Dovey Junction railway station

Dovey Junction

Welsh: Cyffordd Dyfi
National Rail
Platforms 1 & 2a with 2b in the distance (2024)
General information
LocationDerwenlas, Powys
Wales
Coordinates52°33′50″N 3°55′26″W / 52.564°N 3.924°W / 52.564; -3.924
Grid referenceSN697980
ManagerTransport for Wales
Platforms2
Other information
Station codeDVY[1]
ClassificationDfT category F2
History
Opened14 August 1867
Key dates
1 July 1904Renamed Dovey Junction
Passengers
2020/21Decrease 1,692
 Interchange Decrease 920
2021/22Increase 7,030
 Interchange Increase 2,575
2022/23Increase 9,190
 Interchange Increase 4,370
2023/24Increase 14,610
 Interchange Increase 7,847
2024/25Increase 41,454
 Interchange Increase 13,454
Location
Notes
Passenger statistics from the Office of Rail and Road

Dovey Junction (/ˈdʌviː-/ DUH-vee-; Welsh: Cyffordd Dyfi) is a railway station on the Cambrian Line in Wales. It is the junction where the line splits into the line to Aberystwyth and the Cambrian Coast Line to Pwllheli. Passenger services are provided by Transport for Wales. There is a single island platform. It is sited between Machynlleth to the east, Borth to the south, and Penhelig to the north, and is measured 79 miles 3 chains (127.2 km) from Whitchurch via Oswestry.[2]

The station is in Powys, about 440 yards (400 m) north-east of the junction of three counties: the current principal areas of Ceredigion, Powys and Gwynedd, corresponding to the traditional counties of Cardiganshire, Montgomeryshire and Merionethshire.

History

Looking towards Machynlleth in 2007, before the addition of the passing loop

The station was opened on 14 August 1867 as Glan Dovey Junction.[3] It was renamed Dovey Junction in 1904.[4]

The station has been rebuilt twice: the original Cambrian Railways buildings were first replaced in the 1970s by a flat-roofed station building.[5] This building was subsequently replaced in the 1990s by a simple bus shelter, having fallen into a state of disrepair and being far larger than required at this remote location.[5]

The station platforms were raised in 2008 in conjunction with raising of the tracks, to reduce the likelihood of closure of this section of line due to flooding.[6] The work was part of a major programme of work on the Cambrian Line, including ERTMS signalling to replace the previous RETB system (installed in 2011),[7] and an extended (dynamic) passing loop at Welshpool to permit running an hourly service from Shrewsbury-Aberystwyth in the future.

The station house at the end of the path to the A487 was previously the stationmaster's house for Glandyfi station, but is now in private residence.[5]

Location

The station is in the midst of the Dyfi National Nature Reserve, near the Cardigan Bay coast.[5] There is no settlement here but a 0.6-mile (1 km) footpath, from the western end of the Aberystwyth platform, provides passenger access to and from the hamlet of Glandyfi in Ceredigion, and to a main road (the A487).[8]

Facilities

As many passengers merely change trains at the station, there are only basic facilities, including a shelter, a help point, benches and live departure screens.[9]

Passenger volume

Passenger volume at Dovey Junction[10]
2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23 2023–24 2024–25
Entries and exits 1,093 1,062 1,430 1,978 1,494 1,768 1,482 1,288 1,694 1,828 2,366 3,740 4,084 4,434 4,622 4,292 1,692 7,030 9,190 14,610 41,454
Interchanges 5,327 3,755 4,161 936 491 722 941 1,218 1,397 1,046 1,029 7,748 9,035 9,312 9,321 8,097 920 2,575 4,370 7,847 13,454

The statistics cover twelve month periods that start in April.

Services

A train bound for Birmingham International calls at Dovey Junction (2024)

Trains call at least every two hours in each direction throughout the day (Mon–Sat), rising to once an hour during the morning and afternoon peaks and into the early evening. Platform 2 (east side) is used by services to/from Borth and Aberystwyth and platform 1 (west side) by trains along the coast to Barmouth and Pwllheli. Most trains serve both branches, with units joining or dividing at Machynlleth to make a 4-coach set east of there, though some trains (especially on Sundays) run between Birmingham or Shrewsbury and Aberystwyth only (some trains on both branches also start or end at Machynlleth).[11] Platform 2 is split into 2a at the north end, alongside a passing loop, used by trains bound for Shrewsbury and Birmingham and 2b at the south end used by services bound for Aberystwyth allowing the branch to have a clock face hourly service at peak times.

On Sundays, there is a 2-hourly service between Shrewsbury and Aberystwyth all year, plus three trains each way in summer to/from Pwllheli but just a single train each way in the winter months.

Preceding station   National Rail National Rail   Following station
Transport for Wales
Transport for Wales
  Historical railways  
Penhelig
Line and station open
  Cambrian Railways
Aberystwith and Welsh Coast Railway
  Machynlleth
Line and station open
Glandyfi
Line open, station closed
   

Community rail

The station, along with all others on the Cambrian Line, is part of the Cambrian Railway Partnership, a community rail organisation.[12]

References

  1. ↑ "Railway Codes". railwaycodes.org.uk. Retrieved 27 September 2022.
  2. ↑ Brailsford, Martyn, ed. (2023). Railway Track Diagrams; 3: Western & Wales (7th ed.). Frome: TRACKmaps. p. 33. ISBN 978 1999627164.
  3. ↑ Quick 2023, p. 167.
  4. ↑ "Cambrian Railway Company. Alteration of Station Name". Montgomeryshire Echo. Wales. 16 July 1904. Retrieved 7 December 2017 – via British Newspaper Archive.
  5. 1 2 3 4 Caton 2018, pp. 96–100.
  6. ↑ "£13M WORK BEGINS TO IMPROVE SERVICES ON CAMBRIAN LINE". Network Rail Media Centre. Retrieved 15 August 2026.
  7. ↑ "Cambrian line growth". www.modernrailways.com. 23 November 2017. Retrieved 15 August 2026.
  8. ↑ Geoff Marshall (3 May 2024). The Most Isolated Station in Wales - Dovey Junction. Wales: Geoff Marshall. Event occurs at 8:45. Retrieved 3 May 2024.
  9. ↑ "Dovey Junction Station | National Rail". www.nationalrail.co.uk. Retrieved 15 August 2026.
  10. ↑ "Estimates of station usage | ORR Data Portal". dataportal.orr.gov.uk. Retrieved 11 June 2026.
  11. ↑ Table 76 National Rail timetable, May 2017
  12. ↑ "Partnership". The Cambrian Line. Retrieved 15 August 2026.

Bibliography

Further reading