6号线) is a rapid transit line in Xuzhou, Jiangsu, China. The first phase opened on 28 September 2025 with 16 stations, spanning 22.9 km long.[4] Line 6 is the first fully automated metro line using GoA4 automation level in Xuzhou.[5]

History

On 28 November 2020, the groundbreaking ceremony of the second phase of Line 3 and the first phase of Line 6 were held at Municipal Administrative Center station.[5][6]

On 27 May 2025, Line 6 passed the acceptance of the civil engineering of the depot for entry and exit lines in the first phase of the project.[5][7]

On 5 June 2025, Line 6 started trial operation in 3 months with no passengers and passed the acceptance on 10 September 2025.[5][8]

On 20 September 2025, Line 6 opened a three-day trial ride activity for the public.[8]

On 28 September 2025, the first phase of Line 6 officially put into operation.[4]

Stations

All 16 stations are underground.[5]

The line operates from 6:00 to 22:30. The peak interval on weekdays is about 6 minutes and 34 seconds, the peak interval is about 8 minutes and 52 seconds, the peak interval on weekends is about 8 minutes and 05 seconds, the interval between flat peak trains is about 9 minutes and 53 seconds, and the one-way running time of trains is about 39 minutes and 18 seconds.[8]

Station name Transfer Distance

km

Location
English Chinese
Xuzhou Tongshan District Hospital of TCM 铜山中医院 Tongshan District
Yuquanhe 玉泉河 3
Gaojiaying 高家营
Yicheng 驿城
Jianceyuan 检测园 Yunlong District
Tangfang 塘坊
Xuzhou City Hospital of TCM 市中医院
Yingbindadao 迎宾大道
Lishuilu 丽水路
Municipal Administrative Center 市行政中心 2
Yizhongnan 一中南
Xuzhou Olympic Sports Center 奥体中心
Huaihai International Expo Center 博览中心
Zhaowu 赵武
Dahu 大湖 Jiawang District
Xuzhoudong Railway Station 徐州东站 1

References

  1. ↑ "中铁四局助力徐州地铁6号线建设". 2 April 2023.
  2. ↑ "徐州市城市轨道交通6号线一期工程车辆基地工程汽车采购项目(二次公告)". 10 May 2024.
  3. ↑ "首列全自动80B标准地铁——徐州6号线一期首列电客车正式亮相". 7 May 2024.
  4. 1 2 "乐服务·畅彭城┃地铁连万家,共建你我他——徐州地铁6号线开通日同步开展站长接待日活动". 14 October 2025.
  5. 1 2 3 4 5 "徐州地铁6号线最新规划(线路图+站点+开通时间)". 27 September 2025.
  6. ↑ "我市举行地铁2号线通车运营暨3号线二期、6号线一期工程开工仪式". 28 November 2020.
  7. ↑ "徐州地铁6号线重要配套工程竣工!中建一局二公司打造地铁运营新枢纽". 20 June 2025.
  8. 1 2 3 "9月28日,徐州地铁6号线一期通车运营!". 26 September 2025.