Albion Viaduct

Albion Viaduct
Bridge viewed from the eastern lookout
Coordinates37°44′49″S 144°50′47″E / 37.747020°S 144.846520°E / -37.747020; 144.846520
CarriesAlbion–Jacana railway line
Crosses
BeginsKeilor East (east)
EndsSunshine North (west)
Official nameMaribyrnong River Viaduct
Other nameQuarter Mile Bridge
OwnerARTC
Preceded by
M80 Western Ring Road
Followed by
Solomons Ford
(pedestrians only)
Characteristics
DesignTrestle bridge
MaterialSteel
Total length383 m (1,257 ft)
Height55 m (180 ft)
No. of spans25
Rail characteristics
No. of tracks2
Track gaugeStandard gauge
History
Constructed byVictorian Railways
Construction start1927
Construction endJune 1929 (1929-06)
Official name
Albion Viaduct
TypeRegistered place
Designated19 September 1996
Reference no.H1197
  • HO05
  • HO107
Category
Transport - Rail
Location
Interactive map of Albion Viaduct
References
[1]

The Albion Viaduct, officially the Maribyrnong River Viaduct, and also known locally as the Quarter Mile Bridge, is a trestle viaduct across the Maribyrnong River and Maribyrnong River Trail that carries the Albion–Jacana railway line, located in the inner western suburbs of Melbourne, in Victoria, Australia. It is located near the E J Whitten Bridge, and is almost 400 metres (1,300 ft) long (hence the Quarter Mile name).

Completed in 1929, the viaduct was added to the Victorian Heritage Register on 19 September 1996 in recognition of its scientific, architectural and historical importance.[2]

History

It was built in 1927–29 by the Victorian Railways Construction Branch to carry a new double track goods line over the Maribyrnong River. The new line enabled trains from all parts of the state, except Gippsland, to have direct access to the Tottenham marshalling and sorting yards, and relieved congestion at the Melbourne Yard.[2]

At the time of its opening, it was the largest trestle bridge in Australia.[3] The viaduct is scientifically and architecturally important on account of its large size, and for the adoption of unusual cost effective design features such as the use of two girders per span to carry the double track, the use of K bracing in the towers, and the use of broad flange beams as columns.[2] Until the completion of the Sydney Harbour Bridge, the viaduct was also the highest railway bridge in Australia. It employed 200 people during its construction, with one fatality.

In 2021, the Victorian Government unveiled plans for the route of the proposed Melbourne Airport Rail that included a new crossing of the river, via a 550-metre (1,804 ft) elevated rail bridge, located adjacent to the Albion Viaduct.[4] The government invited tenders in September 2021,[5] and the contract was awarded to FCC Construction Australia and Winslow Infrastructure in October 2022 and work commenced shortly thereafter.[6][7]

Description

Comprising 25 spans,[8] the viaduct is 383 metres (1,257 ft) long between abutments and 55 metres (180 ft) above water level; and is the second-highest bridge in Victoria after the West Gate Bridge, which is 58 metres (190 ft) high. The structure comprises two steel girders supported on twelve steel framed towers.[3]

The main traffic over the bridge is freight services, but it also carries two passenger services, the Melbourne to Sydney NSW TrainLink XPT, and the Melbourne-Albury V/Line service which now runs on standard gauge.

An internal and external walkway spans the length of the bridge on both sides.

See also

References

  1. ↑ "Albion Viaduct: Beams Arriving for Big Railway Works". The Age. No. 22, 563. 30 July 1927. p. 16. Retrieved 23 April 2017 – via Trove. National Library of Australia.
  2. 1 2 3 "Albion Viaduct, Victorian Heritage Register (VHR) Number H1197, Heritage Overlay HO05,HO107". Victorian Heritage Database. Heritage Victoria. Retrieved 1 July 2026.
  3. 1 2 Payne, Bruce (May 2003). "Albion Viaduct on the Broadmeadows to Albion Line". Bulletin. Australian Railway Historical Society: 186.
  4. ↑ Jacks, Timna (12 April 2021). "Developers, heritage protectors line up over airport rail bridge plans" (includes animation of rail traffic on the existing viaduct and proposed new bridge). The Age. Retrieved 1 July 2026.
  5. ↑ "Tenders invited for Melbourne Airport Rail's Maribyrnong River bridge". Roads and Infrastructure Australia. 16 September 2021. Retrieved 1 July 2026.
  6. ↑ "Start of works, Sunshine Masterplan and Contract announcements". Victoria’s Big Build. Government of Victoria. 15 December 2022. Archived from the original on 4 January 2023. Retrieved 17 December 2022.
  7. ↑ Thompson, John (31 October 2022). "Works commence and contract awarded for $10B Melbourne Airport rail link". Infrastructure Magazine. Archived from the original on 31 October 2022. Retrieved 31 October 2022.
  8. ↑ "Maribyrnong Viaduct Investigation & Strengthening Design". Sterling Infrastructure Group. n.d. Retrieved 1 July 2026.