Berrylands railway station
| Berrylands | |
|---|---|
![]() The view from the DOWN end of platform 1 at Berrylands, prior to works commencing | |
| Interactive map of Berrylands | |
| General information | |
| Location | Berrylands |
| Local authority | Royal Borough of Kingston upon Thames |
| Managed by | South Western Railway |
| Station code | BRS |
| DfT category | E |
| Number of platforms | 2 |
| Tracks | 4 |
| Fare zone | 5 |
| National Rail annual entry and exit | |
| 2020–21 | |
| 2021–22 | |
| 2022–23 | |
| 2023–24 | |
| 2024–25 | |
| Key dates | |
| 16 October 1933 | Opened |
| 11 May 2026 | Temporarily closed |
| Other information | |
| External links | |
| Coordinates | 51°23′56″N 0°16′49″W / 51.3988°N 0.2803°W |
Berrylands railway station is a National Rail station serving the neighbourhood of Berrylands in the borough of Kingston upon Thames, London. It is 10 miles 78 chains (17.7 km) south-west of London Waterloo and is situated between New Malden and Surbiton.[2]
History

It was opened on 16 October 1933 to serve large housing developments, which gave the station its name.[3] 90% of the cost of the station was financed by the local developers to enhance the attractiveness of the new estate to commuters.[4]
A modern ground level station (1969) is connected by stairs to the platforms, which are on the outer tracks of the four-track main line. Berrylands is one of the few stations around the London area still constructed with wooden platforms,[5] although the platforms had an extension in 2014.[6]
Network Rail temporarily closed the station on Monday 11 May 2026[7], and it is planned to remain as such until late September 2026[7]. This is to replace the original wooden platforms, and to upgrade the rest of the station.[6][8] The closure will also allow for an upgrade to the station facilities, including new lighting, help points, CCTV, and Customer Information Screens.[9][10] During this time, South Western Railway are providing half-hourly rail replacement bus services between New Malden and Berrylands, and between Berrylands and Surbiton (and vice versa in both cases), with approximate journey times of 12 minutes in either direction.[10]
Passenger volume
| 2002–03 | 2004–05 | 2005–06 | 2006–07 | 2007–08 | 2008–09 | 2009–10 | 2010–11 | 2011–12 | 2012–13 | 2013–14 | 2014–15 | 2015–16 | 2016–17 | 2017–18 | 2018–19 | 2019–20 | 2020–21 | 2021–22 | 2022–23 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Entries and exits | 182,658 | 191,698 | 174,464 | 329,473 | 354,882 | 375,638 | 339,894 | 359,072 | 374,064 | 378,024 | 389,012 | 405,862 | 374,332 | 374,746 | 382,686 | 400,700 | 373,514 | 88,366 | 233,480 | 288,216 |
The statistics cover twelve month periods that start in April.
Services
All services at Berrylands are operated by South Western Railway. The typical off-peak service in trains per hour is:[12]
- 2 tph to London Waterloo via Wimbledon
- 2 tph to Hampton Court
Additional services call at the station during the peak hours.
If built, Crossrail 2 is planned to serve Berrylands on the way to Hampton Court, with four trains per hour in each direction.[13]
| Preceding station | Following station | |||
|---|---|---|---|---|
| New Malden | South Western Railway |
Surbiton | ||
Connections
London Buses route K2 and school route 665 serve the station.
References
- 1 2 3 4 5 "Table 1415: Time series of passenger entries, exits and interchanges by station, Great Britain, annual data, April 1997 to March 2025" (ODS). Office of Rail Regulation. 4 December 2025. Archived from the original on 9 March 2026. Note: Methodology may vary year-on-year.
- ↑ Bridge, Mike, ed. (2017). TRACKatlas of Mainland Britain: A Comprehensive Geographic Atlas Showing the Rail Network of Great Britain (3rd ed.). Sheffield: Platform 5 Publishing Ltd. p. 116. ISBN 978 1909431 26 3.
- ↑ Quick 2023, p. 79.
- ↑ "Berrylands Station". Layers of London. Retrieved 28 January 2025.
- ↑ "London & Suburbs Page 1". Archived from the original on 9 May 2008. Retrieved 2 August 2008.
- 1 2 "Berrylands station wood platform repairs to close the station for several months". ianVisits. 25 April 2025. Retrieved 6 April 2026.
- 1 2 "Berrylands Station Upgrade". Network Rail. Retrieved 21 June 2026.
- ↑ "Berrylands Station Upgrade". Network Rail. Retrieved 6 April 2026.
- ↑ Longhorn, Danny (1 April 2026). "Network Rail and South Western Railway carrying out £6 million upgrade for Berrylands station". RailBusinessDaily. Retrieved 6 April 2026.
- 1 2 "berrylands [sic] station upgrade". 21 June 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Estimates of station usage | ORR Data Portal". dataportal.orr.gov.uk. Retrieved 24 December 2023.
- ↑ Table 152 National Rail timetable, December 2023
- ↑ "Crossrail 2 Factsheet: Services between Berrylands and Hampton Court" (PDF). crossrail2.co.uk. October 2015. Retrieved 6 April 2026.
Bibliography
- Quick, Michael (2023). Railway Passenger Stations in Great Britain: A Chronology (PDF) (5th ed.). London: Railway and Canal Historical Society.
External links
- Train times and station information for Berrylands railway station from National Rail
.jpg)