Line 9 (Chongqing Rail Transit)

Line 9
9
A train of Line 9 passing Jiahua railway bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
OwnerChongqing City Transportation Development & Investment Group
Line number9
LocaleChongqing, China
Termini
Stations31 (29 in operation)
Service
TypeRapid transit
SystemChongqing Rail Transit
OperatorChongqing Rail Transit Operation Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022 (2022-01-25)
Technical
Line length40.00 km (24.85 mi)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Xinqiao depot
Xinqiao
Gaotanyan
Tianlilu
Shapingba
Bus interchange China Railway
Xiaolongkan
Tuwan
Hongyancun
Fuhualu
Hualongqiao
Jiahua Rail Transit Bridge
across Jialing River
Lijiaping
Mahuangliang
Guanyinqiao
3
Liyuchi
Liujiatai
Jiangbeicheng
Wulidian
Gailanxi
Line 4 to Shimahelijiao
Toutang
Baoshuigang
Cruise Port Station
Line 4 to Huangling
Hejialiang
Shipanhe
Shangwanlu
Taiwan Industrial Park depot
Qinggangping
Baoshenghu
Xingke Ave.
Chunhua Ave.
Langui Ave.
Central Park East
Congyansi
Huashigou
Huashigou depot
=
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China. This line contains the highest and deepest metro stations in the world, Hualongqiao station and Hongyancun station, respectively.

History

The line began construction on September 28, 2016.

Opening timeline

SegmentCommencementLengthStation(s)Name
Gaotanyan – Xingke Ave.[a][1] 25 January 2022 31.3 km (19.4 mi) 23 Phase 1
Baoshenghu 28 July 2022[2] infill station 1
Xingke Ave. – Huashigou 18 January 2023 7.8 km (4.8 mi)[3] 5 Phase 2
  1. ↑ except Cruise Port Station and Baoshenghu stations.

Stations

Service
routes
Station
No.
Station name Connections Distance
km
Location
English Chinese
9
/
1
Xinqiao 新桥 - 0.0 Shapingba
●●
9
/
2
Gaotanyan 高滩岩 1.9 1.9
●●
9
/
3
Tianlilu 天梨路 1.2 3.0
●●
9
/
4
Shapingba 沙坪坝      Loop line      Line 1  27 
China Railway CYW
1.3 4.3
●●
9
/
5
Xiaolongkan 小龙坎      Line 1 1.0 5.3
●●
9
/
6
Tuwan 土湾 1.1 6.3
●●
9
/
7
Hongyancun 红岩村      Line 5 1.2 7.6 Yuzhong
●●
9
/
8
Fuhualu 富华路      Line 18 1.1 8.7
●●
9
/
9
Hualongqiao 化龙桥 1.9 10.6
●●
9
/
1
Lijiaping 李家坪 1.6 12.2 Liangjiang
●●
9
/
11
Mahuangliang 蚂蝗梁 0.9 13.0
●●
9
/
12
Guanyinqiao 观音桥      Line 3[a] 1.0 14.0
●●
9
/
13
Liyuchi 鲤鱼池      Line 10 1.7 15.7
●●
9
/
14
Liujiatai 刘家台 1.2 16.9
●●
9
/
15
Jiangbeicheng 江北城      Line 6 1.0 17.9
●●
9
/
16
Wulidian 五里店      Loop line      Line 6 1.2 19.1
●●
9
/
17
Gailanxi 溉澜溪 1.0 20.1
●●
9
/
18
Toutang 头塘      Line 4 1.7 21.9
●●
9
/
19
Baoshuigang 保税港      Line 4 1.4 23.2
||
9
/
2
Cruise Port Station 邮轮母港 0.9 24.1
●●
9
/
21
Hejialiang 何家梁 0.7 24.8
●●
9
/
22
Shipanhe 石盘河 1.6 26.4
●●
9
/
23
Shangwanlu 上湾路      Line 10 1.9 28.3
●●
9
/
24
Qinggangping 青岗坪 1.7 30.0
●●
9
/
25
Baoshenghu 宝圣湖  15  2.0 32.0
●●
9
/
26
Xingke Ave. 兴科大道 1.2 33.2
●
9
/
27
Chunhua Ave. 春华大道 2.3 35.5
●
9
/
28
Langui Ave. 兰桂大道 1.0 36.5
●
9
/
29
Central Park East 中央公园东      Line 10 1.2 37.6
●
9
/
3
Congyansi 丛岩寺 2.6 40.2
●
9
/
31
Huashigou 花石沟 1.1 41.3
  1. ↑ out of system transfer

References

  1. ↑ "轨道九号线一期本月开通运营". Archived from the original on January 10, 2022. Retrieved January 10, 2022. 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. ↑ "重庆地铁9号线一期宝圣湖站28日14时开通运营".
  3. ↑ "重庆地铁9号线二期通过项目工程验收". 重庆地铁9号线二期工程(兴科大道—花石沟)线路全长约7.8公里,共设5座车站