Ciclovía La Gran Tenochtitlán

The bikeway near Estadio Azteca

The Ciclovía La Gran Tenochtitlán is a bikeway in central Mexico City. It runs 34 kilometers (21 mi) along Calzada de Tlalpan, a major north–south thoroughfare, starting at Plaza Tlaxcoaque, in the historic center of the city, toward Estadio Azteca area.[1] The bikeway was announced in June 2025 by the head of government of Mexico City, Clara Brugada, ahead the 2026 FIFA World Cup, a football tournament co-hosted by Mexico.

Although incomplete,[2] the bikeway was inaugurated on 19 April 2026.[3] In her remarks at the inauguration event, Brugada highlighted its connection with multiple Mexico City Metro stations. In the section that comprises San Antonio Abad and Chabacano metro stations, the bikeway connects to the Jardín Flotante Tlallipan (alternatively known as Calzada Flotante Tlallipan), a pedestrian bridge that crosses above the tracks of Line 2 of the Mexico City Metro.

The project has drawn criticism due to its design, planification, cost, and zoning, and it was concluded days after the tournament's final match was played.

Overview

The bikeway as seen from the adjacent overpass

The Ciclovía La Gran Tenochtitlán was announced on 3 June 2025 by the head of government of Mexico City, Clara Brugada.[4] It is divided in two sections. From Tlaxcoaque, near Pino Suárez metro station, to Chabacano metro station, it runs along Calzada de Tlalpan with connections to a 1.8-kilometer (1.1 mi) overpass,[5] which serves as a pedestrian park.[6] It is named Jardín Flotante Tlallipan, and was inaugurated incomplete on 7 June 2026.[7]

Metro access to the Jardín Flotante Tlallipan

Its second section, which begins at Chabacano metro station, runs at grade as a side bike lane toward CETRAM Huipulco, near Estadio Azteca.[8] It was inaugurated incomplete on 19 April 2026. In her remarks at the inauguration event, Brugada highlighted its connection with multiple Mexico City Metro stations.[3]

The Ciclovía La Gran Tenochtitlán cost Mex$186,667,857. According to the construction contract, the project was carried out by seven companies, which were required to complete it by November 2025.[9] The Calzada Flotante Tlallipan ultimately cost Mex$2,002,399,003.70, compared with an original projected cost of Mex$659,000,000.[10][11]

Following the 2026 FIFA World Cup final, the project remained under construction.[12] The project was concluded on 26 July 2026.[13]

Reception

Criticism

The bikeway received criticism from residents because it is intended for tourists ahead of the 2026 FIFA World Cup soccer games, with some sectors of the population calling it "social cleansing", and sex workers stating that it has displaced them, as Calzada de Tlalpan is a red-light district.[14] Local vendors estimated a decline in sales during construction.[15] Motorists criticized the reduction by two lanes for the construction, which would cause traffic congestion.[16] A skatepark was demolished amid criticism from skaters, who questioned the preference given to one sport over the other.[17]

San Antonio Abad metro station had to be rebuilt because of the bridge.[18] The Mexico City Metro labor union questioned the project, describing it as "cosmetic", indicating that tourists will not primarily visit Estadio Azteca by bicycle, and stating that it would eventually lead to subsidence, leaks, seepage, and damage to tracks and infrastructure of Line 2.[19]

Issues

The day the Calzada Flotante Tlalpilli was inaugurated, on 7 June, water pooled on its surface, and water seeped into the San Antonio Abad metro station.[20]

References

  1. ↑ González Alvarado, Rocío (19 April 2026). "Gobierno CDMX inaugura la ciclovía que conectará el Centro Histórico con el Estadio Azteca". La Jornada (in Spanish). Retrieved 21 April 2026.
  2. ↑ González Alvarado, Rocío; Ramírez Bautista, Nayelli (20 April 2026). "Aún sin concluir obras, inauguran ciclovía en CDMX". La Jornada (in Spanish). Retrieved 21 April 2026.
  3. 1 2 "Inaugura Clara Brugada Ciclovía la Gran Tenochtitlán; Calzada de Tlalpan se transforma en vía multimodal". El Financiero (in Spanish). 19 April 2026. Retrieved 21 April 2026.
  4. ↑ "Clara Brugada anuncia construcción de 300 km de ciclovías durante su sexenio". Reporte Índigo (in Spanish). 3 June 2025. Retrieved 21 April 2026.
  5. ↑ Mora, Karla (19 April 2026). "Calzada Flotante toma forma sobre Tlalpan rumbo al Mundial 2026". El Sol de México (in Spanish). Retrieved 21 April 2026.
  6. ↑ "Avanza ciclovía de Tlalpan a contrarreloj". Luces del Siglo (in Spanish). 5 January 2026. Retrieved 21 April 2026.
  7. ↑ González Alvarado, Rocío (7 June 2026). "Brugada inaugura Calzada Flotante Tlallipan sobre estaciones Pino Suárez y Chabacano de línea 2 del Metro". La Jornada (in Spanish). Mexico City. Retrieved 8 June 2026.
  8. ↑ "Inauguran Ciclovía Gran Tenochtitlán en CDMX: ruta de 30 km sobre Calzada de Tlalpan". Récord (in Spanish). 19 April 2026. Retrieved 21 April 2026.
  9. ↑ Arana, Laura (5 February 2026). "Ciclovía de Tlalpan debía estar terminada en noviembre". El Universal (in Spanish). Retrieved 8 June 2026.
  10. ↑ Parra, Abigail (5 June 2026). "Calzada Flotante de Tlalpan; la obra 'magna' de Clara Brugada con el Mundial 2026 como pretexto". Marca. Retrieved 8 June 2026.
  11. ↑ Martínez, Marco Antonio (29 May 2026). "Tlalpan: Calzada flotante costará 2 mil millones, el triple de lo planeado; no se entregará a tiempo". La Silla Rota (in Spanish). Retrieved 8 June 2026.
  12. ↑ Sarabia, Dalila (21 July 2026). "Acabó el Mundial 2026, siguen inconclusas obras prometidas por la CDMX" [The 2026 World Cup is over, but projects promised by Mexico City remain unfinished]. Animal Político (in Spanish). Retrieved 22 July 2026.
  13. ↑ Coello, Luz (27 July 2026). "Concluyeron obras en el Metro Chabacano para conectar con el Jardín Flotante en Tlalpan después del Mundial" [Work on the Chabacano Metro station to connect with the Jardín Flotante in Tlalpan was completed after the World Cup] (in Spanish). Retrieved 31 July 2026.
  14. ↑ "Protestan contra 'limpieza social' por ciclovía en CDMX rumbo al Mundial". López-Dóriga Digital (in Spanish). 19 April 2026. Retrieved 21 April 2026.
  15. ↑ García, Rafael (9 October 2025). "Comerciantes de Tlalpan reportan caída de hasta 90% en sus ventas debido a construcción de Ciclovía Gran Tenochtitlán". El Universal (in Spanish). Retrieved 21 April 2026.
  16. ↑ Arana, Laura (3 March 2026). "'No es la ciclovía la que reduce el carril': Experto de la UNAM sobre ciclovía en calzada de Tlalpan". El Gráfico (in Spanish). Retrieved 21 April 2026.
  17. ↑ Arochi, Ximena (11 May 2026). "Brugada defiende la demolición del skatepark de San Antonio Abad pese a las críticas" [Brugada defends the demolition of the San Antonio Abad skatepark despite criticism]. Proceso. Retrieved 11 May 2026.
  18. ↑ López, Jonás (13 April 2026). "Desmantelan la estación San Antonio Abad". Excélsior (in Spanish). Retrieved 21 April 2026.
  19. ↑ Arana, Laura (21 October 2025). "Líder del Sindicato del Metro califica construcción de ciclovía en Tlalpan como 'ocurrente y cosmética'". El Universal (in Spanish). Retrieved 21 April 2026.
  20. ↑ Valiente, Alberto (7 June 2026). "Se estrena la Calzada Flotante de Tlalpan con encharcamientos y filtraciones de agua al Metro". Latinus. Retrieved 8 June 2026.