Hebbala metro station

Hebbala
General information
LocationVayunandana Layout, Hebbal Kempapura, Bengaluru, Karnataka 560024
Coordinates13°02′39″N 77°35′34″E / 13.044287°N 77.592666°E / 13.044287; 77.592666
System
Namma Metro station
OwnerBangalore Metro Rail Corporation Ltd (BMRCL)
OperatorNamma Metro
LinesBlue Line - Under Construction
Orange Line - Approved
Red Line - Proposed
PlatformsSide platform (TBC)
Platform-1 → Train Terminates Here *
Platform-2 → KIAL Terminals

Platform-3 → Kempapura
Platform-4 → JP Nagar 4th Phase
Platform-5 → Train Terminates Here
Platform-6 → Sarjapura
Platform Numbers (TBC)
* (Further extension to Krishnarajapura / Central Silk Board in the future)

Tracks06 (TBC)
Connections•Bus interchange Hebbala BMTC Terminus
•Mainline rail interchangeHebbala Suburban Station
Construction
Structure type
Elevated, Double track
Platform levels
(TBC)
Parking(TBC)
Cycle facilities
(TBC)
Accessible(TBC)
Architect  Nagarjuna Constructions Company Ltd. (NCC Ltd).
Other information
Status  Under Construction
  Approved
  Proposed
Station code(TBC)
History
Opening  March 2028 (March 2028) (TBC)
  2031 (2031) (TBC)
  2033 (2033) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Terminus Blue Line
(Operational around March 2028)
Kodigehalli
Kempapura
Future Service
Patelappa Layout Orange Line
(Approved)
Kempapura
Terminus
Terminus Red Line
(Proposed)
Veterinary College
towards Sarjapura
Location

Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station (under Blue Line) is slated to become operational around June 2027.[2][3][4][5][6] This metro station will have 6 platforms totally, for being an interchange of 3 lines - Blue Line, Orange Line and Red Line.

History

Blue Line

On November 17, 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Hebbala metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14, 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.[8]

Station layout

Blue Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
* Further Extension to Krishnarajapura in the future
P#
P#
Train Terminates Here *
to Kempapura ** Orange Line
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here **
Next Station: Kempapura
Change at the next station for Orange Line
Platform #
Northbound
Towards ← KIAL Terminals
Next Station: Kodigehalli
Side platform | Doors will open on the left Disabled access
L2 Note: ** To be further extended to Krishnarajapura / Central Silk Board in the future

Orange Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
P2 to Nagashetty Halli **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Kempapura
Change at the next station for Blue Line
Platform #
Westbound
Towards ← JP Nagar 4th Phase
Next Station: Nagashetty Halli
Side platform | Doors will open on the left Disabled access
L2

Red Line Station Layout - To Be Confirmed

Hebbala track layout (TBC)
to Train Terminates Here
P#
P#
to Ganganagar **
Station with two tracks and two side platforms
** Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Train Terminates Here
Platform #
Southbound
Towards ← Sarjapura
Next Station: Ganga Nagar
Side platform | Doors will open on the left Disabled access
L2

See also

References

  1. ↑ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ↑ "₹500 crore for suburban rail, 41 km of metro line to be operational in 2026-27, says Chief Minister". The Hindu. 6 March 2026. ISSN 0971-751X. Retrieved 14 April 2026.
  3. ↑ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  4. ↑ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  5. ↑ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  6. ↑ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  7. ↑ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  8. ↑ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.