Wrocław Grabiszyn railway station
Wrocław Grabiszyn | |||||
|---|---|---|---|---|---|
![]() Platforms in September 2021 | |||||
| General information | |||||
| Location | Grabiszyn-Grabiszynek, Wrocław, Lower Silesian Voivodeship Poland | ||||
| Owner | Polish State Railways | ||||
| Line |
| ||||
| Platforms | 2 | ||||
| History | |||||
| Opened | 14 December 2014 | ||||
| |||||
Wrocław Grabiszyn is a railway station on the Wrocław Świebodzki–Zgorzelec railway in the Grabiszyn-Grabiszynek district of Wrocław in the Lower Silesian Voivodeship in south-western Poland.
Wrocław Grabiszyn is the final station of the Wrocław Świebodzki–Zgorzelec railway before it proceeds to Wrocław Świebodzki, which has been closed since the 1990s.
History
The construction of a railway halt near Klecińska Street (Wrocław's city centre flyover), the location of Wrocław Grabiszyn, was first planned as part of the Wrocław Metropolitan Railway project.[1]
Under the same previous plans as part of the Wrocław Metropolitan Railway project, the construction of Wrocław Grabiszyn began in November 2014. Until its opening, the station was called Wrocław FAT, which was named after nearby factories; Fabryki Automatów Tokarskich.[2] The station was built in under one month as it was intended to serve as a temporary terminus for trains arriving from Jelenia Góra, Wałbrzych Główny, and Jaworzyna Śląska. This was scheduled for the construction works of a flyover above Grabiszyńska Street, which required the tracks to be temporarily dismantled east of the station.[3]
The station opened on 14 December 2014, in conjunction with the implementation of the 2014/2015 annual train timetable. Polregio and Lower Silesian Railways services began serving the station, heading towards Dzierżoniów Śląski, Jelenia Góra, Szklarska Poręba Górna, Wrocław Główny, and Poznań Główny.[4] The total construction cost came to 3.23 million PLN;[3] it was also decided at the same time that Wrocław Grabiszyn would remain a permanent station of the network, and would therefore not be demolished after the construction works.[5]

From 26 April 2015, only Lower Silesian Railways services on the Dzierżoniów–Wrocław route, connected at the station with rail replacement buses, were able to reach the station, whilst construction works were ongoing of the flyover over Grabiszyńska Street.[6] All other trains normally calling or non-stopping at the station had to be diverted after Wrocław Zachodni via the Wrocław Gądów–Wrocław Zachodni railway.[7]
Prior to the construction of the flyover, Klecińska Street ran over the railway with a level crossing, in which the road was demolished for the construction of the flyover. After which, a desire path was created by locals over the railway which was often used to illegally cross it. The path became notorious for causing accidents, after people were struck by passing trains, which often resulted in fatalities.[8] With the construction of the station, safe pedestrian crossing was constructed over the railway.[3]
Station
Wrocław Grabiszyn is a railway halt on the Wrocław Świebodzki–Zgorzelec railway[9] consisting of two high-level side platforms, each 150 metres (490 ft) long and 4 m (13 ft) wide. Thanks to the platform's high-level, the station is accessible.[3] Grabiszyn-Grabiszynek is connected via two entrances at the station to Petuniowa Street.[2]
Train services
The station is served by the following services:
- Regional services (KD) Wrocław - Wałbrzych - Jelenia Góra[10]
- Regional services (KD) Wrocław - Jaworzyna Śląska - Świdnica - Bielawa Góry Sowie[11]
- Regional services (KD) Wrocław - Wałbrzych - Jelenia Góra - Szklarska Poręba Górna[12]
- Regional services (KD) Wrocław - Jaworzyna Śląska - Świdnica - Głuszyca[13]
| Preceding station | KD | Following station | ||
|---|---|---|---|---|
| Wrocław Główny Terminus |
D6 | Wrocław Zachodni towards Jelenia Góra | ||
| D40 | Wrocław Zachodni towards Bielawa Góry Sowie | |||
| D60 | Wrocław Zachodni towards Szklarska Poręba Górna | |||
| D64 | Wrocław Zachodni towards Głuszyca | |||
References
- ↑ "Wrocławska Kolej Aglomeracyjna wciąż w planach. Brak jednak konkretów" [The Wrocław Agglomeration Railway is still in the planning stages. However, there are no specific details.]. Wirtualna Polska (in Polish). 23 July 2014. Archived from the original on 11 May 2017. Retrieved 23 August 2026.
- 1 2 "Powstają nowe przystanki kolejowe" [New railway halts are being built]. Wrocławska Komunikacja (in Polish). 8 November 2014. Archived from the original on 21 June 2015. Retrieved 24 August 2026.
- 1 2 3 4 "Wrocław: nowy przystanek kolejowy [ZDJĘCIA]" [Wrocław: new railway halt [PHOTOS]]. Wrocław.pl (in Polish). 21 November 2014. Archived from the original on 23 November 2014. Retrieved 24 August 2026.
- ↑ "Z centrum na Grabiszyn w 8 minut!" [From the city centre to Grabiszyn in 8 minutes!]. GrabiszynGrabiszynek.pl (in Polish). 18 December 2014. Archived from the original on 3 April 2015. Retrieved 24 August 2026.
- ↑ "Przystanek Wrocław Grabiszyn już służy podróżnym" [Wrocław Grabiszyn station is now serving commuters]. Kurier Kolejowy (in Polish). 18 December 2014. Archived from the original on 19 April 2015. Retrieved 24 August 2026.
- ↑ "KD: ZKA na odcinku Wrocław Grabiszyn–Wrocław Główny" [KD: ZKA on the Wrocław Grabiszyn–Wrocław Główny section]. Kurier Kolejowy (in Polish). 23 April 2015. Archived from the original on 18 May 2015. Retrieved 24 August 2026.
- ↑ "Bez rewolucji na trasie Jelenia Góra - Wrocław" [No resolution on the Jelenia Góra - Wrocław route]. Kurier Kolejowy (in Polish). 1 April 2015. Archived from the original on 4 April 2015. Retrieved 24 August 2026.
- ↑ "Śmierć na nielegalnym przejściu" [Death at illegal crossing]. Wrocław Express (in Polish). Archived from the original on 21 June 2015. Retrieved 24 August 2026.
- ↑ "Regulamin przydzielania tras pociągów i korzystania z przydzielonych tras pociągów przez licencjonowanych przewoźników kolejowych w ramach rjp 2014/2015" [Regulations on the allocation of train routes and the use of allocated train routes by licensed railway carriers under the 2014/2015 rail transport regulations] (PDF). PKP Polskie Linie Kolejowe (in Polish). Archived from the original (PDF) on 13 May 2015. Retrieved 24 August 2026.
- ↑ "D6/D60 Wrocław - Wałbrzych - Jelenia Góra" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.
- ↑ "D40 Wrocław Główny - Jaworzyna Śląska - Świdnica Miasto - Dzierżoniów Śląski - Bielawa Góry Sowie" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.
- ↑ "D6/D60 Wrocław - Wałbrzych - Jelenia Góra - Szklarska Poręba Górna" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.
- ↑ "D64 Wrocław Główny - Jaworzyna Śląska - Świdnica Miasto - Jedlina-Zdrój - Głuszyca" (PDF). Rozkład jazdy (in Polish). Lower Silesian Railways. 14 June 2026.
External links
Media related to Wrocław Grabiszyn train station at Wikimedia Commons



