Draft:GNV Virgo
![]() | Review waiting, please be patient.
This may take 2–3 weeks or more, since drafts are reviewed in no specific order. There are 717 pending submissions waiting for review.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
![]() GNV Virgo in Barcelona | |
| History | |
|---|---|
| Name | 2025–present: GNV Virgo |
| Owner | 2025–present: Grandi Navi Veloci (GNV) (MSC Group) |
| Operator | 2025–present: Grandi Navi Veloci (GNV) |
| Port of registry |
|
| Route | |
| Ordered | 2022 |
| Builder | |
| Yard number | 21110003 |
| Laid down | 2024 |
| Launched | 2024 |
| Completed | 2025 |
| Acquired | 2025 |
| Maiden voyage | 2025 |
| In service | 2025 |
| Identification |
|
| Status | in service |
| General characteristics | |
| Class & type | GNV Newbuild LNG Class / GSI Ro-Pax |
| Tonnage |
|
| Length | 218.00 m (715 ft 3 in) |
| Beam | 29.60 m (97 ft 1 in) |
| Draught | 6.70 m (22 ft 0 in) |
| Depth | 10.00 m (32 ft 10 in) |
| Decks | 11 |
| Ramps | Bow and stern loading ramps |
| Installed power |
|
| Propulsion | 2 × controllable pitch propellers |
| Speed | 25.0 knots (46.3 km/h; 28.8 mph) (service) |
| Capacity |
|
| Crew | 50–60 |
GNV Virgo is a 218.00-metre LNG dual-fuel Ro-Pax cruise ferry owned and operated by Grandi Navi Veloci (GNV). Built in 2025 by Guangzhou Shipyard International in China, she is the third in a four-ship newbuilding series designed to modernize GNV's Mediterranean fleet. Equipped with cold-ironing shore power connection and LNG propulsion, she operates routes connecting mainland Italy with Sicily and Sardinia.
Service
The ferry, the third of a series of four sister units, of which it is the first to be fueled by LNG, was launched in December 2024 at the COMEC shipyards in Canton with the name of GNV Virgo, in conjunction with the laying of the keel of the twin GNV Aurora.[1][2] On 29 August 2025, 11 months ahead of schedule, it completed its sea trials[3][4]and, after having hoisted the Italian flag, on 22 October it was officially delivered to Grandi Navi Veloci.[2][5] Three days later it then set sail from China for Italy, where its christening was scheduled in Palermo on 11 December.[6] On 27 November, after just over a month of navigation, which saw the ferry circumnavigate the Cape of Good Hope, it finally arrived in Genoa.[7][8][9] On 11 December, as expected, it was christened in Palermo by Giuseppe Fiorello[10] and three days later it finally entered service on the connections between Liguria and Sicily, alongside its twin GNV Orion,[11] operating occasionally in the following months on the connections to Naples. On 15 April, four months after entering service, it was announced that the ferry will operate from 1 July on the connections between Genoa, Barcelona and Tangier Med, where it will operate alongside its twin GNV Aurora.[12][13][14][15]
Sister ships
- GNV Polaris
- GNV Orion
- GNV Aurora
References
- ↑ "PROSEGUE LA COSTRUZIONE DEI PRIMI TRAGHETTI DI GNV ALIMENTATI A GNL: VARO TECNICO PER GNV VIRGO E POSA DELLA CHIGLIA DI GNV AURORA". www.gnv.it (in Italian). Retrieved 2026-08-05.
- 1 2 "GNV Virgo: consegnato il primo traghetto GNL di lunga percorrenza della flotta GNV". www.gnv.it (in Italian). Retrieved 2026-08-05.
- ↑ "CONCLUSE LE PROVE IN MARE PER GNV VIRGO". www.gnv.it (in Italian). Retrieved 2026-08-05.
- ↑ "GNV Virgo completa con successo le prove in mare | Ship2Shore". www.ship2shore.it (in Italian). Retrieved 2026-08-05.
- ↑ Simone (2025-10-23). "Grandi Navi Veloci prende in consegna la nuova GNV Virgo". Pianeta Navi (in Italian). Retrieved 2026-08-05.
- ↑ ITALY, REDAZIONE SHIPPING (2025-09-29). "A giorni la consegna di Gnv Virgo che sarà battezzata nel porto di Palermo". Shipping Italy (in Italian). Retrieved 2026-08-05.
- ↑ ITALY, REDAZIONE SHIPPING (2025-11-27). "Arrivata a Genova la nuova Gnv Virgo, il 4 dicembre il primo bunkeraggio di Gnl". Shipping Italy (in Italian). Retrieved 2026-08-05.
- ↑ "Gnv Virgo a Genova: è il primo traghetto alimentato a GNL della flotta". mentelocale.it (in Italian). 2025-11-27. Retrieved 2026-08-05.
- ↑ "In porto arriva Virgo, il primo traghetto di Gnv alimentato a GNL". Genova24.it (in Italian). 2025-11-27. Retrieved 2026-08-05.
- ↑ ANSA, Agenzia (2025-12-12). "A Palermo cerimonia di battesimo per Gnv Virgo, prima nave alimentata a gas naturale - Notizie - Ansa.it". Agenzia ANSA (in Italian). Retrieved 2026-08-05.
- ↑ "M/F GNV Virgo — The Ferry Site". www.ferry-site.dk. Retrieved 2026-08-05.
- ↑ Redazione (2026-04-15). "Gnv rafforza il network di rotte tra Italia e Marocco con le due nuove navi a Gnl". Shipmag (in Italian). Retrieved 2026-08-05.
- ↑ "Home". Informazioni Marittime (in Italian). Retrieved 2026-08-05.
- ↑ "Gnv consolida le rotte sul Marocco con Aurora e Virgo". TravelQuotidiano. 2026-04-15. Retrieved 2026-08-05.
- ↑ ITALY, REDAZIONE SHIPPING (2026-04-15). "I nuovi traghetti Gnv Aurora e Virgo dalla prossima estate impegnati sulla Genova-Barcellona-Tangeri". Shipping Italy (in Italian). Retrieved 2026-08-05.
Category:Ferries of Italy Category:2025 ships Category:Ships built in China
- Pending AfC submissions
- AfC pending submissions without an age
- AfC submissions with the same name as existing mainspace pages
- Undated AfC submissions

