Hohhot Metro

Hohhot Metro
Overview
LocaleHohhot, Inner Mongolia, China
Transit typeRapid transit
Number of lines
2
Number of stations
44
Websitehttp://www.hhhtmetro.com/
Operation
Began operation
29 December 2019 (2019-12-29)[1]
Technical
System length49.0 km (30.4 mi)
Hohhot Metro
Chinese name
Simplified Chinese呼和浩特地铁
Traditional Chinese呼和浩特地鐵
Transcriptions
Standard Mandarin
Hanyu PinyinHūhéhàotè Dìtiě
Alternative Chinese name
Simplified Chinese呼和浩特轨道交通
Traditional Chinese呼和浩特軌道交通
Transcriptions
Standard Mandarin
Hanyu PinyinHūhéhàotè Guǐdào Jiāotōng
Mongolian name
Mongolian CyrillicХөх хотын метро
Mongolian scriptᠬᠦᠬᠡᠬᠤᠳᠠ
ᠶᠢᠨ
ᠮᠧᠲ᠋ᠷᠣ᠋
Transcriptions
SASM/GNCKökeqota-jin metoru

Hohhot Metro or Hohhot Rail Transit is a metro system in Hohhot, Inner Mongolia, China. Line 1 opened on 29 December 2019.[2] It is currently the only metro system in China without China T-Union support.[3]

Lines

Line Terminals
(District/Banner)
Commencement Length
km
Stations
 1  Yili Health Valley
(Tumed Left Banner)
Bayan (Airport)
(Saihan)
29 December 2019 21.719[4] 20
 2  Talidonglu
(Xincheng)
A'ershanlu
(Saihan)
1 October 2020 27.32[5] 24

Annual urban-rail passenger volume reported for Hohhot by CAMET. Values are passenger-trips in units of 10,000; reporting scope may include non-metro urban-rail modes and can vary by year.[6]

Passenger volume (10,000 passenger-trips)Year0200040006000800010,0002019202020212022202320242025HohhotAnnual urban rail passenger volume in HohhotCAMET reported city network; scope may include non...

Year-end urban-rail operating length reported for Hohhot by CAMET, separating the metro series from the all-mode city total where both are reported.[6]

Operating length (km)Year202530354045502019202020212022202320242025Hohhot all modes (km)Hohhot metro (km)Urban rail operating length in Hohhot by modeYear-end length reported by CAMET

Line 1

The first phase of Line 1 is 21.719 km (13.5 mi)[4] long. The color for Line 1 is red.[7]

Line 1 began construction in April 2016 and was opened on 29 December 2019.[1][4]

Line 2

The first phase of Line 2 is 27.32 km (17.0 mi)[5] long. It was opened on 1 October 2020.[5] The color for Line 2 is blue.

Future development

Lines 3, 4, 5 and 6 are under planning.[8]

See also

References

  1. 1 2 "官宣!呼和浩特地铁1号线12月29日开始初期运营". 2019-12-27. Archived from the original on 2022-11-24. Retrieved 2019-12-27.
  2. ↑ Smith, Kevin (2020-01-02). "Hohhot opens first metro line". International Railway Journal. Retrieved 2023-04-30.
  3. ↑ "想询问一下呼市地铁推动交通联合的进展". 人民网领导留言板. 2023-08-15. Archived from the original on 2025-01-19. Retrieved 2024-07-16.
  4. 1 2 3 "呼和浩特市城市轨道交通1号线一期工程昨起初期运营". 2019-12-30. Archived from the original on 2020-01-02. Retrieved 2020-01-11.
  5. 1 2 3 "呼和浩特市地铁2号线10月1日起开通初期运营". 2020-10-01. 正线全长27.32km
  6. 1 2 China Association of Metros, 2012 annual statistical report and 2025 annual statistical report. The linked Commons data pages identify the intervening annual reports and preserve their source URLs.
  7. ↑ "地铁真的要来了!". 2019-09-26.
  8. ↑ "地铁3、4、5、6号线要来,呼和浩特交通这样布局". 2021-11-11. Archived from the original on 2022-02-26.