Yolçatı–Tatvan railway

Yolçatı–Tatvan railway
Overview
Native nameYolçatı–Tatvan demiryolu
StatusOperating
OwnerTurkish State Railways
LocaleEastern Anatolia
Termini
Service
TypeHeavy rail
SystemTurkish State Railways
Operator(s)TCDD Taşımacılık
Körfez Ulaştırma
History
Opened1964
Technical
Line length374 km (232 mi)
Number of tracksSingle track
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrificationno
Operating speed80 km/h (50 mph)
Signallingmanual (Telefonla Merkezden Idare)

The Yolçatı–Tatvan railway (Turkish: Yolçatı–Tatvan demiryolu) is a 374km railway in Turkey, connecting the Adana Malatya Diyarbakir railway to Tatvan. In Tatvan, the railway give connection to a train ferry that crosses the lake to Van. In Van, the ferry connects to a railway line to Iran. [1]

This line was built by the Turkish states railways in sections from 1934 to 1964. Its route was changed three times to accommodate for the building of several dams, resulting in an increase in length over time of about 10 km end to end.

Infrastructure and Route

Starting from Yolçatı, the railway goes north to reach Elazığ almost in a straight line, going downhill. Elazığ is the first major town on the line. From there, the line turns east and continue to go downhill to reach the shore of a lake formed by the Keban Dam[2]. It skirts the south shore of this lake until a bridge near the city of Muratbağı. The line follows the Murat River for about 160km until Kurt. From Muratbağı to Palu, the line is on the right bank of the river. It then crosses the river on a metallic bridge to return to the left bank of the Murat River until the end [3]. This valley is very narrow, almost like a gorge and running slightly uphill. It required many tunnels. From Kurt, the line enters the valley of the Karasu Irmağı river, a small tributary of the Murat river. This valley is about 10km wide with a flat bottom. The line keeps to the south side to arrive into the city Muş, the only other town of importance along the way. The line then crosses to the north side of the valley in order to gain some altitude. It makes a large loop at the feet of the Nemrut Dag, a large volcano to gain altitude. The line summit is reached at Rahova station, at 1790m altitude. Then the railway descends to Tatvan. Just before Tatvan, a 360 degree loop to ease the gradient and it arrives at 1680m in the Tatvan station. From there, a branch of 4,8km descents further to the pier, on the lake shore, where train can be loaded onto the ferry to Van.

In total, there are 126 tunnels for a cumulative length of 50km, this is about 13% of the line total length. Most of those tunnels are located in the narrow section of the valley, between Palu and Kurt.

The longest tunnel is 1950m long and it is located near the Lower Kaleköy Dam [4].

The line has several bridges. The most significant is a 650m bridge over the lac formed by the Lower Kaleköy Dam. It is a curved pre-stressed concrete bridge, set between two tunnels. Another bridge worth mentioning is the Keban reservoir crossing just before Muratbağı. This is a 375m straight bridge, in concrete, parallel a road bridge than was build concurrently and at the exact same elevation. The In all, there are 80 bridges measuring more than 50m[5].

The line is single track, standard gauge, with passing sidings which were roughly 15km apart on average when the line was built. Some of the sidings have been lost or closed. There is a long 46km segment without sidings between Genç and Oymapınar,and another of 38km between Oymapınar and Kurt. The shortest sidings are about 600m long. It is not electrified and operated with diesel traction. The maximum axle loading is 22.5t.

Yolcati Tatvan Railway Elevation
Yolcati Tatvan Railway Elevation

The sidings are in the following stations:

Station and sidings
StationKilometer pointElevationNumber of sidingsSiding length (m)
Yolçatı0.0123041000
Elazığ23.9104061100
Yurt38.388041100
Çağlar46.98602850
Koçkale58.38502750
Konak66.48502800
Muratbağı87.38504650
Palu103.88702600
Beyhan112,79402600
Yeni Suveren144.9101021000
Genç166,810003750
Oymapınar212.9112021000
Kurt251.312402750
Muş275.012805700
Çizmeburun286.512662850
Özden302.212901790
Bahçetepe321.014002850
Sıcaksu334.215502850
Rahova355.717901970
Tatvan369.016806850

The line is operated under manual signaling (Telefonla Merkezden Idare). The trains proceeds from station to station under written train orders transmitted by a line dispatcher. Some stations are protected by a semaphore signal.

Traffic

The line does not serve any town of importance, nor any industry along its way. The stations are built in agricultural villages and the whole area is very sparsely populated. The exception is a very large chrome mine near Muratbağı. This facility alone has the capacity to generate a million ton a year, and 2 trains per day, per direction, every day. In addition to this factory, the line serves a cement and building material near Elazığ and a small petrol terminal near Koçkale. There is also through traffic to Tatvan, Van and beyond to Iran.

The line is also served by a long distance passenger trains:

History

The Turkish Republic intend to built a line to Iran was first announced by Ali_Çetinkaya during a speech he did on November 13, 1935. He was minister of Public Works at this time. However the path from intend to reality was long and complex.

The very first segment of the line was a branch to Elazığ on the Malatya Kurtalan main line. The representatives of Elazığ actively lobbied in Ankara for this main line to go through their town. As this was not technically possible, they obtained a branch instead. It was quickly built thought mostly flat terrain and Elazığ got its railway station in 1934.

The next section from Elazığ to Genç was more complex and was delayed by World_War_II. Works eventually started and this section was inaugurated 30 November 1947. The third section to Muş was completed in 1955. This final leg to Tatvan received support from the CENTO organization[6]. The line to Iran gained strategic status and the USA provided the finance and the support for its completion. The line was completed in 1964.

Line opening date
SectionOpening date
Yolçatı to Elazığ1934
Elazığ to Genç30 November 1947
Genç to Muş1955
Muş to Tatvan1964

The building of the Keban dam in 1973 created a lake that require rebuilding a section of line near Murat. the Murat station was abandoned as well as the original steel girder bridge to cross the Murat River. A second realignment of about 32km was built to avoid the lake created by the Beyhan-1 dam. This new alignment starts shortly after Beyhan station and finishes 5km after Yeni Suveren station. This station replaces the original Suveren station which is now flooded.

A third major realignment of about 84km was caused by the construction of the Aşağı Kaleköy dam and the Yukarı Kaleköy dam. The new route starts after Genç station and finishes 2km before Kurt station. It includes a new station at Oymapınar, about mid way. This new section required major engineering with many tunnels and bridge to keep the line above the new water level. This realignment was completed in 2018[7].

References

  1. ↑ Atilcan, Muhammet (1999). Türkiye Cumhuriyeti Devlet Demiryolları Haritasi. Ankara: TCK Basimevi.
  2. ↑ Robinson, Neil (2006). The middle east and Caucasus. England: World Rail Atlas. p. 34. ISBN 9541201288.
  3. ↑ "OpenStreetMap". OpenStreetMap. Retrieved 23 December 2025.
  4. ↑ "OpenStreetMap". OpenStreetMap. Retrieved 16 November 2025.
  5. ↑ "OpenStreetMap". OpenStreetMap. Retrieved 18 November 2025.
  6. ↑ "US Position on the Turkish-Iranian Railway link". CIA. 28 April 1960.
  7. ↑ "Palu-Genç-Muş realignment 2011- 2018".