Cambridge South railway station
![]() East entrance on station opening day | |||||
| General information | |||||
| Location | Cambridge Biomedical Campus England | ||||
| Coordinates | 52°10′27″N 0°07′52″E / 52.1741°N 0.1310°E | ||||
| Manager | Greater Anglia[1] | ||||
| Platforms | 4 | ||||
| Other information | |||||
| Station code | CMS | ||||
| Key dates | |||||
| January 2023 | Construction began | ||||
| 28 June 2026 | Station opened[2] | ||||
| |||||
Cambridge South railway station is a railway station in the south of the city of Cambridge, England. It serves the Cambridge Biomedical Campus (which includes Addenbrooke's Hospital and AstraZeneca's headquarters) and the adjacent suburb of Trumpington. The station is located on the Cambridge line and the West Anglia Main Line, 2.3 km (1.4 miles) south of Cambridge railway station. It is one of three stations in Cambridge alongside the main station and Cambridge North, the latter of which opened in 2017.
The station was first proposed in 2017, and construction works started in 2023. It opened on 28 June 2026, and is the first station to carry the Great British Railways (GBR) branding. The station is managed by Greater Anglia and is also served by CrossCountry, Great Northern and Thameslink trains. All passenger trains call at the station.
Background
History

(current in bold, closed in italics)

A temporary station, known as Trumpington, was once located approximately 570 m (1,870 ft) north of the current Cambridge South station site. It was specifically constructed for the Royal Agricultural Society's show for four days between 4 July and 8 July 1922. After the event concluded, the station was then permanently demolished. Nothing of the original station survives or is visible today.[3]
Proposal
Railways around Cambridge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Another new station to the south of Cambridge station was proposed by the Cambridgeshire County Council in January 2017[4] (shortly before the opening of Cambridge North station in May 2017[5]), although the Cambridge Liberal Democrats had campaigned for it in the 1990s, then known as "Addenbrooke's Station".[6] In August 2017, Transport Secretary Chris Grayling backed plans for a new station as part of the proposed East West Rail project,[7][8] with a possible opening date of 2021,[9] that could also include a light rail link.[10] An unsuccessful application was made to the New Stations Fund 2 in August 2017,[11] but £5 million was allocated to the project in the November 2017 United Kingdom budget.[12]
The public consultation opened in January 2020 and lasted for eight weeks.[13][14] At the time, Network Rail estimated the station to open between 2025 and 2027.[13] Funding for the station was announced in the budget of March 2020.[15] Three options for its location near Addenbrooke's Hospital were identified between the Cambridgeshire Guided Busway bridge on Cambridge Biomedical Campus to the north and the Addenbrooke's Road bridge to the south.[16] In June 2020, Network Rail stated that out of three options, its preferred location for the station was at a site adjacent to the Biomedical Campus and the Guided Busway crossing.[17] A second consultation was launched in October 2020, and lasted for approximately six to eight weeks.[18] Network Rail submitted a Transport and Works Act Order application in June 2021 for a station on this site.[19] In September 2022, Chancellor Kwasi Kwarteng announced Cambridge South as one of the 138 major infrastructure projects that the government aimed to fast-track.[20]
Construction and facilities


In December 2022, the station was given a Transport and Works Act Order approval, which authorised construction of the station and track laying. The station is built to be fully accessible by people with disabilities and has 1,000 cycle spaces.[21][1] Construction work on the station then started in January 2023.[21] The funding for the £250 million project was fully agreed by the government in June the same year.[6] In addition, AstraZeneca, Cambridgeshire and Peterborough Combined Authority, and the Greater Cambridge Partnership have contributed £5 million to the project.[6] In October 2023, Network Rail awarded a £93.4 million contract for the construction of the station to J Murphy & Sons Ltd. It has four platforms and is expected to be used by 1.8 million passengers per year.[22]
The station was originally scheduled to open in December 2025,[23] but this was delayed to early and then June 2026 in February and November 2025, first due to an upgrade to signalling across Cambridge and due to timetable changes on the East Coast Main Line, and then due to one of the subcontractors involved in the internal fit-out of electrical and mechanical systems of the station going into administration.[24][25] Network Rail estimated that the station would cost £173 million in January 2023 and £228 million in November 2025.[26] The Department for Transport announced the station's opening date of 28 June 2026 the previous month.[27] It is the first station in the United Kingdom to carry the Great British Railways (GBR) branding in advance of the full renationalisation of passenger services in England under GBR.[28][29][30][31]
As part of the Cambridge South station works, South Rail Systems Alliance (SRSA) made several improvements on the West Anglia Main Line (WAML) between Cambridge station and Shepreth. This includes the remodelling of Shepreth Branch Junction (where the WAML and Cambridge lines diverge) in order to allow trains to navigate the junction faster, and almost 10 km (6.2 miles) of new overhead line equipment. These improvements were finished in May 2025[32][33][34] and followed by a renewal of the signalling system during the 2025 Christmas holiday season.[35]
Network Rail projected that 95% of passengers using the station will travel onwards by public transport, walking, or cycling.[36] The station does not have a public car park, with its 15 spaces reserved for blue badge holders (given to people with certain disabilities), staff, taxis, and pick-up/drop-off.[37][38] The station features artwork Together We from Turner Prize nominee Mark Titchner, installed on the balustrades of the stairs.[39] It also features solar panels on the station roof in an effort to reduce 22 per cent of the station's carbon footprint.[40][41] As the station is located next to a nature reserve at Hobson's Park, its design was taken into account in order to blend in with the surroundings. This included a green roof and a rainwater catchment system that stores and releases rainwater carefully back into the environment.[41]
Services
Cambridge South is served currently by four train operating companies.[1]
- Greater Anglia:[42]
- 2 trains per hour (tph) to London Liverpool Street;
- 1 tph to Norwich, via the Breckland Line;
- 1 tph to Stansted Airport;
- 2 tph to Cambridge North – some services extend to Ely during peak times.
- CrossCountry:[43]
- 1 tph to Birmingham New Street, via Leicester;
- 1 tph to Stansted Airport (some off-peak services terminate at Cambridge instead)
- Great Northern:[44]
- 2 tph which run non-stop to London Kings Cross
- 1 tph that calls at all stations on the Cambridge line, before running semi-fast to Kings Cross
- 2 tph to Ely, one of which (and both during peak times) extend to Kings Lynn
- 1 tph to Cambridge
- Thameslink:[44]
- 2 tph to Brighton via London St Pancras.
- 2 tph to Cambridge.
| Preceding station | Following station | |||
|---|---|---|---|---|
| Stansted Airport | CrossCountry Birmingham–Stansted Airport |
Cambridge | ||
| Foxton or London King's Cross |
Great Northern Cambridge line |
|||
| Shelford or Whittlesford Parkway |
Greater Anglia West Anglia Main Line |
|||
| Royston | Thameslink Thameslink |
|||
| Future services | ||||
| Cambourne | East West Rail Oxford to Cambridge |
Cambridge | ||
See also
- Cambridge East railway station – Proposed station in Cambridge, England to serve a new suburb to occupy the Cambridge Airport site.
References
- 1 2 3 "Cambridge South Railway Station". Greater Anglia. Archived from the original on 18 July 2026. Retrieved 19 July 2026.
The station is served by Greater Anglia, Cross Country, Great Northern and Thameslink trains.
- ↑ "Cambridge South railway station officially opens". BBC News. 28 June 2026. Archived from the original on 6 July 2026. Retrieved 6 July 2026.
- ↑ "Trumpington Station". Disused Stations. Retrieved 2 January 2025.
- ↑ Kitchener, Karen (16 January 2017). "Cambridge South Station – Project Update" (PDF). Cambridge City Council. Retrieved 12 July 2026.
- ↑ "Delayed £50m Cambridge North railway station opens". BBC News. 21 May 2017. Archived from the original on 14 January 2025. Retrieved 2 January 2025.
- 1 2 3 Dexter, Aimee (27 June 2026). "Everything you need to know about Cambridge South station". BBC News. Retrieved 28 June 2026.
- ↑ Thomas, Josh (11 August 2017). "An Addenbrooke's train station has got the thumbs-up from the Transport Secretary". Cambridge News. Archived from the original on 5 June 2026. Retrieved 12 August 2017.
- ↑ Thomas, Josh (22 May 2017). "Cambridge looks ahead to another new train station at Addenbrooke's Hospital". Cambridge News. Archived from the original on 5 June 2026. Retrieved 12 August 2017.
- ↑ Thomas, Josh (20 June 2017). "Another new Cambridge train station could be here within four years". Cambridge News. Archived from the original on 29 June 2026. Retrieved 12 August 2017.
- ↑ Comber, Ben (23 August 2017). "Light rail link will mean no need for Cambridge South station car park says mayor Palmer". Cambridge Independent. Archived from the original on 22 November 2018. Retrieved 22 November 2017.
- ↑ "Nineteen bids for New Stations Fund second round". Proposed Railway Schemes. 22 August 2017. Archived from the original on 29 June 2026. Retrieved 22 November 2017.
- ↑ "Chancellor accepts East West Rail targets and strengthens plans with extra cash". Rail Technology Magazine. 22 November 2017. Archived from the original on 1 December 2017. Retrieved 15 July 2026.
- 1 2 "Cambridge station plans to go on public view". BBC News. 19 December 2019. Archived from the original on 2 March 2026. Retrieved 27 June 2026.
- ↑ "Reminder: Public consultation for new Cambridge South Station starts next week". Network Rail Media Centre. 14 January 2020. Archived from the original on 18 February 2025. Retrieved 27 June 2026.
- ↑ Gardner, Gemma (11 March 2020). "Government announce funding for Cambridge South station". Cambridge Independent. Retrieved 15 July 2026.
- ↑ Gardner, Gemma (20 January 2020). "Three locations for Cambridge South station unveiled". Cambridge Independent. Retrieved 15 June 2026.
- ↑ "Cambridge South station's preferred location selected". Network Rail. Archived from the original on 25 June 2020. Retrieved 22 June 2020.
- ↑ "Public consultation on Cambridge South station". Network Rail Media Centre. 5 October 2020. Archived from the original on 29 June 2026. Retrieved 27 June 2026.
- ↑ "Cambridge South station". Network Rail. Archived from the original on 25 July 2025. Retrieved 23 June 2021.
- ↑ Morby, Aaron (23 September 2022). "Fast-track 138-project growth plan – full list". Construction Enquirer. Retrieved 16 November 2022.
- 1 2 Findlay, Cait (19 January 2023). "First look as Cambridge South station work begins after approval". Cambridgeshire Live. Retrieved 11 May 2023.
- ↑ "Cambridge South station building company gets £93m contract". BBC News. 24 October 2023. Retrieved 31 October 2023.
- ↑ Howgego, Emma (7 November 2025). "Railway station opening delayed for second time". BBC News. Retrieved 11 November 2025.
- ↑ Middleton, Siobhan (24 February 2025). "Cambridge South station opening pushed back". Cambridgeshire Live. Retrieved 25 February 2025.
- ↑ Howgego, Emma (7 November 2025). "Cambridge South railway station opening delayed for second time". BBC News. Retrieved 3 February 2026.
- ↑ Lee, Matt (17 January 2026). "Spending rises by £55m on delayed Cambridge South station project". Cambridgeshire Live. Retrieved 13 June 2026.
- ↑ Gordon-Farleigh, Neve (11 May 2026). "Full steam ahead as date revealed for new railway". BBC News. Archived from the original on 28 June 2026. Retrieved 11 May 2026.
- ↑ Bestwick, Alex (11 May 2026). "First New Great British Railways Station To Open Next Month". Railway Magazine. Retrieved 11 May 2026.
- ↑ Gordon-Farleigh, Neve (11 May 2026). "Date revealed for opening of new railway station". Archived from the original on 28 June 2026. Retrieved 11 May 2026.
- ↑ Topham, Gwyn (11 May 2026). "Delayed Great British Railways' first station to open at Cambridge South in June". The Guardian. Retrieved 11 May 2026.
- ↑ Sexton, Daniel (21 May 2026). "First Great British Railway branded train unveiled in Brighton". BBC News. Retrieved 6 July 2026.
- ↑ "Rail infrastructure upgrades complete for Cambridge South station". Network Rail Media Centre. 16 May 2025. Archived from the original on 12 March 2026. Retrieved 11 June 2026.
- ↑ Smith, Roger (16 May 2025). "Watch: Infrastructure work completed ready for new rail station at Cambridge". RailAdvent. Archived from the original on 15 March 2026. Retrieved 11 June 2026.
- ↑ Hakimian, Rob (16 May 2025). "£40m of track upgrades completed in preparation for new Cambridge South station". New Civil Engineer. Archived from the original on 17 May 2025. Retrieved 11 June 2026.
- ↑ Jackson, Tom; Dexter, Aimee (30 January 2026). "Railway signal system for Cambridge gets upgrade after 40 years". BBC News. Archived from the original on 29 June 2026. Retrieved 11 June 2026.
- ↑ Coffey, Lesley (4 October 2022). "The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022" (PDF). Planning Inspectorate.
- ↑ Sleator, Laurence (11 March 2025). "£200m Cambridge station to have 1,000 bike spaces but no car park". The Times. Retrieved 13 March 2025.
- ↑ Neath, Amelia (12 March 2025). "New £200m train station will boast 1,000 bike spaces – but no car park". The Independent. Retrieved 16 March 2025.
- ↑ Prickett, Katy (8 June 2026). "Cambridge South railway station unveils Turner prize nominee's art". BBC News. Archived from the original on 16 July 2026. Retrieved 16 July 2026.
- ↑ Taplin, Phoebe (25 June 2026). "Art trails, swimming spots and punt safaris, all easily accessible from Cambridge's new train station". The Guardian. Retrieved 27 June 2026.
- 1 2 Smith, Roger (28 June 2026). "New Cambridge railway station officially opens". RailAdvent. Retrieved 29 June 2026.
- ↑ "Timetables". Greater Anglia. 17 May 2026. Archived from the original on 26 November 2020. Retrieved 15 July 2026.
- ↑ "Timetables and Schedules". CrossCountry. 17 May 2026. Archived from the original on 13 October 2025. Retrieved 15 July 2026.
- 1 2 "Train Timetables". Greater Thameslink Railway. 17 May 2026. Archived from the original on 7 March 2026. Retrieved 15 July 2026.
External links
- Train times and station information for Cambridge South railway station from National Rail
- Cambridge South station, Network Rail
- Cambridge South: a new station in the south of Cambridge (consultation), National Rail (UK Government Web Archive)
- Buildings and structures in Cambridge
- Cambridge line
- East West Rail
- Rail transport in Cambridge
- Railway stations in Cambridgeshire
- Railway stations in Great Britain opened in 2026
- Railway stations served by CrossCountry
- Railway stations served by Greater Anglia
- Railway stations served by Greater Thameslink Railway
