| Ulanqab–Datong high-speed railway 集大原高速铁路 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Open | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Locale | Shanxi & Inner Mongolia, China | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Type | High-speed rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| System | China Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator(s) | CR Taiyuan Group & CR Hohhot Group | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 137.8 km (85.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Minimum radius |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrification | 25 kV AC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operating speed | 250 km/h (160 mph), 300 km/h (190 mph) (reserved) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Signalling | Automatic block | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Maximum incline | 2% (general) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Ulanqab–Datong high-speed railway (Chinese: 乌大高速铁路; pinyin: Wū dà gāosù tiělù), formerly known as the Jining–Datong–Yuanping high-speed railway, Jining–Datong section (Chinese: 集大原高速铁路集宁至大同段; pinyin: Jí dàyuán gāosù tiělù jí níng zhì dàtóng duàn) is a Chinese high-speed railway connecting Ulanqab in Inner Mongolia to Datong in Shanxi province. The line starts from Ulanqab station in Chahar Right Wing Front Banner in Ulanqab, passes through Fengzhen North in Fengzhen, and ends at Datong South in Datong, Shanxi Province, and connects with the Datong–Zhangjiakou HSR. The total length is 137.8 km (85.6 mi), and it is an important part of the Hohhot–Nanning corridor, one of the Eight Vertical and Eight Horizontal high-speed railway network. The entire line was opened to traffic on 31 December 2024.[1][2]
History
In December 2018, the Ulanqab–Datong high-speed railway was incorporated into the study of its predecessor, the Jining–Datong–Yuanping high-speed railway, and design work was carried out. The project was initiated by the National Development and Reform Commission and led by China Railway Corporation.[3]
On 27 March 2019, the Shanxi Provincial Development and Reform Commission, together with the Inner Mongolia Autonomous Region Development and Reform Commission, held a meeting to promote the preliminary work of the Jining–Datong–Yuanping HSR. In December, Inner Mongolia Railway Investment Co., Ltd. and Shanxi Datong–Yuanping Railway Co., Ltd. commissioned China Railway Design Group Co., Ltd. to carry out the environmental impact assessment of the Jining–Datong–Yuanping HSR. On 12 December, the environmental impact assessment of the Jining–Datong–Yuanping HSR was publicly announced for the first time.[4] On 27 December, the National Development and Reform Commission approved the Feasibility Study Report for the New Jining–Datong–Yuanping Railway.[5]
On 18 May 2020, the second environmental impact assessment announcement for the Jining–Datong–Yuanping HSR was issued.[6][7] On 30 June, the groundbreaking ceremony for the Jining–Datong–Yuanping HSR was held in Shuozhou City.[8]
On 17 November 2021, construction officially began on the Shanxi section.[9]
On 29 May 2023, the continuous beam of the Jining–Datong–Yuanping HSR across the Beijing–Baotou railway was successfully rotated into place.[10] On 4 September, the box girder of the Jida-Yuanping high-speed railway across the Beijing-Baotou passenger dedicated line was successfully erected.[11]
On 16 March 2024, China State Railway Group Co., Ltd. issued a notice announcing the names of the newly built Jining–Datong–Yuanping HSR, among which the Ulanqab–Datong South section was named the Ulanqab–Datong high-speed railway.
On 28 September 2024, the laying of tracks for the entire Ulanqab–Datong HSR was completed.[12][13] On 4 October, the high-speed railway entered the joint commissioning and testing phase.[14] On 26 November, the entire Urumqi–Datong HSR entered the operation test phase.[15] On 17 December, the China State Railway Group acceptance team held a preliminary acceptance summary meeting for the Jining–Datong–Yuanping HSR project. At the summary meeting, the whole Jining–Datong–Yuanping HSR project passed the preliminary acceptance. On 18 December, the Jining–Datong–Yuanping HSR entered the safety assessment phase.[16] On 31 December, the Urumqi–Datong HSR officially opened for operation, thus allowing the central regions and cities of Inner Mongolia to connect to the south via the high-speed railway.[2][17]
References
- ↑ "中长期铁路网规划" [Medium and long-term railway network planning] (PDF) (in Chinese). Archived from the original (PDF) on 12 October 2021. Retrieved 26 August 2021.
- 1 2 "集宁经大同至原平高铁12月31日开通运营" [The high-speed railway from Jining to Yuanping via Datong will open on 31 December]. Xinhua News Agency (in Chinese). 30 December 2024. Archived from the original on 30 December 2024. Retrieved 27 August 2026.
- ↑ "新建大同至原平铁路客运专线变更环境影响报告书" [Environmental Impact Report for the New Datong–Yuanping Passenger Dedicated Line (Amendment)] (PDF) (in Chinese). Shuozhou Municipal People's Government. 17 April 2018. Archived from the original (PDF) on 17 November 2021. Retrieved 26 August 2026.
- ↑ "新建铁路集宁经大同至原平铁路环境影响评价第一次信息公示" [First Public Announcement of Environmental Impact Assessment for the New Jining–Datong–Yuanping Railway] (in Chinese). Datong Municipal People's Government. 13 December 2019. Archived from the original on 17 November 2021. Retrieved 26 August 2026.
- ↑ "国家发展改革委关于新建集宁经大同至原平铁路可行性研究报告的批复" [Approval from the National Development and Reform Commission of the Feasibility Study Report for the New Jining–Datong–Yuanping Railway] (in Chinese). National Development and Reform Commission. 17 December 2019. Archived from the original on 17 November 2021. Retrieved 26 August 2026.
- ↑ "新建铁路集宁经大同至原平铁路环境影响评价第二次信息公告" [Second Information Announcement on Environmental Impact Assessment of the New Jining-Datong-Yuanping Railway] (in Chinese). Datong Municipal People's Government. 18 May 2020. Archived from the original on 17 November 2021. Retrieved 27 August 2026.
- ↑ "新建铁路集宁经大同至原平铁路环境影响报告书" [Environmental Impact Report for the New Jining–Datong–Yuanping Railway] (PDF) (in Chinese). Datong Municipal People's Government. 18 May 2020. Archived from the original (PDF) on 17 November 2021. Retrieved 27 August 2026.
- ↑ "集宁经大同至原平高速铁路开工建设" [Construction begins on the Jining–Datong–Yuanping high-speed railway] (in Chinese). Datong Municipal People's Government. 30 June 2020.
{{cite web}}: CS1 maint: url-status (link) - ↑ "集大原铁路山西段正式开工建设!" [Construction officially began on the Shanxi section of the Jida-Yuanping Railway!] (in Chinese). WeChat. 17 November 2021. Archived from the original on 17 November 2021. Retrieved 27 August 2026.
- ↑ "集大原高铁跨京包铁路连续梁成功转体" [The continuous beam of the Datong-Yuanping high-speed railway across the Beijing-Baotou railway successfully rotated]. Xinhua News Agency (in Chinese). 29 May 2023. Archived from the original on 30 May 2023. Retrieved 27 August 2026.
- ↑ "集大原高铁跨京包客运专线箱梁架设成功" [The box girder of the Datong-Yuanping high-speed railway crossing the Beijing-Baotou passenger dedicated line was successfully erected]. hangzhou.com (in Chinese). Xinhua News Agency. 5 September 2023. Archived from the original on 6 September 2023. Retrieved 27 August 2026.
- ↑ "集大原高铁恒山隧道项目建设正稳步推进" [Construction of the Hengshan Tunnel project of the JidaYuanping High-speed Railway is progressing steadily]. Shuozhou News Network. WeChat. 6 October 2024. Archived from the original on 7 October 2024.
- ↑ "集大原高铁全线铺轨完成" [Track laying completed along the entire Datong-Yuanping high-speed railway] (in Chinese). China Railway. 29 September 2024. Archived from the original on 7 October 2024. Retrieved 27 August 2026.
- ↑ "集大原高铁内蒙古段进入联调联试阶段" [The Inner Mongolia section of the Jida-Yuanping high-speed railway has entered the joint commissioning and testing phase] (in Chinese). 4 October 2024. Archived from the original on 7 October 2024. Retrieved 27 August 2026.
- ↑ "集大原高铁全线进入运行试验阶段" [The entire Datong-Yuanping high-speed railway has entered the operational testing phase.]. 新华网 (in Chinese). 27 November 2024. Archived from the original on 27 January 2025. Retrieved 27 August 2026.
- ↑ "整体工程通过初步验收 集大原高铁力争本月底开通" [The entire project has passed preliminary acceptance; the Datong-Yuanping high-speed railway aims to open by the end of this month]. Datong News Network (in Chinese). 18 December 2024. Archived from the original on 29 May 2025. Retrieved 27 August 2026.
- ↑ 张倩; 杨震 (6 January 2025). "7小时4分钟!郑州东至呼和浩特东高铁"上线"" [7 hours and 4 minutes! The Zhengzhou East to Hohhot East high-speed railway goes online]. Zhengzhou Evening News (in Chinese). Archived from the original on 7 October 2025. Retrieved 28 August 2026.