East–West line (Jakarta MRT)

East–West Line
Overview
Native nameLin Timur–Barat
Status
  • Under construction (Phase 1 Stage 1)[1]
  • Planned (Phase 1 Stage 2 & Phase 2)
OwnerMinistry of Transportation, DKI Jakarta Provincial Government, West Java Provincial Government, and Banten Provincial Government
LocaleGreater Jakarta, Indonesia
Termini
  • Balaraja (planned)
  • Cikarang (planned)
Stations48 (planned total)
21 (Phase 1 Stage 1)[2]
Service
TypeRapid transit
SystemJakarta MRT
Services1
OperatorPT MRT Jakarta (Perseroda)
DepotRorotan Depot (Phase 1)[3]
Rolling stock8-car electric multiple units
Daily ridership284,900 (projected for Phase 1 Stage 1)
History
Work began11 September 2024 (2024-09-11)[2]
Planned opening
  • 2031 (Phase 1 Stage 1)[3]
Technical
Line length84.1 km (52.3 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC
Operating speed100 km/h (62 mph)
Route map

planned line to Balaraja
Tomang
Grogol
Roxy
Petojo
Cideng
Thamrin
Kebon Sirih
Kwitang
Senen
Galur
Cempaka Baru
Sumur Batu
West Pakulonan
East Pakulonan
Perintis
Pulogadung
Penggilingan
Cakung Barat
Pulo Gebang
Ujung Menteng
Rorotan Depot
Medan Satria
planned line to Cikarang

The East–West Line (Indonesian: Lin Timur–Barat), also known as the MRT Phase 3 project, is a planned rapid transit line of the Jakarta MRT in Greater Jakarta, Indonesia, currently under construction.[4] Spanning approximately 84.1 km (52.3 mi) across three provinces (Banten, Jakarta, and West Java), the full corridor will connect Balaraja in Tangerang Regency in the west to Cikarang in Bekasi Regency in the east.[5]

Construction on Phase 1 Stage 1, covering 24.5 km (15.2 mi) between Tomang in West Jakarta and Medan Satria in Bekasi, officially broke ground on 11 September 2024 at Thamrin MRT station, officiated by President Joko Widodo.[2][1] Commercial operations for Phase 1 Stage 1 are targeted to begin by 2031.[2]

History

Background and planning

Plans for an east–west rapid transit corridor traversing Greater Jakarta were first examined in the 1990s as part of regional transit master plans.

The East–West MRT corridor was developed from earlier Jabodetabek railway planning that considered several possible alignments between Balaraja in Banten and Cikarang in West Java.[6] In December 2011, the Japan International Cooperation Agency (JICA), Bappenas, the Directorate General of Railways, the Jakarta provincial government and PT MRT Jakarta agreed to undertake a preparatory survey for the East–West MRT project. The subsequent study examined a proposed Balaraja–Cikarang corridor of approximately 87.3 km.[7] In 2013, JICA completed the preparatory survey, which evaluated alternative routes, preliminary designs, construction costs, integration with existing railway networks and implementation arrangements for the proposed East–West line.[8]

In April 2014, the Jakarta provincial government publicly discussed extending the MRT eastward to Cikarang and westward to Balaraja. Vice Governor Basuki Tjahaja Purnama stated that existing corridors could be used in order to reduce the need for land acquisition.[9] In October 2014, The Jakarta Post reported that the Asian Development Bank (ADB) had offered technical assistance for the proposed East–West MRT route, while the feasibility study was still being conducted.[10]

In December 2015, Japan and Indonesia signed a Japanese Official Development Assistance (ODA) loan agreement worth ¥1.919 billion for engineering services for Phase I of the East–West MRT project.[11] The East–West MRT engineering-services project was also included in Indonesia's 2015–2019 medium-term external-loan programme, with the planned work including route and network planning for the Kembangan–Ujung Menteng section and integration with existing and planned public transport networks.[12] During 2016, the project remained in the engineering and preparation stage following the ODA loan agreement, rather than entering full construction.[13]

In March 2017, the Indonesian government announced plans to accelerate development of the East–West MRT project between Cikarang and Balaraja.[14] In July, Coordinating Minister for Maritime Affairs Luhut Binsar Pandjaitan asked PT MRT Jakarta to focus on the Cikarang–Balaraja corridor, particularly the approximately 27 km section within Jakarta between Kembangan and Ujung Menteng.[15] In August 2017, PT MRT Jakarta was still awaiting a decision from the Ministry of Transportation concerning the proposed Cikarang–Balaraja East–West route.[16]

In 2018, the Jakarta provincial government stated that the planned East–West MRT corridor would connect Cikarang in Bekasi with Balaraja in Banten, covering approximately 87 km, with construction planned to begin in 2020.[17]

In March 2019, President Joko Widodo instructed Jakarta Governor Anies Baswedan to proceed with development of the East–West MRT corridor as Phase III of the Jakarta MRT network.[18] By July, the initial Jakarta section had been prioritized between Kalideres in West Jakarta and Ujung Menteng in East Jakarta. The proposed section was 31.7 km long and was planned to have 22 stations, divided into the Kalideres–Cempaka Baru section of 20.1 km and the Cempaka Baru–Ujung Menteng section of 11.6 km.[19] PT MRT Jakarta described the Kalideres–Ujung Menteng section as the inner-Jakarta portion of the larger 87 km Cikarang–Balaraja East–West corridor.[20] The proposed section was planned to use a combination of elevated and underground infrastructure, including elevated track between Kalideres and Grogol, underground track from Roxy to Cempaka Baru, and elevated track from Sumur Batu to Ujung Menteng.[21] By the end of July 2019, Kalideres–Ujung Menteng had become the priority section of the wider East–West MRT corridor, with the larger project continuing to be planned toward Balaraja and Cikarang.[22]

Following the operational success of the North–South line's first phase, feasibility studies for the East–West corridor were updated by the Indonesian Ministry of Transportation and the Provincial Government of DKI Jakarta in cooperation with foreign aid agencies.[23] Originally, the construction was planned to began on Q2 2020,[24] but was delayed to 2024 due to the COVID-19 pandemic.[25]

In May 2024, the government of Japan signed an ODA soft loan agreement through JICA worth ¥140.7 billion (US$892 million) to finance Phase 1 Stage 1, alongside co-financing from the ADB.[3][1]

Construction phase

The construction of the East–West Line is divided into distinct regional segments:[23]

  • Phase 1 (DKI Jakarta area):
    • Stage 1: Tomang to Medan Satria (24.5 km; 21 stations, including 8 underground and 13 elevated). Construction commenced on 11 September 2024.[1]
    • Stage 2: Kembangan to Tomang (9.2 km).
  • Phase 2 (Outer Jakarta / Agglomeration area):
    • Phase 2 West: Balaraja to Kembangan (29.9 km).
    • Phase 2 East: Medan Satria to Cikarang (20.4 km).

Construction and systems

Civil infrastructure

The alignment utilizes underground bored tunnels in central urban segments (from Petojo to Cempaka Baru) to minimize surface displacement, while switching to elevated viaduct structures along arterial road corridors in outer sections.[1] Maintenance and stabling will be handled at a dedicated depot located in Rorotan, North Jakarta, connected via a 5.9-km spur line extending north from Ujung Menteng station.[3]

Systems and rolling stock

  • Track Gauge: 1,067 mm (3 ft 6 in) narrow gauge.
  • Electrification: 1,500 V DC overhead catenary system (OCS).
  • Signalling: Communications-based train control (CBTC) enabling Grade of Automation 2 (GoA2) semi-automated train operation.[23]
  • Rolling Stock: 8-car electric multiple unit (EMU) trainsets with maximum operating speeds of up to 100 km/h (62 mph).

Consultants

A consortium of international and domestic engineering and consulting firms was selected by the Ministry of Transportation's Directorate General of Railways to perform the basic design, tender preparation, and project management consultancy (PMC):[23][26]

  • Nippon Koei Co., Ltd. (Lead consultant)
  • Oriental Consultants Global Co., Ltd.
  • SYSTRA
  • PT Matra Rekayasa Internasional
  • PT Jaya CM
  • PT Perentjana Djaja
  • PT Dardela Yasa Guna

Route

The line runs between Balaraja in Banten and Cikarang in West Java across the Greater Jakarta metropolitan area, spanning approximately 84.1 km (52.3 mi). Traversing three provinces—Banten, DKI Jakarta, and West Java—the planned and under-construction rapid transit line will serve as the main east–west transit spine of the Jakarta MRT, consisting of 48 stations with both underground and elevated sections and intersecting with the North–South Line at Thamrin.

Project stages

Due to its length and funding requirements, development of the East–West Line is divided into two major phases, which are further split into four distinct construction stages:

Phase 1 Stage 1 (Tomang – Medan Satria)

  • Length: 24.5 km (15.2 mi) (plus a 5.9 km (3.7 mi) spur line to the depot)
  • Alignment: The line runs between Tomang in West Jakarta and Medan Satria in Bekasi, featuring 21 stations (8 underground and 13 elevated).
  • Facilities: Includes an elevated maintenance depot located in Rorotan, North Jakarta.
  • Funding: Co-financed via official development assistance (ODA) loans from JICA and ADB.

Phase 1 Stage 2 (Kembangan – Tomang)

  • Length: 9.2 km (5.7 mi)
  • Alignment: The line runs between Kembangan and Tomang within West Jakarta, bridging the central Jakarta core with the western city limits.

Phase 2 West (Balaraja – Kembangan)

  • Length: 29.9 km (18.6 mi)
  • Alignment: The line runs between Balaraja in Tangerang Regency and Kembangan in West Jakarta, terminating at Balaraja where a secondary depot is planned.

Phase 2 East (Medan Satria – Cikarang)

Alignment overview

The central portion of the line running through Central Jakarta between Roxy and Cempaka Baru is constructed underground to avoid heavy surface traffic and existing structures. The remaining eastern and western segments transition to elevated viaducts above arterial roads and toll corridors.

List of stations

Region Number Station Name Transfers / Notes Elevation
Phase 2 West (planned, Balaraja–Kembangan)
Tangerang Regency, Banten — Balaraja Connection to Balaraja Depot Elevated
— Cibadak
— Pasir Gadung
— Otonom
— Bunder
— Kadu
— Bencongan
— Danau Ranau
Tangerang, Banten — Kelapa Dua
— Kebon Nanas
— Panunggangan
— Kunciran
— Hasyim Asy'ari
— Karang Tengah
Phase 1 Stage 2 (planned, Kembangan–Tomang)
West Jakarta, DKI Jakarta — Kembangan Phase 2 West extension terminus Elevated
— Batu Mulia
— Teknologi
— Kebon Jeruk
— Tanjung Duren
— Arjuna Selatan
Phase 1 Stage 1 (under construction, operational target by 2031)
West Jakarta, DKI Jakarta TB01 Tomang Phase 1 Stage 2 extension terminus Elevated
TB02 Grogol List of Transjakarta corridors#Corridor 3 List of TransJakarta corridors#Corridor 8 List of TransJakarta corridors#Corridor 9 Grogol
TB03 Roxy Underground
Central Jakarta, DKI Jakarta TB04 Petojo List of TransJakarta corridors#Corridor 8 Petojo
TB05 Cideng
TB06 Thamrin Planned interchange to North–South Line
List of Transjakarta corridors#Corridor 1 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Kebon Sirih
TB07 Kebon Sirih
TB08 Kwitang List of Transjakarta corridors#Corridor 2 Kwitang
TB09 Senen Kereta Api Indonesia Pasar Senen
List of Transjakarta corridors#Corridor 2 List of Transjakarta corridors#Corridor 5 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 14 Senen Toyota Rangga
TB10 Galur List of Transjakarta corridors#Corridor 2 Galur
TB11 Cempaka Baru
East Jakarta, DKI Jakarta TB12 Sumur Batu Elevated
TB13 Pakulonan Barat
TB14 Pakulonan Timur
TB15 Perintis List of Transjakarta corridors#Corridor 2 List of TransJakarta corridors#Corridor 10 Pedongkelan
TB16 Pulogadung List of Transjakarta corridors#Corridor 2 List of Transjakarta corridors#Corridor 4 Pulo Gadung
TB17 Penggilingan List of TransJakarta corridors#Corridor 11 Penggilingan
TB18 Cakung Barat
TB19 Pulo Gebang Bus Terminal Pulo Gebang Bus Terminal
List of TransJakarta corridors#Corridor 11 Pulo Gebang
TB20 Ujung Menteng Connection to Rorotan Depot
Bekasi, West Java TB21 Medan Satria Phase 2 East extension terminus
Phase 2 East (planned, Medan Satria–Cikarang)
Bekasi, West Java — Kaliabang Elevated
— Harapan Baru
— Karang Satria
Bekasi Regency, West Java — Sumber Jaya
— Wanajaya
— Cibitung
— Cikarang Cikarang

See also

References

  1. 1 2 3 4 5 Tempo (11 September 2024). "Jokowi Launches MRT Construction of Tomang-Medansatria Line". Tempo.co. Retrieved 6 August 2026.
  2. 1 2 3 4 "President Jokowi Launches New MRT Line to Ease Jakarta's Traffic Woes". Business Indonesia. 11 September 2024. Retrieved 6 August 2026.
  3. 1 2 3 4 "Roads, Bridges and Tunnels Asia 2026 Signals Southeast Asia's Infrastructure Boom". Highways Today. 22 July 2026. Retrieved 6 August 2026.
  4. ↑ "Indonesia breaks ground on new subway". The Investor Vietnam. 13 September 2024. Retrieved 6 August 2026.
  5. ↑ Hannany, Zetta; Priambodo, Dhika (11 July 2025). "Government prepares IDR 50 trillion for new Jakarta MRT line". IDN Financials. Retrieved 6 August 2026.
  6. ↑ Directorate General of Land Transportation (PDF) (Report). Japan International Cooperation Agency. 2012.
  7. ↑ Preparatory Survey for Jakarta Mass Rapid Transit East-West Line Project: Final Report (PDF) (Report). Japan International Cooperation Agency. 2013.
  8. ↑ Preparatory Survey for Jakarta Mass Rapid Transit East-West Line Project: Final Report (PDF) (Report). Japan International Cooperation Agency. 2013.
  9. ↑ "MRT Cikarang-Balaraja Akan Lewati Perumahan". Okezone. 24 April 2014.
  10. ↑ "ADB offers technical assistance for MRT". The Jakarta Post. 9 October 2014.
  11. ↑ Ex-Ante Evaluation: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West Line Project (Phase I) (PDF) (Report). Japan International Cooperation Agency. 2015.
  12. ↑ List of Medium-Term Planned External Loans (DRPLN-JM) 2015–2019, Book 2 (PDF) (Report). Government of Indonesia. 2015.
  13. ↑ "ODA Loan Project DATA". Japan International Cooperation Agency.
  14. ↑ "Pemerintah kebut pembangunan MRT". ANTARA News. 2 March 2017.
  15. ↑ "Luhut Minta MRT Jakarta Fokus Garap Rute Cikarang-Balaraja". Suara.com. 6 July 2017.
  16. ↑ "MRT tunggu keputusan Kemenhub soal rute "East-West"". ANTARA News. 23 August 2017.
  17. ↑ "Press Release 29-SP-HMS-01-2018". Government of Jakarta. 2018.
  18. ↑ "Fase 2 Sampai Kota, fase 3 Kalideres-Ujung Menteng". Warta Kota. Badan Pemeriksa Keuangan Republik Indonesia. 25 March 2019.
  19. ↑ Al Hikam, Herdi Alif (25 July 2019). "Membentang 31 Km, Ini Daftar Stasiun MRT Kalideres-Ujung Menteng". detikFinance.
  20. ↑ "MRT Rute Kalideres-Ujung Menteng Segera Dibangun". Beritajakarta. 26 July 2019.
  21. ↑ "MRT Rute Kalideres-Ujung Menteng Segera Dibangun". Beritajakarta. 26 July 2019.
  22. ↑ "Jalur Kalideres-Ujung Menteng Jadi Prioritas MRT Fase III". Koran Tempo. Badan Pemeriksa Keuangan Republik Indonesia. 29 July 2019.
  23. 1 2 3 4 "Jakarta MRT East West, Indonesia". SYSTRA Singapore. Retrieved 6 August 2026.
  24. ↑ "MRT Fase III Cikarang - Balaraja akan Mulai Dibangun Kuartal II 2020 - Transportasi Katadata.co.id". katadata.co.id (in Indonesian). 2019-03-24. Retrieved 2026-08-06.
  25. ↑ "East-West MRT construction to be expedited: Minister Hartarto". Antara News. Retrieved 2026-08-06.
  26. ↑ "Indonesia - Asia - SYSTRA". SYSTRA Group. Retrieved 6 August 2026.