Chongqing East railway station
![]() The station in September 2025 | |||||||
| Chinese name | |||||||
| Simplified Chinese | 重庆东站 | ||||||
| Traditional Chinese | 重慶東站 | ||||||
| |||||||
| General information | |||||||
| Location | 518 Kaicheng Avenue[1] Changshengqiao Town, Nan'an District, Chongqing China | ||||||
| Coordinates | 29°29′13″N 106°40′10″E / 29.48693°N 106.66931°E | ||||||
| Operator | China Railway Chengdu Group | ||||||
| Line | Chongqing–Xiamen high-speed railway (June 27, 2025)[2] | ||||||
| Platforms | 29 (14 island, 1 side) | ||||||
| Tracks | 29 | ||||||
| Connections | |||||||
| Construction | |||||||
Structure type | Elevated | ||||||
| Other information | |||||||
| Station code | 30074 | ||||||
| Classification | Special Class station (特等站) | ||||||
| History | |||||||
| Opened | June 27, 2025 | ||||||
| |||||||
Chongqing East railway station (Chinese: 重庆东站) is a major passenger railway station in Nan'an District, Chongqing, China. It is one of the three main passenger hubs in the Chongqing railway network and on opening, according to Time Out magazine, became one of the largest passenger stations in the world.[3]
History
The station location in Chaoyuan New Area was first officially published by the Chongqing Municipal Planning and Natural Resources Bureau in November 2018.[4] Construction officially began on 22 November 2018, concurrent with work on the Yú–Qián Intercity Railway (渝黔城际铁路).[4]
By April 2024, major structural works such as roofing, interior fit-out, and M&E systems were in progress, together with road and bridge works in the surrounding area.[5] The station opened to passengers on 27 June 2025.[4]
Layout
The station has 29 tracks and 15 platforms in total: 14 island platforms and one side platform, with six through (mainline) tracks.[4]
The large station building is designed to support a significant passenger volume. It includes associated facilities such as storage and maintenance yards for both high-speed and conventional trains.[4]
Lines
Chongqing East serves multiple lines, including:
- Chongqing Railway Hub East Ring Line (重庆铁路枢纽东环线)
- Yuxiang high-speed railway (渝湘高速铁路, Chongqing–Qiannan segment)
- Zhengyu high-speed railway (under construction)
- Yukun high-speed railway (under construction)
When fully operational, the station will host both high-speed and conventional passenger services.
Metro station
Chongqingdong Railway Station 重庆东站 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Entrance 4 | |||||||||||
| General information | |||||||||||
| Location | Chongqingdong Railway Station Nan'an District, Chongqing China | ||||||||||
| Coordinates | 29°29′16″N 106°40′04″E / 29.48778°N 106.66778°E | ||||||||||
| System | Chongqing Rail Transit | ||||||||||
| Operator | Chongqing Rail Transit Operation Co., Ltd. | ||||||||||
| Lines | Line 6 Line 24 (U/C) Line 27 (U/C) | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | |||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code |
/
| ||||||||||
| History | |||||||||||
| Opened | 27 June 2025 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||

Chongqingdong Railway Station of Chongqing Rail Transit is the metro station beneath the CR station. Line 6, Line 8, Line 24, and Line 27 will stop here.[6][7][8] The branch of Line 6 was opened on June 27, 2025. Lines 24 and 27 are under construction, and Line 8 is part of long-term planning that has not been approved by NDRC.
Exits
- 3: Chongqingdong Railway station (exit-only)
- 4: Bus, Parking E
- 5: Bus, Parking F & H
- 6: Parking G
Development
The station area is planned as a transit-oriented development (TOD) zone, with hotels, office buildings, shopping centers, and cultural facilities.[4] It is a strategic hub in the national "Eight Vertical and Eight Horizontal" high-speed railway network, enhancing connectivity between western and eastern regions of China.[4]
Expected travel times after full completion include:
- About 1 hour to Wanzhou, Qianjiang, Chengdu, and Guiyang
- About 3 hours to Wuhan, Kunming, and Changsha
- About 6 hours to Beijing, Shanghai, and Guangzhou[5]
Gallery
Main entrance
Main entrance from the side
Waiting hall
See also
- Nagoya station - previously the world's largest station
- Chongqing railway station
- Chongqing North railway station
- Chongqing West railway station
- Chongqing Rail Transit
- China Railway Chengdu Group
References
- ↑ "重庆市南岸区市场监督管理局食品经营许可(餐饮)基本信息" (xlsx). 重庆市市场监督管理局. Retrieved 2 March 2026.
- ↑ "国铁集团:渝厦高铁重庆东至黔江段6月27日开通运营". 25 June 2025. Archived from the original on 25 June 2025.
- ↑ "China's Chongqing East Station Is Now The World's Largest Train Station"
- 1 2 3 4 5 6 7 "重庆东站". Chinese Wikipedia (in Chinese).
- 1 2 "重庆东站建设加快推进" (in Chinese). Chongqing Municipal Government. 18 April 2024.
- ↑ "轨道交通6号线东延项目可研获批 全长6.7公里". cq.people.com.cn. 16 January 2022. Retrieved 9 September 2022.
- ↑ "重庆新开工4条轨道线路 看看这些站有没有经过你家". cq.people.com.cn. 2 March 2021. Retrieved 9 September 2022.
- ↑ "重庆轨道交通27号线开工_施工". Sohu. 11 November 2021. Retrieved 9 September 2022.
External links
Media related to Chongqingdong Railway Station at Wikimedia Commons

