Skifska gas field

About OpenStreetMaps
Maps: terms of use
200km
124miles
Skifska
Skifska
CountryUkraine
RegionBlack Sea
Offshore/onshore
offshore
Coordinates44°00′N 32°18′E / 44°N 32.3°E / 44; 32.3
OperatorRoyal Dutch Shell, ExxonMobil, Petrom, Nadra
Field history
Discovery2012
Start of development
2012
Production
Current production of gas
15×10^6 m3/d
550×10^6 cu ft/d 5×10^9 m3/a (180×10^9 cu ft/a)
Estimated gas in place
250×10^9 m3
8.875×10^12 cu ft

Skifska is a license block located in the Ukrainian zone on the continental shelf of the Black Sea. In 2012, the rights to a production sharing agreement (PSA) for production in the field of Skifska were given to a consortium of Royal Dutch Shell, ExxonMobil, OMV Petrom, and Nadraa Ukrainy. It was expected that future production from the PSA would yield around 550 million cubic feet per day (16×10^6 m3/d). However, negotiations for the PSA afterwards were repeatedly delayed, and in January 2014 Royal Dutch Shell backed out of the agreement. No new plans have been made for it since.

History

In May 2012, the Ukrainian government announced a tender for the right of a production sharing agreement (PSA) for Skifska.[1] The tender required that the investor would conduct seismic investigations and drill at least one exploration well within five years of signing the tender.[1] On 13 August 2012, it was awarded to a consortium consisting of Royal Dutch Shell, ExxonMobil, Petrom, and Nadra Ukrainy.[2] There was one competing bidder, the Russian company Lukoil.[2] However, the project was mainly part of Ukraine's attempt at the time to reduce its dependence on Russian gas imports.[2] The shares in the consortium were ExxonMobil getting 40%, Shell 35%, OMV Petrom 15%, and Nadra 10%.[3] The projected costs of the development were $10-12 billion.[3] However, at the time of the announcement, the head of Nadra Pavlo Zagorodnuk said the development was a significant risk for the company since it was largely unexplored territory, even if the adjacent Neptun block on the Romanian side had also been explored by Exxon and OMV Petrom.[4]

It was estimated that if the project was successful, it would reduce Ukraine's Russian gas imports by around 10%.[5] Original plans intended to start the exploration programme in 2015 on the block with estimated natural gas and condensates resources in the range of 200 to 250 billion cubic metres (7.1×10^12 to 8.8×10^12 cu ft).[2] Potential future production contingent to success during the exploration campaign could yield around 550 million cubic feet per day (16×10^6 m3/d).[6]

However, following the tender being signed, negotiations were delayed for a while. In September 2013, then Minister of Power Generation, Eduard Stavytsky, announced that the representatives of the consortium had signed an interim agreement on concluding the PSA, which was intended to extend the negotation period for the PSA.[1] In January 2014, the PSA was delayed by Exxon, with Stayvtsky saying it would be signed in February 2014.[3] Royal Dutch Shell stopped their negotiations over a production sharing agreement later that month in January.[7]

References

  1. 1 2 3 "PSA on Skifska Area: To Sign Impossible To Waste" (PDF). files.pca-cpa.org. Retrieved 17 May 2026.
  2. 1 2 3 4 "Exxon, Shell-led group win $10 billion Ukraine gas project". Reuters. 15 August 2012. Retrieved 17 May 2026.
  3. 1 2 3 "СРП по Скифскому участку отложено в очередной раз. Теперь по инициативе Exxon Mobil". neftegaz.ru. Retrieved 17 May 2026.
  4. ↑ "Розробка Скіфської нафтогазової площі несе в собі високі ризики, - експерт". РБК-Украина (in Russian). 1 September 2012. Retrieved 17 May 2026.
  5. ↑ "Ukraine picks Western firms for offshore gas project". Euractiv. 16 August 2012. Retrieved 17 May 2026.
  6. ↑ "ExxonMobil and Shell won bid on Black Sea Skifska gas field". 2b1stconsulting.com. 2012. Retrieved 2013-04-28.
  7. ↑ Zinets, Natalia (2014-03-19). "Shell pulled out of gas field talks in Ukraine in January". Reuters. Retrieved 2014-03-28.