BRP Ilocos Norte (LD-603)

Philippines
NameBRP Ilocos Norte
NamesakeProvince of Ilocos Norte
Ordered20 July 2022
BuilderPT PAL Indonesia
Laid down22 January 2024
Launched30 June 2026
StatusUnder construction
General characteristics
Class & typeTarlac-class Flight II landing platform dock
DisplacementStandard: 7,200 tons
Length124 m (406 ft 10 in)
Beam21.8 m (71.5 ft)
Height21.8 m (71 ft 6 in)
Draft6.7 m (22 ft 0 in)
Installed power4 × diesel generators
Propulsion
Speed16 knots (30 km/h; 18 mph) @ 85% MCR
Range9,360 nmi (17,330 km; 10,770 mi) @ 13 knots (24 km/h; 15 mph) cruising speed
Endurance30 days (crew), 15 days (full)
Boats & landing
craft carried
  • 2 × LCU or LCM at floodable well decks
  • 2 × RHIB or LCVP at boat davits
  • Capacity to carry 2 x Multi-Purpose Attack Craft (MPAC) Mk. 3 interdiction boats[1]
Capacity500 troops plus associated vehicles and equipment
Complement121 crew (including air crew)
Sensors &
processing systems
  • X-band & S-band navigational radars
  • Forward Looking Infra-Red (FLIR) camera
  • Combat management system (planned)
  • Surface search radar (planned)
  • Air search radar (planned)
  • Electro-Optical Fire Control System (planned)
  • Hull-mounted sonar (planned)
Electronic warfare
& decoys
  • Electronic Warfare Suite (planned)
  • 4 × six-tube Terma C-Guard mortar-type decoy launchers (planned)
Armament
Aircraft carried2 x 10-ton naval helicopter, several VTOL unmanned aerial vehicles
Aviation facilities
  • Hangar for 1 medium (10-ton) helicopter and/or unmanned aerial vehicles
  • Flight deck for 2 medium (10-ton) helicopters

The Ilocos Norte (603) is a new 124-meter Landing Platform Dock that is scheduled for delivery and commissioning with the Philippine Navy as the BRP Ilocos Norte (LD-603). Thd ship is being constructed by PT PAL Indonesia for the Philippine Navy's Landing Dock Acquisition Project as part the Armed Forces of the Philippines Modernization Program's Horizon 2 phase.

The ship is based on an improved sub-class of the previously commissioned Tarlac-class, which was also constructed by PT PAL.[2]

The ship's name was not formally announced by both PT PAL and the Philippine Navy, but was identified as Ilocos Norte from a news report and based on photos from the drydock showing the name painted on the ship's well deck ramp.


Development

Concept Design

The Philippine Navy included plans to procure 2 new landing platform docks as part of its Horizon 2 modernization phase, with the proposal with a budget of PHP5.56 billion among those approved in-principle by Philippine President Rodrigo Duterte in June 2018.[2][3] This would allow the Philippine Navy to increase its sealift and amphibious assault capabilities to reach its planned overall capability.[4]

The Philippines' Department of National Defense (DND) signed a contract with Indonesian shipbuilder PT PAL Indonesia on 24 June 2022,[5] with the shipbuilder delivering a variant of their improved 123-meter Strategic Sealift Vessel / Tarlac-class design.[2][6][4]

According to the technical specifications released as part of the project's tender documents, the ship will have improvements over the current Tarlac-class landing platform docks, despite both classes originating from a similar base design.[4] The improvements were formulated based on the Philippine Navy's experience in operating the Tarlac-class, and knowing its strengths and shortcomings.[4]

Among the improvements released publicly, the ships will have improved air conditioning system, larger side ramps, higher vehicle and well deck ceiling,[7] spaces to support MPAC operations, and improved future proofing to accept Fitted for But Not With (FFBNW) subsystems.[2]

Armaments

The Philippine Navy released information to tenderers that the ships are to be built with allowance for a 76-millimeter (3.0 in) Oto Melara 76mm Super Rapid main gun, two 30mm Aselsan SMASH secondary guns, either the Rheinmetall Oerlikon Millennium Gun or the Aselsan GOKDENIZ gun-based close-in weapon systems, and 8 manually operated 12.7mm heavy machine guns.[2]

PT PAL confirmed in released proposals that their submitted landing docks design allows for a 76-millimeter (3.0 in) (3 in) main gun on the foredeck, two stern-facing 30 mm (1.2 in) secondary guns will also be fitted, one each on the port and starboard sides.[2] The weapons systems are supposed to be installed separately by the Philippine Navy after delivery.

Recent procurements by the Philippine Navy indicate that the ships would have eight manually-operated 12.7mm heavy machine guns, specifically the Sarsilmaz SAR127 from Turkiye.[8]

Flight support

Originally, the ships were designed to accommodate two medium-sized (10-ton) helicopters on the flight deck, and one similar-sized helicopter on the hangar, with the specifications emphasizing the US-made Sikorsky Black Hawk and Italian-made AgustaWestland AW139 helicopter as basis. But changes in the Philippine Navy's requirement later on changed the design to have a hangar for one medium (10-ton) helicopter and a flight deck for two medium (10-ton) helicopters.

Ship systems

On 20 July 2024, defense contractor EID, a subsidiary of Cohort plc, announced that it had secured a contract with PT PAL to supply its Integrated Communications Control System (ICCS) for integration into the landing platform docks under construction for the Philippine Navy.[9][10]

Construction

The steel cutting ceremony was conducted on 10 August 2023.[11] The Keel Laying Ceremony was held on 22 January 2024, at the same time as the First Steel Cutting of its sistership LD-604.[2]

Delays were reported in the construction, as the ship was originally scheduled for launch in late 2024, and there were unconfirmed reports that the keel was instead used to build the first 163-meter landing platform dock for the United Arab Emirates Navy. PT PAL confirmed the delays and the rectifications to meet its contract obligations, with the ship's new keel apparently laid only on January 2026.

The ship was launched in a night ceremony on 30 June 2026, with Philippine Navy Flag Officer in Command Vice Adm. Jose Ma. Ambrosio Ezpeleta present together with top management of PT PAL Indonesia, and other officials from the Indonesian Navy and Indonesian Government.[12]


See also

References

  1. ↑ Montero, Max (2019-06-18). "Discussing the Technical Requirements of the 2 new Landing Platform Docks for the Philippine Navy". MaxDefense Philippines. Retrieved 2023-08-11.
  2. 1 2 3 4 5 6 7 8 9 10 "Landing Docks Acquisition Project". Philippine Defense Resource. 17 June 2019. Archived from the original on 19 October 2023. Retrieved 11 August 2023.
  3. ↑ Mangosing, Frances (10 June 2022). "Navy buying more new ships". Inquirer.net. Retrieved 12 August 2023.{{cite web}}: CS1 maint: url-status (link)
  4. 1 2 3 4 "The Philippine Navy's Landing Docks Acquisition Project". Pitz Defense Analysis. 7 August 2022. Retrieved 12 August 2023.{{cite web}}: CS1 maint: url-status (link)
  5. ↑ "Philippines Procures Two More LPD From Indonesia's PT PAL". Naval News. 2022-06-30. Retrieved 2023-08-10.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "Indonesian firm to build 2 more landing docks for PH". Philippine News Agency. 2022-06-26. Retrieved 2023-08-11.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "Philippine Navy requests higher tank deck for future LPDs". MaxDefense Philippines. 23 August 2022. Retrieved 5 July 2026.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "Philippine Navy selects Sarsilmaz for .50-caliber heavy machine guns". MaxDefense Philippines. 28 April 2025. Retrieved 5 July 2026.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "Two new Philippine Navy LPD's will have military communications systems made in Portugal". EID. 30 July 2024. Retrieved 9 August 2024.
  10. ↑ Ng, Jr (1 August 2024). "EID wins naval communications deal for Philippine sealift vessels". Asian Military Review. Retrieved 9 August 2024.
  11. ↑ "PT PAL Begins Construction Of The Philippine Navy's LPD". Naval News. 2023-08-10. Retrieved 2023-08-11.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "PT PAL launches first new 124-landing platform dock for the Philippines". MaxDefense Philippines. 1 July 2026. Retrieved 5 July 2026.{{cite web}}: CS1 maint: url-status (link)