Subedarganj–Lokmanya Tilak Terminus Amrit Bharat Express
| Subedarganj – Mumbai LTT Amrit Bharat Express | |||||
|---|---|---|---|---|---|
![]() | |||||
| Overview | |||||
| Service type | Amrit Bharat Express, Superfast | ||||
| Status | Active | ||||
| Locale | Uttar Pradesh, Madhya Pradesh and Maharashtra | ||||
| First service | 24 August 2026 (Inaugural) 27 August 2026 (Commercial) | ||||
| Current operator | North Central Railways (NCR) | ||||
| Route | |||||
| Termini | Subedarganj (SFG) Lokmanya Tilak Terminus (LTT) | ||||
| Stops | 20 | ||||
| Distance travelled | 1,670 km (1,038 mi) | ||||
| Average journey time | 32 hrs 40 mins | ||||
| Service frequency | Weekly | ||||
| Train number | 14121/14122 | ||||
| Lines used | |||||
| On-board services | |||||
| Classes | Sleeper class coach (SL) General unreserved coach (GS) | ||||
| Seating arrangements | Yes | ||||
| Sleeping arrangements | Yes | ||||
| Auto-rack arrangements | Upper | ||||
| Catering facilities | No | ||||
| Observation facilities | Saffron-grey | ||||
| Entertainment facilities |
| ||||
| Other facilities | |||||
| Technical | |||||
| Rolling stock | Modified LHB coaches | ||||
| Track gauge | Indian gauge | ||||
| Electrification | 25 kV 50 Hz AC overhead line | ||||
| Operating speed | 51 km (32 mi) (Avg.) | ||||
| Track owner | Indian Railways | ||||
| Rake sharing | Yes | ||||
| |||||
The 14121/14122 Subedarganj–Mumbai LTT Amrit Bharat Express is India's 40th Non-AC Superfast Amrit Bharat Express train, which runs across the states of Uttar Pradesh Madhya Pradesh and Maharashtra by connecting Subedarganj of Prayagraj, the growing transit hub in Uttar Pradesh with Lokmanya Tilak Terminus of Mumbai, the financial capital of Maharashtra.[1][2]
The express train is inaugurated on 2026 by Honorable Prime Minister Narendra Modi through video conference.[3]
Overview
The train is operated by Indian Railways, connecting Subedarganj and Lokmanya Tilak Terminus. It is currently operated 14121/14122 on weekly basis.
Rakes
It is the 40th Amrit Bharat 2.0 Express train in which the locomotives were designed by Chittaranjan Locomotive Works (CLW) at Chittaranjan, West Bengal and the coaches were designed and manufactured by the Integral Coach Factory at Perambur, Chennai under the Make in India Initiative.
Schedule
| Train No. | Station Code | Departure Station | Departure Time | Departure Day | Arrival Station | Arrival Hours |
|---|---|---|---|---|---|---|
| 14121 | SFG | Subedarganj | 12:10 PM | Lokmanya Tilak Terminus | 08:50 PM | 32h 40m |
| 14122 | LTT | Lokmanya Tilak Terminus | 10:50 PM | Subedarganj | 07:30 AM | 32h 40m |
Routes and halts
The important halts of the train are :
Rake reversal or rake share
No rake reversal or rake share.
See also
Notes
a. Runs a day in a week with both directions.
References
- ↑ "Railway Board approves 7 new Amrit Bharat Express trains – check routes, stops". The Indian Express. 13 August 2026. Retrieved 19 August 2026.
- ↑ Shah, Priyanshi (14 August 2026). "7 New Amrit Bharat Express Trains Approved Across India; Check Routes, Schedule & More!". Curly Tales. Retrieved 19 August 2026.
- ↑ "Hamirpur News: सूबेदारगंज-लोकमान्य तिलक टर्मिनस के बीच चलेगी अमृत भारत एक्सप्रेस". Amar Ujala (in Hindi). Retrieved 19 August 2026.

