Frost Tower (San Antonio)
| Frost Tower (San Antonio) | |
|---|---|
![]() | |
Interactive map of the Frost Tower (San Antonio) area | |
General information | |
| Status | Completed |
| Type | Office |
| Location | 111 West Houston Street San Antonio, Texas |
| Coordinates | 29°25′37″N 98°29′49″W / 29.4269°N 98.4970°W |
Construction started | March 7, 2017[1] |
Completed | 2019[2] |
| Height | |
| Roof | 400 ft (120 m)[1] |
| Technical details | |
| Floor count | 23[1] |
| Design and construction | |
| Architects | Pelli Clarke Pelli Architects, Alamo Architects, Kendall/Heaton Associates Inc.[1] |
| Main contractor | Clark Construction[3] |
The Frost Tower is a 23-story skyscraper in San Antonio, Texas, USA. It was opened in 2019 at a cost of $142 million and is the first new office tower built in downtown San Antonio since 1989 when Weston Centre was built.[4][5] Frost Tower replaced the old Frost Bank Tower as the headquarters of the eponymously named Frost Bank when it opened in 2019.[6]
In April 2024, the Institute of Texan Cultures (ITC) stated that they would move into Frost Tower in 2025 due to its original building being demolished.[7] Following its one and a half-year modernization works, the new ITC facility was officially opened on the tower's first floor on January 29, 2026.[8][9] It has a total floor area of 8,000 sq ft (740 m2) and contains two exhibition galleries.[9]
Reception
The building won the 2019 Best Office/Retail/Mixed-Use Project by Engineering News-Record (ENR Texas & Louisiana)[10] and has been compared to Queen Elsa's ice palace, a drill bit, and a can opener.[11]
See also
References
- 1 2 3 4 "Frost Tower, San Antonio | 1232095". Emporis. Archived from the original on May 28, 2019. Retrieved May 3, 2022.
- ↑ "Frost Tower heralds an exciting revitalization in San Antonio". Pelli Clarke & Partners. Archived from the original on August 16, 2026. Retrieved August 16, 2026.
- ↑ "Frost Tower". Arrowall Co. 2017. Retrieved August 6, 2018.
- ↑ Webner, Richard (March 15, 2017). "Developers allowed to break ground on towers in downtown, the Pearl". MySA. Hearst.
- ↑ Petty, Kathleen (December 2018). "Frost Tower: A Modern Addition". San Antonio Magazine.
- ↑ Biediger, Shari (June 21, 2019). "Frost Tower Move-In Days Have Arrived for Bank Employees". San Antonio Report. Retrieved February 20, 2025.
- ↑ Morgan, Jack (April 4, 2024). "Take pictures soon: Institute of Texan Cultures will be torn down in 2025".
- ↑ Lambert, Madalynn (January 28, 2026). "UT San Antonio reopens Institute of Texan Cultures at Frost Tower". KSAT 12. Archived from the original on August 15, 2026. Retrieved August 15, 2026.
- 1 2 Felgueres, Natalia Vázquez (February 3, 2026). Cruz, Marisela (ed.). "Institute of Texan Cultures reopens in Frost Tower". The Paisano. Archived from the original on August 15, 2026. Retrieved August 15, 2026.
- ↑ "Best Office/Retail/Mixed-Use: Frost Tower". ENR Texas & Louisiana. October 15, 2019.
- ↑ Marini, Richard A. (February 5, 2019). "S.A.'s new Frost Bank Tower gets likened to drill bit, Bart Simpson".
External links
Media related to Frost Tower (San Antonio) at Wikimedia Commons
