Cobblebank railway station
Cobblebank | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Westbound view from Platform 2, December 2019 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| General information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Location | Ferris Road, Cobblebank, Victoria 3338 City of Melton Australia | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Coordinates | 37°42′42″S 144°36′07″E / 37.7117°S 144.6019°E | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| System | PTV regional rail station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Owner | VicTrack | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operator | V/Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Lines | Ballarat Ararat Maryborough (Ararat) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Distance | 34.39 kilometres from Southern Cross | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Platforms | 2 side | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Connections | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | At grade | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Parking | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cycle facilities | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Operational, unstaffed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Station code | TLN | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Fare zone | Myki Zone 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Website | Public Transport Victoria | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opened | 1 December 2019 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Former names | Toolern (provisionally) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Passengers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2019–2020 | 25,450[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2020–2021 | 46,950[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cobblebank railway station is a regional railway station on the Ararat line. It serves the western suburb of the same name, in Melbourne, Victoria, Australia, and was opened on 1 December 2019.[2]
The station was provisionally named Toolern, but was given the name "Cobblebank" during construction.
History
Rail Motor Stopping Place No. 65, which was opened on 1 October 1934, was at the approximate location of the present Cobblebank station.[2] By 4 November 1968, it had been removed from the Victorian Railways working timetable and, on 8 July 1969, it was formally closed to traffic.[2]
In November 2017, the Victorian State Government announced that the station would be constructed, with a scheduled completion date of late 2019.[3][4][5] The station, built as part of the Regional Rail Revival project, was provided to serve future residential developments nearby.[6][7]
On 26 October 2018, the designs for the station were released[8] and, at the same time, it was renamed from Toolern to Cobblebank.[9] Despite that, it still uses the station code for Toolern (TLN).[2]
The station was opened on 1 December 2019,[10] with around 1000 community members attending the celebration.[11][12][13] The station opening coincided with the duplication of 18 km of track between Deer Park West and Melton.[14][2]
Cobblebank was planned to be integrated into the electrified metropolitan railway network, as part of the Western Rail Plan. However, in 2023, the State and Federal governments conducted a review of all national infrastructure projects, with the aim of reducing government spending,[15] and it was concluded that the Western Rail Plan, including electrification to Melton and Wyndham Vale, and Geelong fast rail, would be cancelled.[16]
However, in April 2026, the Victorian Government announced a Melton line upgrade that included aspects of the Western Rail Plan, involving extension of the platform at Coblebank to accommodate 9-car VLocity trains, and a train stabling yard near the station that would be able to house electric trains when they began to run on the line.[17] On 4 May 2026, the Victorian Government announced that, in a dollar-for-dollar funding deal with the Australian Government, development works to support the future electrification of the Melton Line would be begun.[18]
Platforms, facilities and services
Cobblebank has two side platforms. The station has a ticketing office, an office, a waiting room, male, female and accessible toilets, and a pod for Protective Services Officers. There is a Parkiteer bicycle parking cage, an accessible pedestrian overpass with lifts, ramps and stairs, as well as bus and car parking.[19]
The station was constructed with provision for two extra railway tracks,[20] which would be used for express services after the planned electrification of the line.[21]
Cobblebank is served by Ballarat, Ararat and Maryborough line trains.[22]
| Cobblebank platform arrangement | ||||
|---|---|---|---|---|
| Platform | Line | Destination | Service Type | |
| 1 | Ballarat line Ararat line Maryborough line |
Southern Cross | Maryborough line: One daily V/Line service | |
| 2 | Ballarat line Ararat line |
Melton, Bacchus Marsh, Wendouree, Ararat | ||
Transport links
Transit Systems Victoria operates two bus routes to Cobblebank station, under contract to Public Transport Victoria:
- 454 : to Melton station[23]
- 451 : to Thornhill Park[24]
- FlexiRide Melton South[25]
References
- 1 2 Railway station and tram stop patronage in Victoria for 2008-2021 Archived 17 December 2022 at the Wayback Machine Philip Mallis
- 1 2 3 4 5 "Cobblebank". vicsig.net. Archived from the original on 16 May 2023. Retrieved 25 February 2023.
- ↑ New train station announced in Toolern precinct City of Melton 3 November 2017
- ↑ New Train Station for Melbourne's Growing West Archived 21 December 2017 at the Wayback Machine Minister for Public Transport 3 November 2017
- ↑ Another station coming to Melbourne's west Archived 12 January 2018 at the Wayback Machine Rail Express 6 November 2017
- ↑ Minister for Public Transport (1 March 2017). "$518 Million Ballarat Line Upgrade Released To Market". Premier of Victoria website. Archived from the original on 19 April 2017. Retrieved 2 February 2019.
- ↑ "Ballarat Line Upgrade". Rail Projects Victoria. 1 February 2019. Archived from the original on 30 January 2019. Retrieved 2 February 2019.
- ↑ "Images Revealed For A New Station At Cobblebank". Premier of Victoria. 26 October 2018. Archived from the original on 28 October 2018. Retrieved 28 October 2018.
- ↑ Ford, Alex (26 October 2018). "Another Ballarat line station on its way". The Courier. Archived from the original on 27 October 2018. Retrieved 28 October 2018.
- ↑ "Victoria's Newest Station Opens At Cobblebank". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
- ↑ "Celebrating Cobblebank Station opening". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
- ↑ "Cobblebank Station To Open In Early December". Premier of Victoria. 22 October 2019. Archived from the original on 22 October 2019. Retrieved 28 October 2019.
- ↑ "Victoria's Newest Station Opens At Cobblebank". Mirage News. 1 December 2019. Retrieved 1 December 2019.
- ↑ "Cobblebank Station opening community event". Victoria's Big Build. 24 June 2021. Archived from the original on 8 November 2021. Retrieved 7 November 2021.
- ↑ "Infrastructure Investment Program Strategic Review". Australian Government. Retrieved 4 May 2026.
- ↑ Hatch, Patrick (2 August 2023). "Axing train lines to Melbourne's west not a broken promise, government says". The Age. Retrieved 31 January 2024.
- ↑ "Works powering ahead in the west on the Melton Line Upgrade". Victoria's Big Build. 30 April 2026. Retrieved 4 May 2026.
- ↑ "Melton Electrification On The Way". Premier of Victoria. Retrieved 4 May 2026.
- ↑ "Cobblebank Station". Rail Projects Victoria. 29 January 2019. Archived from the original on 2 February 2019. Retrieved 2 February 2019.
- ↑ "New station at Cobblebank". regionalrailrevival.vic.gov.au. Archived from the original on 27 October 2018. Retrieved 28 October 2018.
- ↑ Carey, Adam (24 February 2016). "Long-planned Melton rail line upgrade being pushed for next state budget". The Age. Archived from the original on 2 March 2021. Retrieved 28 October 2018.
- ↑ Ballarat - Melbourne timetable Public Transport Victoria
- ↑ 454 Melton Station to Cobblebank Station Archived 24 March 2022 at the Wayback Machine Public Transport Victoria
- ↑ "451 Thornhill Park - Cobblebank Station". Transport Victoria. Retrieved 13 July 2026.
- ↑ "FlexiRide - Melton South". Public Transport Victoria. Retrieved 3 June 2025.
