Pingguoyuan station

Pingguoyuan[1]

苹果园
Beijing Subway
Line 1 platform

Line 6 platform

Line S1 originating platform
General information
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E / 39.926727; 116.177388
OperatorBeijing Mass Transit Railway Operation Corp., Ltd
Lines     Line 1
     Line 6
     Line S1
Platforms6 (1 island platform and 4 side platforms)
Tracks6
Construction
Structure type
Underground (Line 1 & Line 6)
Elevated (Line S1)
AccessibleYes
Other information
Statusin service
Station code103 (Line 1)
History
OpenedApril 23, 1973 (1973-04-23) (Line 1; initial)
December 31, 2021 (2021-12-31)[2] (Lines 6 and S1)
May 16, 2026 (2026-05-16) (Line 1; reopen[3])
ClosedApril 18, 2020 (2020-04-18) (Line 1)
Services
Preceding station Beijing Subway Following station
Terminus Line 1 Gucheng
Jin'anqiao
Terminus
Line 6 Yangzhuang
towards Luyang
Jin'anqiao
towards Shichang
Line S1 Terminus
Under renovation
Fushouling
Terminus
Line 1
Projected to reopen 2027+
Gucheng
Location
Pingguoyuan is located in Beijing
Pingguoyuan
Pingguoyuan[1]
Location within Beijing

Pingguoyuan station[1] (Chinese: 苹果园站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.

The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 closed for renovation on April 18, 2020 and reopened on May 16, 2026[3], as part of renovation and integration of Pingguoyuan Transit Terminal. The station for Line 6 and Line S1 was opened on December 31, 2021.

The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

Station layout

Platform panorama of pre-renovated ine 1 Pingguoyuan station.

The line 1 of Pingguoyuan station has two underground side platforms. Both were the only two platforms in the Beijing Subway that didn't have platform gates installed when the station closed on April 18, 2020 due to the aging of platform devices. The platform gates were installed after the station reopened.[4]

Line 6 has an underground island platform and Line S1 has 2 elevated side platforms.

Exits

There are 11 exits, lettered A, B, C, D, E, F, G, H, I and J.

Prior of the renovation of Line 1, there are four exit lettered A, B, C and D. Exit A and B are connected to platform towards to Universal Resort station, and Exit C and D are connected to terminus platform.[5] Following the renovation of Line 1 platform, Exit A and B are merged into the new exit A, and exit C and D are merged into new exit B. The exit C and D are reassign to new-build exits connect to Pingguoyuan Transit Terminal.

The exit E, F, G and H are connected to Line 6's platform, and exit I and J are connected to Line S1's platform. Exit E, F, H, I and J are opened on 31 December 2021 with extension of Line 6 and Line 1, and Exit G is opened on 26 May 2026 with reopening of Line 1 platform.

For accessibility entrance, Exit A, B and G are accessible via elevators, and exit F and H have stairlifts. One extra unlettered exit connect between Line 1 platform and Pingguohui Shopping Mall, is accessible via elevator.

Line 1

Line 6 & Line S1

References

  1. 1 2 3 "JPG格式线路图下载 北京地铁官方网站".{{cite web}}: CS1 maint: deprecated archival service (link)
  2. ↑ "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20. Archived from the original on 2023-10-30. Retrieved 2020-01-12.
  3. 1 2 北京地铁 (2026-05-15). "5月16日首班车起,地铁1号线苹果园、古城、八宝山3座车站恢复运营". 微信 (in Chinese).
  4. ↑ "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.
  5. ↑ 1号线. Beijing Subway 北京地铁官方网站 (in Chinese). Archived from the original on 2020-04-05. Retrieved 2020-10-21.
  • Wikimedia Commons logo Media related to Pingguoyuan Station at Wikimedia Commons