Park West and Cherry Orchard railway station

Park West & Cherry Orchard

Páirc an Iarthiar & Gort na Silíní
Iarnród Éireann
A view of Park West and Cherry Orchard station looking east.
General information
LocationPark West Avenue, Dublin, D12 PX44
Ireland
Coordinates53°20′06″N 6°21′54″W / 53.335°N 6.365°W / 53.335; -6.365
OwnerIarnród Éireann
OperatorIarnród Éireann
Platforms4
Tracks4
Bus operators
Connections
  • G1
  • 860
Construction
Structure type
At-grade
AccessibleYes
Other information
Station codeCHORC
Fare zoneSuburban 1
History
Opened28 July 2008 (2008-07-28)
Location

Park West and Cherry Orchard railway station (also known as Park West on automated Irish Rail station announcements) is an Iarnród Éireann railway station in Ballyfermot, Dublin, Ireland, serving the Park West and the Cherry Orchard area.

Description

The station opened on 28 July 2008, replacing the former Cherry Orchard and Parkwest Station located nearby. It is located in on the Dublin - Cork main line (the pre-Grouping Great Southern & Western Railway) and is served by South Western Commuter services.

South Western Commuter
Dublin Heuston Luas
 
Inchicore
Works
 
Park West and
Cherry Orchard
Clondalkin/Fonthill
Kishoge
Adamstown
Hazelhatch and Celbridge
Sallins and Naas
Newbridge
Kildare
Monasterevin
Portarlington
Portlaoise
Conniberry Junction
Togher Inland Port (planned)
Portlaoise Traincare Depot

Former Cherry Orchard station

The former station, Cherry Orchard and Parkwest - originally simply called Cherry Orchard - opened on 16 May 1994.[1] It was closed on 27 July 2008 as part of the Kildare Route Project,[2] and demolished later in 2008.[3]

Services

Train Services

Preceding station Iarnród Éireann Following station
Dublin Heuston   Commuter
South Western Commuter
  Clondalkin/Fonthill
Drumcondra    

Bus Services

Bus operaters that serve the station include Dublin Bus, Express Bus and Fair Isle Tours

Passenger numbers

YearsDaily Passenger Boardings and Alightings [4]Change
2012266-
2013269Increase 3
2014355Increase 86
2015467Increase 112
2016462Decrease 5
2017881Increase 419
2018 1066 Increase 185

The station benefited from increased passenger numbers with the opening of the Phoenix Park Tunnel for commuter services in November 2016 allowing direct services to Drumcondra, Connolly Station and Grand Canal Dock bypassing Heuston Station.[5]

See also

References

  1. ↑ "Cherry Orchard station" (PDF). Railscot - Irish Railways. Retrieved 31 August 2007.
  2. ↑ "Rail Services Updates". Iarnród Éireann. Archived from the original on 15 February 2019.
  3. ↑ "Cherry Orchard - 2008". eiretrains.com. Retrieved 26 May 2022.
  4. ↑ "National Heavy Rail Census Report 2018" (PDF). National Transport Authority. July 2019. Retrieved 12 May 2020.
  5. ↑ "Phoenix Park Tunnel opens for Commuter services after €13.7 million investment". National Transport Authority. 21 November 2016. Retrieved 12 May 2020.