Northport–Norwalk Harbor Cable

Northport-Norwalk Harbor Cable
Location
CountryUnited States of America
FromNorwalk Harbor Substation, Norwalk, Connecticut
ToNorthport Substation, Northport, New York
Ownership information
OwnerCL&P, Connecticut and Long Island Power Authority
Construction information
Commissioned1969 (original cables)
2008 (current cables)
Technical information
TypeUndersea; Underground
Total length11 mi (18 km)

The Northport–Norwalk Harbor Cable (Also known as the Northport-Norwalk Intertie or the 1385 Cable) is a 138-kV Submarine cable that runs between Norwalk, Connecticut, and Northport, New York, – the latter of which is located on Long Island.[1]

Description

The Northport–Norwalk Harbor Cable travels beneath the Long Island Sound between the Norwalk Harbor substation at NRG's Norwalk Harbor Generating Station in Norwalk, Connecticut, and the Northport Substation at LIPA's Northport Power Station in Northport, New York, serving as a connection between the New York Control Area and the New England Control Area – which are managed by the New York Independent System Operator and ISO New England, respectively – and their respective wholesale electricity markets.[2][3] It is an undersea 138-kV cable that stretches for approximately 11 miles (18 km).[3]

The cables consist of seven single-conductor cables, with six of those cables operating as a 300 MW circuit composed of two sets of three cables – each having a 150 MW capacity.[3]

This cable system is one of eight high voltage transmission facilities that connect Connecticut's transmission facilities with those of other states, allowing for the importing and exporting of energy.[3]

History

The Northport–Norwalk Harbor Cable was first installed in 1969, allowing a more efficient way for electricity to flow between Connecticut and Long Island, and reducing pressure upon the networks by increasing capacity.[3][4][5] At the time, it was the longest underwater electric transmission line in the United States.[6]

The cables were completely replaced with a modern cable system in 2008.[4][7][8]

See also

References

  1. ↑ "Implementing the Northport-Norwalk Intertie as a Scheduled Line". New York Independent System Operator. 2007-03-20.
  2. ↑ "Scheduling Transactions at the Proxy Generator Bus Associated with the Northport-Norwalk Scheduled Line". New York Independent System Operator. 2020-02-20.{{cite news}}: CS1 maint: year (link)
  3. 1 2 3 4 5 "Docket No 224 Opinion". CT.gov - Connecticut's Official State Website. Retrieved 2026-04-05.
  4. 1 2 "Long Island Sound Cable Replacement Project Nears Completion". T & D World. 2008-05-22. Retrieved 2022-03-25.
  5. ↑ Gazzana-Priaroggia, P.; Piscioneri, J. H.; Margolin, S. W. (1971-10-01). "The Long Island Sound submarine cable interconnection". IEEE Spectrum. 8 (10): 63–71. doi:10.1109/MSPEC.1971.5217807. ISSN 0018-9235. S2CID 51676036.
  6. ↑ Reid, Teresa (2020-01-25). "Let There Be Light: The History of LILCO in Northport". Teresa Reid. Retrieved 2022-03-22.
  7. ↑ "Northport - Norwalk Harbor Cable (NNC) Tie line: Technical Assessment of Operating up to NNC Inter Tie STE Ratings" (PDF). Long Island Power Authority. 2008-09-19. Retrieved 2022-03-25.
  8. ↑ "Long Island Replacement Cable Project: Northport, N.Y. and Norwalk, Conn". ENR New York. 2009-12-16. Retrieved 2022-03-25.