Gerrard–Carlaw GO Station
| General information | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Gerrard Street and Carlaw Avenue Toronto, Ontario | ||||||||||||||
| Coordinates | 43°40′4.8″N 79°20′31.2″W / 43.668000°N 79.342000°W | ||||||||||||||
| Owner | Metrolinx | ||||||||||||||
| Platforms | Side platforms[1] | ||||||||||||||
| Tracks | 2[2] | ||||||||||||||
| Connections | |||||||||||||||
| Construction | |||||||||||||||
| Parking | No[1] | ||||||||||||||
| Accessible | Yes | ||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
Gerrard–Carlaw GO Station (also known as Gerrard GO Station[3][4]) was a planned GO Transit train station to be built by Metrolinx over Gerrard Street and Carlaw Avenue in Toronto.[1] It was initially proposed as part of SmartTrack but was removed from the plan in January 2021.
History
The station was originally proposed in 2014 as part of Mayor John Tory's SmartTrack plan.[5]
On September 22, 2015, Metrolinx proposed it as the location of a new GO station alongside the other proposed SmartTrack stations.[6]
On June 21, 2016, the city of Toronto and the province of Ontario jointly announced that they were both moving forward with plans to construct Gerrard–Carlaw GO Station, along with five other proposed SmartTrack stations.[7] It was then confirmed to be part of the Regional Express Rail (RER) expansion program on June 28, 2016.[8] The station would also be included in Metrolinx's Stouffville line GO expansion project, which broke ground in the same year, then slated for completion in 2025.[9] On February 27, 2018, Metrolinx CEO Phil Verster announced that the station, along with 11 others, were being recommended for a full business case for the RER expansion program by the end of the year. A preliminary business case had determined that the 12 stations would generate a combined total of $6.71 billion in benefits over 60 years.[10][11] However, by January 2021, the station was officially dropped from the SmartTrack program, in the wake of the announcement of the Ontario Line on April 10, 2019. The Ontario Line's Gerrard station was proposed to be located at the location of Gerrard–Carlaw GO Station, rendering it redundant.[12][13][14]
References
- 1 2 3 "Technical Report: GO Expansion RER New Stations Business Case Analysis" (PDF). metrolinx.com. Metrolinx. February 2018. pp. 47–50. Archived from the original (PDF) on October 4, 2022. Retrieved April 29, 2020.
- ↑ Munro, Steve (March 23, 2018). "New SmartTrack/GO Station Designs (III)". stevemunro.ca. Retrieved August 22, 2026.
- ↑ Spurr, Ben (June 2, 2016). "Version of SmartTrack taking shape with seven new stations". Toronto Star. Torstar. Retrieved April 29, 2020.
- ↑ Auditor General of Ontario (December 5, 2018). "Chapter 3|Section 3.06|Metrolinx—GO Station Selection" (PDF). auditor.on.ca. Retrieved April 29, 2020.
- ↑ Adler, Mike (October 24, 2014). "TORONTO VOTES: SmartTrack could put new life into Ellesmere RT station while subway would kill it". Toronto.com. Torstar. Metroland Media. Retrieved April 29, 2020.
- ↑ Woo, Leslie (September 22, 2015). "NEW STATION ANALYSIS Methodology and Process" (PDF). metrolinx.com. Metrolinx. p. 12. Archived from the original (PDF) on March 13, 2020. Retrieved April 29, 2020.
- ↑ Spurr, Ben (June 21, 2016). "John Tory's SmartTrack going ahead with six new stops". Toronto Star. Retrieved June 25, 2016.
- ↑ "GO Regional Express Rail 10-Year Program: New Stations Analysis" (PDF). metrolinx.com. Metrolinx. June 28, 2016. Archived from the original (PDF) on March 13, 2020. Retrieved April 29, 2020.
- ↑ "Stouffville GO Expansion, Ontario". Railway Technology. GlobalData. March 29, 2019. Retrieved August 22, 2026.
- ↑ "Making the case for more GO stations" (Press release). Metrolinx. February 27, 2018. Retrieved August 22, 2026.
- ↑ Mackenzie, Robert (February 27, 2018). "Metrolinx Advancing New GO and SmartTrack Stations". UrbanToronto. Retrieved August 22, 2026.
- ↑ O'Neil, Lauren (January 21, 2021). "Toronto expected to add 5 new transit stations by 2026". blogTO. ZoomerMedia. Retrieved August 22, 2026.
- ↑ Mackenzie, Robert (February 4, 2021). "Toronto and Ontario Advance SmartTrack Station Plan". UrbanToronto. Retrieved August 22, 2026.
- ↑ Spurr, Ben (January 20, 2021). "Mayor John Tory's SmartTrack plan loses another two stations". Toronto Star. Torstar. Retrieved January 21, 2021.