BRP Leyte (LD-604)

Philippines
NameBRP Leyte
NamesakePhilippine province of Leyte
Ordered20 July 2022
BuilderPT PAL Indonesia
Laid downscheduled July 2026
Launchedscheduled early 2027
StatusUnder construction
General characteristics
Class & typeTarlac-class Flight II landing platform dock
DisplacementStandard: 7,200 tons
Length124 m (406 ft 10 in)
Beam21.8 m (71.5 ft)
Height21.8 m (71 ft 6 in)
Draft6.7 m (22 ft 0 in)
Installed power4 × diesel generators
Propulsion
Speed16 knots (30 km/h; 18 mph) @ 85% MCR
Range9,360 nmi (17,330 km; 10,770 mi) @ 13 knots (24 km/h; 15 mph) cruising speed
Endurance30 days (crew), 15 days (full)
Boats & landing
craft carried
  • 2 × LCU or LCM at floodable well decks
  • 2 × RHIB or LCVP at boat davits
  • Capacity to carry 2 x Multi-Purpose Attack Craft (MPAC) Mk. 3 interdiction boats[1]
Capacity500 troops plus associated vehicles and equipment
Complement121 crew (including air crew)
Sensors &
processing systems
  • X-band & S-band navigational radars
  • Forward Looking Infra-Red (FLIR) camera
  • Combat management system (planned)
  • Surface search radar (planned)
  • Air search radar (planned)
  • Electro-Optical Fire Control System (planned)
  • Hull-mounted sonar (planned)
Electronic warfare
& decoys
  • Electronic Warfare Suite (planned)
  • 4 × six-tube Terma C-Guard mortar-type decoy launchers (planned)
Armament
Aircraft carried2 x 10-ton naval helicopter, several VTOL unmanned aerial vehicles
Aviation facilities
  • Hangar for 1 medium (10-ton) helicopter and/or unmanned aerial vehicles
  • Flight deck for 2 medium (10-ton) helicopters

The Leyte (604) is a new 124-meter Landing Platform Dock that is scheduled for delivery and commissioning with the Philippine Navy as the BRP Leyte (LD-604). Thd ship is being constructed by PT PAL Indonesia for the Philippine Navy's Landing Dock Acquisition Project as part the Armed Forces of the Philippines Modernization Program's Horizon 2 phase.

The ship is based on improve sub-class of the previously commissioned Tarlac-class, which was also constructed by PT PAL.[2]

The ship's name was not formally announced by both PT PAL and the Philippine Navy, but was identified as Leyte from a news report.[3]


Development

Concept Design

The Philippine Navy included plans to procure 2 new landing platform docks as part of its Horizon 2 modernization phase, with the proposal with a budget of PHP5.56 billion among those approved in-principle by Philippine President Rodrigo Duterte in June 2018.[2][4] This would allow the Philippine Navy to increase its sealift and amphibious assault capabilities to reach its planned overall capability.[5]

The Philippines' Department of National Defense (DND) signed a contract with Indonesian shipbuilder PT PAL Indonesia on 24 June 2022,[6] with the shipbuilder delivering a variant of their improved 123-meter Strategic Sealift Vessel / Tarlac-class design.[2][7][5]

According to the technical specifications released as part of the project's tender documents, the ship will have improvements over the current Tarlac-class landing platform docks, despite both classes originating from a similar base design.[5] The improvements were formulated based on the Philippine Navy's experience in operating the Tarlac-class, and knowing its strengths and shortcomings.[5]

Among the improvements released publicly, the ships will have improved air conditioning system, larger side ramps, higher vehicle and well deck ceiling,[8] spaces to support MPAC operations, and improved future proofing to accept Fitted for But Not With (FFBNW) subsystems.[2]

Armaments

The Philippine Navy released information to tenderers that the ships are to be built with allowance for a 76-millimeter (3.0 in) Oto Melara 76mm Super Rapid main gun, two 30mm Aselsan SMASH secondary guns, either the Rheinmetall Oerlikon Millennium Gun or the Aselsan GOKDENIZ gun-based close-in weapon systems, and 8 manually operated 12.7mm heavy machine guns.[2]

PT PAL confirmed in released proposals that their submitted landing docks design allows for a 76-millimeter (3.0 in) (3 in) main gun on the foredeck, two stern-facing 30 mm (1.2 in) secondary guns will also be fitted, one each on the port and starboard sides.[2] The weapons systems are supposed to be installed separately by the Philippine Navy after delivery.

Recent procurements by the Philippine Navy indicate that the ships would have eight manually-operated 12.7mm heavy machine guns, specifically the Sarsilmaz SAR127 from Turkiye.[9]

Flight support

Originally, the ships were designed to accommodate two medium-sized (10-ton) helicopters on the flight deck, and one similar-sized helicopter on the hangar, with the specifications emphasizing the US-made Sikorsky Black Hawk and Italian-made AgustaWestland AW139 helicopter as basis. But changes in the Philippine Navy's requirement later on changed the design to have a hangar for one medium (10-ton) helicopter and a flight deck for two medium (10-ton) helicopters.

Ship systems

On 20 July 2024, defense contractor EID, a subsidiary of Cohort plc, announced that it had secured a contract with PT PAL to supply its Integrated Communications Control System (ICCS) for integration into the landing platform docks under construction for the Philippine Navy.[10][11]

Construction

The steel cutting ceremony was conducted on 22 July 2024.[2]

Delays were reported in the construction, as the ship was originally scheduled for launch in mid-2025. PT PAL confirmed the delays and the rectifications to meet its contract obligations, with the ship scheduled to have its keel laid in July 2026.



See also

References

  1. ↑ Montero, Max (2019-06-18). "Discussing the Technical Requirements of the 2 new Landing Platform Docks for the Philippine Navy". MaxDefense Philippines. Retrieved 2023-08-11.
  2. 1 2 3 4 5 6 7 8 9 10 "Landing Docks Acquisition Project". Philippine Defense Resource. 17 June 2019. Archived from the original on 19 October 2023. Retrieved 11 August 2023.
  3. ↑ "Names for new Philippine Navy LPDs identified". MaxDefense Philippines. 1 July 2026. Retrieved 5 July 2026.
  4. ↑ Mangosing, Frances (10 June 2022). "Navy buying more new ships". Inquirer.net. Retrieved 12 August 2023.
  5. 1 2 3 4 "The Philippine Navy's Landing Docks Acquisition Project". Pitz Defense Analysis. 7 August 2022. Retrieved 12 August 2023.
  6. ↑ "Philippines Procures Two More LPD From Indonesia's PT PAL". Naval News. 2022-06-30. Retrieved 2023-08-10.
  7. ↑ "Indonesian firm to build 2 more landing docks for PH". Philippine News Agency. 2022-06-26. Retrieved 2023-08-11.
  8. ↑ "Philippine Navy requests higher tank deck for future LPDs". MaxDefense Philippines. 23 August 2022. Retrieved 5 July 2026.
  9. ↑ "Philippine Navy selects Sarsilmaz for .50-caliber heavy machine guns". MaxDefense Philippines. 28 April 2025. Retrieved 5 July 2026.
  10. ↑ "Two new Philippine Navy LPD's will have military communications systems made in Portugal". EID. 30 July 2024. Retrieved 9 August 2024.
  11. ↑ Ng, Jr (1 August 2024). "EID wins naval communications deal for Philippine sealift vessels". Asian Military Review. Retrieved 9 August 2024.