Chennai–Hyderabad high-speed rail corridor

Chennai–Hyderabad High-speed Rail Corridor
Overview
Other nameHCHSR
StatusDPR Prepared, To be approved by govt.[1]
OwnerIndian Railways
Locale
Termini
Stations18
Websitewww.nhsrcl.in
Service
TypeHigh-speed rail
OperatorNational High Speed Rail Corporation Limited
Rolling stockTBD
History
Planned openingTBD
Technical
Line length744.57[1] km (462.65 mi)
CharacterElevated, underground, and grade-separated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV AC, 50 Hz, overhead catenary
Operating speed350 km/h (220 mph)
Route map

Chennai
Minjur
Tiruvallur
Tirupati
Gudur
Nellore
Kavali
Ongole
Chirala
Guntur
Amaravati
Dachepalli
Vadapalli
Haliya
Dry Port
Bharat City
Shamshabad
Hyderabad [2]

The Chennai–Hyderabad High Speed Rail Corridor is a planned high-speed rail line connecting the capital of Tamil Nadu, Chennai with the capital Telangana, Hyderabad via the capital of Andhra Pradesh, Amaravati. When completed, it will be one of key links in India's high-speed rail line network along the east coast. Set to be the third high-speed rail line project of India involving Hyderabad, it will reduce the travel time between the cities of Chennai and Hyderabad from existing 12 hours to around 2.5 hours.[3][4][5]

The corridor via Amaravati was first proposed by the Chief Minister of Andhra Pradesh N. Chandrababu Naidu in October 2024, requesting the union government to provide a high-speed rail connectivity between the southern economic hubs of Chennai, Bengaluru, Hyderabad and Amaravati, with the works stated to commence in 2026 post approval.[6]

Possible Stations

Planned stations - Chennai, Minjur, Tiruvallur, Tirupati, Gudur, Nellore, Kavali, Ongole, Chirala, Guntur, Amaravati, Dachepalli, Vadapalli, Haliya, Dry Port, Bharat City, Shamshabad and Hyderabad. [7]

Extensions

The corridor's section from Chennai to Amaravati is a part of the Chennai–Kolkata high-speed rail corridor, part of the bigger Diamond Quadrilateral, India's ambitious project aiming to connect all four major cities of Delhi, Mumbai, Chennai and Kolkata with High-speed rail.[8]

See also

References

  1. 1 2 Bharat, E. T. V. (29 August 2025). "Bullet Train In Southern States: Centre Approves Two High-Speed Rail Corridors". ETV Bharat News. Retrieved 29 August 2025.
  2. ↑ "Indian Railways Map". Indian Railways Map. Ministry of Railways. Retrieved 12 May 2026.
  3. ↑ Today, Telangana (29 August 2025). "South India bullet train to link Hyderabad, Chennai, Amaravati and Bengaluru: Naidu". Telangana Today. Retrieved 29 August 2025.
  4. ↑ "South India will soon have bullet train service, says Andhra Pradesh CM Naidu". The Economic Times. 29 August 2025. ISSN 0013-0389. Retrieved 29 August 2025.
  5. ↑ "How Hyderabad To Chennai, Bangalore High-Speed Rail Corridors Will Transform Travel In Telugu States". News18. Retrieved 29 August 2025.
  6. ↑ Rayasam, Raj (29 August 2025). "Pawan pitches for NDA's stability at Jana Sena legislature meet". The South First. Retrieved 29 August 2025.
  7. ↑ "Hyderabad-Chennai Bullet Train Route Gets Realigned". Deccan Chronicle.
  8. ↑ "Bullet train ambitions". The Financial Express. 18 January 2025. Retrieved 1 September 2025.