List of Chennai Metro stations

Chennai Metro Phase 1 and extension map

The Chennai Metro is a rapid transit system serving the city of Chennai and its suburbs. Phase I of the project consisted of two corridors covering a length of 54.15 kilometres (33.65 mi).[1] The elevated section of the project began operations in June 2015, with the entire elevated stretch operational as of October 2016.[2] The entire project was completed within the financial year 2019–2020. About 55% of the corridors in Phase I are underground and the remaining corridors are elevated.[3] Phase II is currently under construction.[4]

Metro stations

Operational

† Terminal station
* Transfer station to other lines
†* Transfer station to Chennai Suburban
** Terminal and transfer station to Chennai Suburban
†† Terminal and transfer station to Chennai MRTS and Chennai Suburban
*# Transfer station to Chennai Suburban and Indian Railways
†¤ Terminal, transfer station to other lines, Chennai Suburban, Chennai MRTS and Indian Railways

Under-construction

Chennai Metro Phase 2 map (U/C)
Station name Line Opened Layout Notes Ref.
English Tamil
Adambakkam ஆதம்பாக்கம் Red Line December 2026 Elevated –
Adyar Depot அடையாறு பணிமனை Purple Line December 2027 Underground –
Adyar Junction அடையாறு சந்திப்பு Purple Line December 2027 Underground –
Alapakkam Junction ஆலப்பாக்கம் சந்திப்பு Yellow Line
Red Line
December 2026 Elevated –
Alwarpet ஆழ்வார்பேட்டை Yellow Line April 2027 Underground –
Alwarthirunagar ஆழ்வார்திருநகர் Yellow Line
Red Line
December 2026 Elevated –
Anna Flyover அண்ணா மேம்பாலம் Purple Line December 2027 Underground –
Anna Nagar KV அண்ணா நகர் கே.வி Red Line December 2026 Elevated –
Anna Nagar West அண்ணா நகர் மேற்கு Red Line December 2026 Elevated –
Assisi Nagar அசிசி நகர் Red Line December 2027 Elevated –
Ayanavaram அயனாவரம் Purple Line December 2027 Underground –
Bharathidasan Road பாரதிதாசன் சாலை Yellow Line April 2027 Underground –
Boat Club படகு குழாம் Yellow Line April 2027 Underground –
Butt Road பட் சாலை Red Line December 2026 Elevated –
Chennai Trade Centre சென்னை வர்த்தக மையம் Red Line July 2026 Elevated –
Chetpet சேத்துப்பட்டு Purple Line December 2027 Underground –
Classical Tamil Institute செம்மொழித் தமிழாய்வு நிறுவனம் Red Line December 2026 Elevated –
Dr. Radhakrishnan Salai டாக்டர் ராதாகிருஷ்ணன் சாலை Purple Line December 2027 Underground –
Echangadu ஈச்சங்காடு Red Line December 2026 Elevated –
Elcot எல்காட் Red Line December 2026 Elevated –
Gandhi Nagar காந்தி நகர் Purple Line December 2026 Elevated –
Greenways Road பசுமைவழிச் சாலை Purple Line December 2027 Underground –
Indira Nagar இந்திரா நகர் Purple Line December 2027 Underground –
Kandanchavadi கந்தன்சாவடி Purple Line December 2026 Elevated –
Karambakkam காரம்பாக்கம் Yellow Line
Red Line
December 2026 Elevated –
Karapakkam காரப்பாக்கம் Purple Line December 2026 Elevated –
Karayanchavadi கரையான்சாவடி Yellow Line June 2026 Elevated –
Kattupkkam காட்டுப்பாக்கம் Yellow Line June 2026 Elevated
Kellys கெல்லீஸ் Purple Line December 2027 Underground –
Kilkattalai கீழ்க்கட்டளை Red Line December 2026 Elevated –
Kodambakkam கோடம்பாக்கம் Yellow Line February 2027 Underground –
Kodambakkam Powerhouse கோடம்பாக்கம் பவர்ஹவுஸ் Yellow Line July 2026 Elevated –
Kolathur Junction கொளத்தூர் சந்திப்பு Red Line December 2028 Underground –
Kovilambakkam கோவிலம்பாக்கம் Red Line December 2026 Elevated –
Koyambedu Market கோயம்பேடு அங்காடி Red Line December 2026 Elevated –
Kumananchavadi குமணன்சாவடி Yellow Line June 2026 Elevated –
Kutchery Road கச்சேரி சாலை Yellow Line April 2027 Underground –
Lighthouse கலங்கரை விளக்கம் Yellow Line April 2027 Underground –
Iyyapanthangal ஐயப்பன்தாங்கல் Yellow Line June 2026 Elevated –
Madhavaram Bus Terminus மாதவரம் பேருந்து நிலையம் Red Line December 2027 Elevated –
Madhavaram Depot மாதவரம் பணிமனை Red Line December 2027 At-grade –
Madhavaram High Road மாதவரம் நெடுஞ்சாலை Purple Line December 2027 Underground –
Madhavaram Milk Colony மாதவரம் பால் பண்ணை Purple Line
Red Line
December 2027 Underground –
Madipakkam மடிப்பாக்கம் Red Line December 2026 Elevated –
Manapakkam மணப்பாக்கம் Red Line July 2026 Elevated –
Mandaveli மந்தைவெளி Purple Line December 2027 Underground –
Manjambakkam மஞ்சம்பாக்கம் Red Line December 2027 Elevated –
Medavakkam I மேடவாக்கம் I Red Line December 2026 Elevated –
Medavakkam II மேடவாக்கம் II Red Line December 2026 Elevated –
Mettukuppam மேட்டுக்குப்பம் Purple Line December 2026 Elevated –
Moolakadai மூலக்கடை Purple Line December 2027 Underground –
Mugalivakkam முகலிவாக்கம் Red Line July 2026 Elevated –
Mullaithottam முல்லைத்தோட்டம் Yellow Line June 2026 Elevated –
Natesan Nagar நடேசன் நகர் Red Line December 2026 Elevated –
Navallur நாவலூர் Purple Line December 2026 Elevated –
Nehru Nagar நேரு நகர் Purple Line December 2026 Elevated –
Nookampalayam Depot நூகம்பாளையம் பணிமனை Purple Line December 2026 Elevated –
Nungambakkam நுங்கம்பாக்கம் Purple Line December 2027 Underground –
Okkiyam Thoraipakkam ஒக்கியம் துரைப்பாக்கம் Purple Line December 2026 Elevated –
Okkiyampet ஒக்கியம்பேட்டை Purple Line December 2026 Elevated –
Otteri ஓட்டேரி Purple Line December 2027 Underground –
Panagal Park பனகல் பூங்கா Yellow Line February 2027 Underground –
Pattalam பட்டாளம் Purple Line December 2027 Underground –
Perambur பெரம்பூர் Purple Line December 2027 Underground –
Perambur Barracks Road பெரம்பூர் பேரக்ஸ் சாலை Purple Line December 2028 Underground –
Perambur Market பெரம்பூர் அங்காடி Purple Line December 2027 Underground –
Perumbakkam பெரும்பாக்கம் Red Line December 2026 Elevated –
Perungudi பெருங்குடி Purple Line December 2026 Elevated –
Poonamallee பூவிருந்தவல்லி Yellow Line June

2026

Elevated –
Poonamallee Bypass பூவிருந்தவல்லி புறவழிச்சாலை Yellow Line Elevated –
Porur Junction போரூர் சந்திப்பு Yellow Line Elevated –
Porur Bypass போரூர் புறவழிச்சாலை Yellow Line Elevated –
PTC Colony பி.டி.சி. காலனி Purple Line December 2026 Elevated –
Purasaiwakkam புரசைவாக்கம் Purple Line December 2027 Underground –
Ramapuram ராமாபுரம் Red Line July 2026 Elevated –
Retteri Junction ரெட்டேரி சந்திப்பு Red Line December 2027 Elevated –
Royapettah ராயப்பேட்டை Purple Line December 2027 Underground –
Saligramam சாலிகிராமம் Yellow Line July 2026 Elevated –
Saligramam Warehouse சாலிகிராமம் கிடங்கு Yellow Line July 2026 Elevated –
Sembiyum செம்பியம் Purple Line December 2027 Underground –
Semmancheri I செம்மஞ்சேரி I Purple Line December 2026 Elevated –
Semmancheri II செம்மஞ்சேரி II Purple Line December 2026 Elevated –
Shastri Nagar Chennai சாஸ்திரி நகர் Red Line December 2027 Elevated –
Sholinganallur சோழிங்கநல்லூர் Red LinePurple Line December 2026 Elevated –
Sholinganallur Lake I சோழிங்கநல்லூர் ஏரி I Purple Line December 2026 Elevated –
Sholinganallur Lake II சோழிங்கநல்லூர் ஏரி II Purple Line December 2026 Elevated –
SIPCOT I சிப்காட் 1 Purple Line December 2026 Elevated –
SIPCOT II சிப்காட் 2 Purple Line December 2026 Elevated –
Siruseri சிறுசேரி Purple Line December 2026 Elevated –
Srinivasa Nagar சீனிவாச நகர் Red Line December 2028 Underground –
Sterling Road ஸ்டெர்லிங் சாலை Purple Line December 2028 Underground –
Taramani தரமணி Purple Line December 2027 Underground –
Thelliyaragaram தெள்ளியார் அகரம் Yellow Line June 2026 Elevated –
Thirumayilai திருமயிலை Yellow Line
Purple Line
April 2027 Underground –
Thiruvanmiyur திருவான்மியூர் Purple Line December 2027 Underground –
Thoraipakkam துரைப்பாக்கம் Purple Line December 2026 Elevated –
Ullagaram உள்ளகரம் Red Line December 2026 Elevated –
Valasaravakkam வளசரவாக்கம் Yellow Line
Red Line
December 2026 Elevated –
Vanuvampet வானுவம்பேட்டை Red Line December 2026 Elevated –
Vellakkal வெள்ளக்கல் Red Line December 2026 Elevated –
Velmurugan Nagar வேல்முருகன் நகர் Red Line December 2027 Elevated –
Villivakkam வில்லிவாக்கம் Red Line December 2028 Underground –
Villivakkam Bus Terminus வில்லிவாக்கம் பேருந்து நிலையம் Red Line December 2028 Underground –
Villivakkam CTH Road வில்லிவாக்கம் சி.டி.எச் சாலை Red Line December 2028 Underground –
Virugambakkam விருகம்பாக்கம் Red Line December 2026 Elevated –

Depots

Sr no. Station name Line Opened Layout Notes Refs
English Tamil
1 Koyambedu Depot கோயம்பேடு பணிமனை  Green Line  29 June 2015 At-grade – –
2 Wimco Nagar Depot விம்கோ நகர் பணிமனை  Blue Line  14 March 2022 Elevated
3 Poonamallee Depot பூவிருந்தவல்லி பணிமனை  Yellow Line  July 2026 At-grade
4 Madhavaram Depot மாதவரம் பணிமனை  Red Line  TBD At-grade
5 Semmancheri Depot செம்மஞ்சேரி பணிமனை  Purple Line  Elevated
6 Pattabiram Depot பட்டிபிராம் பணிமனை  Red Line  TBD

Interchange stations

Sr no. Station name Line Layout Notes Refs
English Tamil
1 Puratchi Thalaivar Dr. M.G. Ramachandran Central புரட்சித் தலைவர் டாக்டர். எம்.ஜி. இராமச்சந்திரன் சென்ட்ரல் Green Line Blue Line Underground
2 Arignar Anna Alandur அறிஞர் அண்ணா ஆலந்தூர் Green Line

Blue LineRed Line

Elevated
3 Vadapalani வடபழனி Green Line Yellow Line
4 Kilpauk கீழ்ப்பாக்கம் Green Line

Purple Line

Underground
5 Nandanam நந்தனம் Blue Line

Yellow Line

6 Koyambedu கோயம்பேடு Green Line

Red Line

Elevated
7 St. Thomas Mount பரங்கிமலை Green Line

Red Line

8 Thirumangalam திருமங்கலம் Green Line

Red Line

9 Thousand Lights ஆயிரம் விளக்கு Blue Line

Purple Line

Underground
10 Thirumayilai திருமயிலை Yellow Line

Purple Line

11 Madhavaram Milk Colony மாதவரம் பால் பண்ணை Red Line

Purple Line

12 Valasaravakkam வளசரவாக்கம் Yellow Line

Red Line

Elevated
13 Karambakkam காரம்பாக்கம்
14 Alwarthiru Nagar ஆழ்வார்திருநகர்
15 Alapakkam Junction ஆலப்பாக்கம் சந்திப்பு
16 Sholinganallur சோழிங்கநல்லூர் Red Line Purple Line

Statistics

Total number of metro stations 145
Total number of metro stations operational 40
Total number of metro stations under construction 105
Number of interchange stations 14
Number of elevated stations 80
Number of underground stations 64
Number of at-grade stations 1

See also

References

  1. ↑ "Over 6 Crore people have travelled through Chennai Metro". The Hindu. 28 January 2020. Retrieved 29 January 2020.
  2. ↑ "Chennai's First Metro rail ride begins". The Hindu. 29 June 2015. Retrieved 3 April 2016.
  3. ↑ "Stations in Chennai Metro rails Phase I extension will be renamed". The Hindu. 5 October 2020. Retrieved 6 October 2020.
  4. ↑ "Chennai Metro Rail Phase II to be completed in 6 years". The Hindu. 28 November 2020. Retrieved 28 November 2020.
  5. ↑ "AG DMS metro station to sport fresh blue look". Times of India. 14 September 2020. Retrieved 15 September 2020.
  6. ↑ "AG DMS Metro station gets a makeover". The Hindu. 19 November 2020. Retrieved 20 November 2020.
  7. ↑ "Fans in Underground Metro stations to beat the heat". The Hindu. 15 June 2019. Retrieved 16 June 2019.
  8. ↑ "Subway work at Anna Nagar Roundtana nears completion". The Hindu. 13 July 2019. Retrieved 14 July 2019.
  9. ↑ "Metro Rail to build subway at Anna Nagar". Times of India. 11 October 2018. Retrieved 12 October 2018.
  10. ↑ "Operation of Chennai's Six metro stations handed over to contract staff". The New Indian Express. 2 September 2019. Retrieved 3 September 2019.
  11. ↑ "Three Chennai Metro stations renamed after Anna, MGR and Jayalalithaa". The Hindu. 31 July 2020. Retrieved 1 August 2020.
  12. ↑ "Chennai metro rail launches e-bike services". Times of India. 18 September 2020. Retrieved 19 September 2020.
  13. ↑ "Chennai Metro Comes halt 4 hours after Bird hit causes glitch". The News Minute. 7 October 2017. Retrieved 8 October 2017.
  14. ↑ "Chennai Metro stations bear vandals fury". Deccan Chronicle. 25 January 2017. Retrieved 26 January 2017.
  15. ↑ "Chennai Metro stations get foot operated elevators". Times of India. 28 September 2020. Retrieved 29 September 2020.
  16. ↑ "Major Metro mishap averted at Ashok Nagar metro station". News Today. 30 January 2019. Retrieved 31 January 2019.
  17. ↑ "Airport Metro station most used by commuters in Chennai". The Hindu. 16 September 2020. Retrieved 17 September 2020.
  18. ↑ "Chennai:More Metro stations to house eateries retail outlets soon". The Hindu. 16 March 2020. Retrieved 17 March 2020.
  19. ↑ "Chennai Metro takes steps to smoothen inter modal connectivity at Egmore". The Hindu. 29 February 2020. Retrieved 1 March 2020.
  20. ↑ "Southern railway Issues notice to metro rail over parking lot". The New Indian Express. 12 December 2019. Retrieved 13 December 2019.
  21. ↑ "Two more metro stations get parking lots". The Hindu. 18 March 2016. Retrieved 19 March 2016.
  22. ↑ "CMRL Plans shopping malls at Ekkattuthungal Arumbakkam". Times of India. 23 February 2019. Retrieved 24 February 2019.
  23. ↑ "Anna Subway near Chennai Metro's Government Estate station opened after renovation". The New Indian Express. 16 September 2020. Retrieved 17 September 2020.
  24. ↑ "Rainwater Streams into Metro stations". The Hindu. 30 October 2020. Retrieved 31 October 2020.
  25. ↑ "Double Discharge platforms soon to ease commuter congestion at chennai's guindy station". The Hindu. 2 March 2020. Retrieved 3 March 2020.
  26. ↑ "Chennai Metro last leg of blue line metro service opens for passengers". Financial Express. 12 February 2019. Retrieved 13 February 2019.
  27. ↑ "Metro drops plan to link High Court Metro station with Fort ST george". Times of India. 23 January 2020. Retrieved 24 January 2020.
  28. ↑ "CMRL Mulls linking High Court metro station with Secretariat". Times of India. 1 January 2019. Retrieved 2 January 2019.
  29. 1 2 3 4 5 6 7 8 Cuenca, Oliver (16 February 2021). "Chennai Metro inaugurates Blue Line extension". International Railway Journal. IRJ. Retrieved 18 February 2021.
  30. ↑ "Metro's Phase II to connect city's major hospital's". The Hindu. 27 April 2019. Retrieved 28 April 2019.
  31. ↑ "Metro Rail Transplants Chennai's Grand old banyan tree news india". India TV. 25 October 2013. Archived from the original on 20 June 2024. Retrieved 26 October 2013.
  32. ↑ "Koyambedu Airport Direct metro stops". Times of India. 18 April 2017. Retrieved 19 April 2017.
  33. ↑ "Finally Link Road at Koyambedu metro station is getting a fresh coat of tar". The Hindu. 21 December 2019. Retrieved 22 December 2019.
  34. ↑ "LIC and Thousand lights metro stations to get 2 more entrances each by may end". Times of India. 16 April 2019. Retrieved 17 April 2019.
  35. ↑ "Work on LIC and thousand lights metro stations still on". The Hindu. 21 January 2019. Retrieved 22 January 2019.
  36. ↑ "Commuters want buses to little mount metro station". Times of India. 14 October 2016. Retrieved 15 October 2016.
  37. ↑ "Metro's AC Feeder service from Little Mount to Tidel Park". Daily Thanti. 25 August 2019. Archived from the original on 7 December 2020. Retrieved 26 August 2019.
  38. ↑ "In Chennai's north 3 underground metro stations almost ready". Times of India. 11 April 2018. Retrieved 12 April 2018.
  39. ↑ "Monthly Parking rates double at select metro stations". The Hindu. 6 June 2019. Retrieved 7 June 2019.
  40. ↑ "Man Found Dead on Chennai Metro track at Meenambakkam metro station". Deccan Chronicle. 24 June 2018. Retrieved 25 June 2018.
  41. ↑ "Two Tier parking facility opened at meenambakkam metro station". Times of India. 2 January 2020. Retrieved 3 January 2020.
  42. ↑ "CMRL, Chennai Runners to join Marathon". The New Indian Express. 30 November 2019. Retrieved 1 December 2019.
  43. ↑ "Metro paints station red brands sit up". Times of India. 26 January 2020. Retrieved 27 January 2020.
  44. ↑ "Nanganallur commuters seek feeder buses at metro station". The Hindu. 18 November 2016. Retrieved 19 November 2016.
  45. ↑ "Single access point at nanganallur metro leaves commuters hassled". Times of India. 9 September 2017. Retrieved 10 September 2017.
  46. ↑ "Metro Tests Central nehru Park to open route in four months". Times of India. 27 January 2018. Retrieved 28 January 2018.
  47. ↑ "Arumbakkam nehru park stations get cab feeder services". The New Indian Express. 28 September 2019. Retrieved 29 September 2019.
  48. ↑ "Falling Tiles panels pose a Threat at metro stations". The Hindu. 1 October 2018. Retrieved 2 October 2018.
  49. ↑ "Air Conditioning to resume at select underground metro stations". The Hindu. 28 July 2019. Retrieved 29 July 2019.
  50. ↑ "Three stations of Chennai Metro renamed after Annadurai MGR and Jayalalithaa". The Times of India. 31 July 2020. Retrieved 1 August 2020.
  51. ↑ "Road Caves in Near Central due to Metro work trailer, truck falls in". Daily Thanthi. 27 October 2020. Retrieved 28 October 2020.
  52. ↑ "3 Chennai Metro Rail stations renamed after Annadurai, MGR and Jayalalithaa". Hindustan Times. 31 July 2020. Retrieved 1 August 2020.
  53. ↑ "Student Ends life by jumping from CMBT Metro station". The Hindu. 8 June 2019. Retrieved 9 June 2019.
  54. ↑ "Two more metro lines and 4 stations open in Chennai on Friday". The News Minute. 24 May 2018. Retrieved 25 May 2018.
  55. ↑ "Chennai Metro brings initiative to save water". Deccan Chronicle. 31 May 2018. Retrieved 1 June 2018.
  56. ↑ "Feeder cab services to be launched at Shenoy Nagar and Nanganallur Road metro stations". Times of India. 24 September 2019. Retrieved 25 September 2019.
  57. ↑ "A makeover for shenoy nagar metro station". The New Indian Express. 20 June 2018. Retrieved 21 June 2018.
  58. ↑ "Parts of Chennai Metro services suspended after staff strike". The News Minute. 30 April 2019. Retrieved 1 May 2019.
  59. ↑ "About 5,000 passengers use Chennai Metro Rail services on Day 1". The Hindu. 9 September 2020. Retrieved 10 September 2020.
  60. ↑ "Chennai Metro Rail's station walls now wear new colours. Here's why". The Hindu. 7 December 2019. Retrieved 8 December 2019.
  61. ↑ "A bumpy ride near Teynampet Metro". The Hindu. 11 January 2020. Retrieved 12 January 2020.
  62. ↑ "Soon, a multi-level car parking at Thirumangalam Metro Rail station". The Hindu. 8 February 2020. Retrieved 9 February 2020.
  63. ↑ "Easier access to loos in Metro Phase-2". The New Indian Express. 19 October 2020. Retrieved 20 October 2020.
  64. ↑ "Two-way traffic between Thousand Lights and LIC could take a few more weeks to be restored". The Hindu. 30 August 2019. Retrieved 31 August 2019.
  65. ↑ "Chennai: Accessing Thousand Lights, LIC metro tough". Times of India. 21 March 2020. Retrieved 22 March 2020.
  66. ↑ "CMRL plans multi-level car park at Vadapalani station". The Hindu. 20 May 2019. Retrieved 21 May 2019.
  67. ↑ "Chennai Metro: Why do ticket counters close at 10 pm?". Deccan Chronicle. 16 September 2017. Retrieved 17 September 2017.
  68. ↑ "Chennai: Metro rail's depot at Wimco Nagar to be ready by December". Times of India. 15 August 2020. Retrieved 16 August 2020.
  69. ↑ "Washermenpet-Wimco Nagar Metro track work completed". The Hindu. 3 November 2020. Retrieved 4 November 2020.