Alto (high-speed rail)
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Service type | High-speed rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | In planning | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Locale | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| First service |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Current operator | Cadence consortium (planned) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini | Toronto Quebec City | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stops | 7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Distance travelled | 1,000 km (620 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operating speed | At least 300 km/h (190 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track owner | Government of Canada | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Company | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Type | Subsidiary | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Founded | November 29, 2022[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Headquarters | Montreal, Quebec , Canada | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Key people |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Parent | Via Rail Canada Inc. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Website | www | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Alto (stylized in all caps) is a planned high-speed rail line in Canada, intended to connect major cities including Toronto, Ottawa, Montreal, and Quebec City. The planning and development of the line is being overseen by a federal Crown corporation operating under the same name (legally VIA HFR – VIA TGF Inc.)[3] which is a wholly owned subsidiary of Via Rail Canada Inc.[4]
Announced by Prime Minister Justin Trudeau on February 19, 2025, Alto (previously Via HFR) will be co-developed by the private consortium Cadence (whose members include Keolis, SNCF, and Air Canada) as part of a design phase that is estimated to cost $3.9 billion and is expected to last six years. The preliminary cost for the network estimated between $60 billion and $90 billion.[5] After co-designing the network with Alto, Cadence will build, finance, operate, and maintain the publicly-owned network.[6]
The railway network will feature trains that will reach top speeds of 300 km/h (190 mph) or more[7] (likely 320 km/h (200 mph)),[8] much greater than that of Via Rail's current fastest services, which have a maximum operating speed of 100 mph (160 km/h) on select sections of track.[a] The network is planned to consist of approximately 1,000 kilometres (620 mi) of new passenger-dedicated, mainly electrified track,[9][10][11] and is expected to begin preliminary construction in 2029, with major construction beginning in 2030.[7] The network will be built in phases, with the first phase from Ottawa and Montreal, with an intermediary station in Laval.[12]
History
Background
Several studies for Canadian high-speed rail have been created over the decades, but no project advanced to the design phase. The focus area of these studies was the Quebec City–Windsor Corridor, the most densely populated region of Canada. Located in the provinces of Ontario and Quebec, this region is home to approximately half of Canada's population and contains its capital, Ottawa, and its two largest cities, Toronto and Montreal.
In November 2022, the Canadian government announced the planning of a "high-frequency rail" (HFR) line on Via Rail's existing Quebec City–Windsor Corridor. This project was called Via HFR.[13] Via HFR was founded as a Crown corporation on November 29, 2022,[1] under the official company name Via HFR – Via TGF and as a subsidiary of Via Rail,[14] to "oversee what was initially pitched as a 'high frequency' rail project".[15] Its headquarters was chosen to be Montreal and the president and CEO of the Montreal Port Authority Martin Imbleau was later chosen to be its CEO.[2] The High Frequency Rail project would have involved constructing 1000 km of passenger-dedicated electrified track, with trains that travelled at average speeds of up to 200 km/h.[16] The chosen private development partner would have designed, constructed, financed, operated, and maintained the high frequency rail service as well as existing local services.[17]
Announcement
Alto was officially announced by Prime Minister Justin Trudeau in Montreal on February 19, 2025. It was announced as a revision of the Via HFR project, which was to now be a high-speed rail line from Quebec City to Toronto.[13] The Crown corporation known as Via HFR began operating under the name Alto, and its responsibilities were set as defining the desired project outcomes, performing project management, and co-designing the system.[7] Via Rail was assigned the role of providing advice on the technical and operational aspects of existing passenger railway services in the Quebec City–Windsor Corridor.[18]
The federal government chose the design, construction, financing, operation, and maintenance of the rail network—also named Alto—to be the responsibility of the private Cadence consortium (which includes the French state-owned rail operator SNCF Voyageurs and the private airline Air Canada) after an open bidding process.[15][19] The Canadian government will retain ownership of the Alto corporation, Via Rail, and all new and existing assets built through the project.[20] In the announcement, Trudeau described the project as the "largest infrastructure project in Canadian history" and added that it would be "a game-changer for Canadians". The line is to span Toronto and Quebec City, with five stops in between: Peterborough, Ottawa, Montreal, Laval, and Trois-Rivières.[21] On June 22, 2026, the federal government announced they would consider adding an additional stop in Kingston.[22]
Development
Once Cadence was selected as the private development partner (PDP), the Alto project entered the co-development phase. During this phase, the project will move through four pre-construction stages, gradually increasing the level of development. Stage 1 will consist of initial agreement between the PDP and Alto, Stage 2 will include determining the preferred track alignment, Stage 3 will involve developing designs for routes between multiple pairs of cities, and Stage 4 will involve progressing the design of the overall system to 50% completion. The approach of designing route segments between pairs of cities was chosen to reduce the risk of project delays and to enable useful service without needing the entire line to be complete.[23]
On September 14, 2025, an initial list of "nation-building" projects was announced by the federal government, and Alto was not one of them. In an interview, Alto's CEO Martin Imbleau said that he expected that Alto would make it onto a future list of priority projects once development advances further. He reiterated that phased construction is expected to start in 2029 or 2030, with the first of four route segments being completed 6–8 years after construction starts and the entire network being finished in 12–14 years (2041–2044).[24] On December 12, 2025, the federal government announced that the first phase of Alto would be between the cities of Ottawa and Montreal.[25]
Stations

The Alto high-speed rail network was initially announced to have stops in seven cities. Additional stations are under consideration in Kingston and in the Greater Toronto Area.[26]
| Province | City | Metro population (2021) | Rank |
|---|---|---|---|
| Ontario | Toronto | 6,202,225 | 1 |
| Peterborough | 128,624 | 32 | |
| Ottawa | 1,488,307 | 4 | |
| Quebec | Montreal | 4,291,732 | 2 |
| Laval | |||
| Trois-Rivières | 161,489 | 28 | |
| Quebec City | 839,311 | 7 |
Bidding process
Participating consortia
In July 2023, the government selected three consortia to proceed to the request-for-proposals (RFP) stage for what was then known as the High Frequency Rail project:[27][28][29][30]
Cadence (winner)
- Caisse de dépôt et placement du Québec (CDPQ Infra) (Canada)
- AtkinsRéalis Group (formerly known as SNC-Lavalin) (Canada)
- SYSTRA Canada (France)
- Keolis Canada (France/Canada)
- Air Canada (Canada)
- SNCF Voyageurs (France)
Intercity Rail Developers
- Intercity Development Partners (Canada)
- Kilmer Transportation (Canada)
- First Rail Holdings (United Kingdom)
- Jacobs (United States)
- Hatch (Canada)
- CIMA+ (Canada)
- FirstGroup (United Kingdom)
- RATP Dev Canada (France/Canada)
- Renfe Operadora (Spain)
- Meridiam (France)
- DF Canada Infrastructure Group (Canada)
- EllisDon Capital (Canada)
Partenaires Ferroviaires Qconnexion Rail Partners
- Fengate (Canada)
- John Laing (United Kingdom)
- Bechtel (United States)
- WSP Canada (Canada)
- Deutsche Bahn (Germany)
Winning consortium (Cadence)
On February 19, 2025, the winning consortium was announced to be Cadence after a multi-year procurement process.[31][32] Cadence will co-design, build, finance, operate, and maintain the Alto project.[6]
Travel times
Official estimated/planned travel times by Alto and comparison to other modes, including the current Via Rail Quebec City–Windsor Corridor service:[33]
| Route | Alto | Via Rail | Driving |
|---|---|---|---|
| Toronto–Ottawa | 2:09 | ~4:30 | ~4:30 |
| Toronto–Montreal | 3:07 | 5:30 | ~5:30 |
| Toronto–Peterborough | 0:40 | N/a | ~1:30 |
| Ottawa–Montreal | 0:58 | ~2:00 | ~2:00 |
| Montreal–Quebec City | 1:29 | ~3:20 | ~3:00 |
| Montreal–Trois-Rivières | 0:50 | N/a | ~1:30 |
- Current Via Rail trains (Siemens Charger locomotives and Venture cars) have a design top speed of 125 mph (200 km/h) but have a maximum operating speed of 100 mph (160 km/h) due to infrastructure limitations.
- Driving times are based on average conditions and typical routes. Actual travel times may vary depending on traffic, weather, and road conditions.
Alto's average speed
With the route from Toronto to Montreal via Ottawa being approximately 610 km (380 mi) long, Alto high-speed trains would make the 3 hour 7 minutes trip at an average speed of approximately 196 km/h (122 mph) including stops at stations.[34] For comparison, Amtrak's Acela service operates at an average speed of 132 km/h (82 mph) between New York City and Washington, D.C. (its fastest segment),[35][36] while in France, SNCF Voyageurs operates the LGV Est, a TGV service at an average speed of 279 km/h (173 mph) between the Reims area and the Metz–Nancy region.[37][38]
Benefits
By travelling at speeds of up to 320 km/h (200 mph) on dedicated passenger tracks, the Alto high-speed rail project would reduce travel times between Toronto and Montreal to approximately three hours. This lies in the ideal time range to make rail journeys attractive and to allow for frequent trips.[39] Low-cost tickets and frequent service could attract enough passengers for intermediary stations to be built to serve commuters. This could expand access to affordable housing in small towns, while trips between the major cities could remain fast by running non-stop and express service, in response to market demand.[39]
Constructing high-speed rail between Toronto and Quebec City is expected to support up to 51,000 construction jobs over ten years and approximately 5,000 jobs once the line is operational.[33] Alto has described one-time economic impacts from project spending, including up to $86 billion in value added to GDP and up to $23 billion in tax revenue. It has also identified separate benefits for travellers and communities, including time savings, emissions reductions, vehicle cost savings, decongestion, and road safety benefits.[40]
A 2025 C.D. Howe Institute study estimated $15 billion–$27 billion in selected economic benefits over 60 years. The study noted that it was not a full cost-benefit analysis and measured selected economic benefits, rather than all project costs and benefits.[41]
In February 2025, Prime Minister Justin Trudeau stated that the project could boost GDP by up to $35 billion annually.[42] In April 2026, Transport Canada stated that the project could enable productivity benefits that could lift Canada's GDP by up to $35 billion, while fare revenues were projected to exceed $100 billion over the first 40 years of full operations.[43]
The network's use of electrified track will reduce emissions from car and air trips in the Toronto–Quebec City corridor, helping Canada to meet its climate goals.[7] The Government of Canada will require the Cadence consortium to deliver minimum project outcomes, including "producing a significant modal shift to passenger rail; providing barrier-free access to services according to the latest accessibility standards; and improved on-time performance across the Corridor."[7] Additionally, the entry of high-speed rail into regional transportation markets typically results in improved on-time flight performance, service quality, and price competition.[44]
Criticism
The project's public-private partnership (P3) structure has been criticized for increasing the risk of project difficulties and reducing the potential benefits of the proposed high-speed line, compared to a line fully owned and operated by a public entity.[45][46][47][48] A private operator could increase ticket prices to maximize profitability, which would limit the number of travellers switching from driving and air travel to rail travel. The private consortium may also be incentivized to reduce labour costs by terminating obstructive union agreements when they come up for renewal, and any changes in Alto's schedules, stations, or routes would have to be negotiated with the private consortium, potentially resulting in costly litigation.[46] With many high-speed rail lines requiring additional government subsidy,[49] some fear that this project may result in another financial burden to taxpayers and subject to government funding cuts in the future similar to the 1980s cuts to Via Rail. In response to these criticisms, the CEO of Alto Martin Imbleau stated on record that Alto would generate net-positive revenue and require zero subsidies.[50]
Ryan Katz-Rosene, an associate professor in political studies at the University of Ottawa whose research includes ecological political economy and environmental policy, argued in The Conversation that the project may have a limited effect on Canada's total national greenhouse gas emissions, rather than assessing its effect only within intercity passenger transportation.[51] Other sources emphasize potential emissions reductions within the intercity transportation sector through modal shifts from car and air travel to electrified rail.[33] The project remains in the co-development phase, with environmental impacts subject to further study through ongoing field work, consultations, and federal impact assessment processes.[52]
Transport Action Canada raised concerns about Air Canada's participation in the Cadence consortium, arguing that its role as an airline operating in the same corridor could present a potential conflict of interest. Air Canada stated that its participation was intended to support integration between the future intercity rail network and existing airport hubs in the Quebec–Windsor corridor.[53][54]
The rail advocacy organization Transport Action Canada compared the estimated travel time of 3 hours 7 minutes between Toronto and Montreal at an average speed of 196 km/h to an earlier study done by Via Rail, which estimated a Toronto–Montreal trip time of 2 hours 15 minutes and corresponding average speed of 271 km/h (assuming a maximum speed of 350 km/h).[45] They noted that Alto's cost estimates are more than double the average per-kilometre cost for high-speed rail construction in Europe, which has itself been found to be excessive by the European Court of Auditors.[45]
Wildlife Preservation Canada has expressed deep concern about the negative impacts this project could have on the many wildlife species that inhabit the region of the proposed routes. One of the proposed Alto routes is of particular concern as it would run through a globally rare alvar grassland habitat—the Napanee Limestone Plain—that is home to an endangered species on the brink of extinction in Canada: the eastern loggerhead shrike.[55]
On March 31, 2026, Conservative Party leader Pierre Poilievre called for the cancellation of the Alto project, describing it as a "boondoggle" and citing concerns about costs, land use, and potential expropriation of property.[56]
Local opposition has also emerged in some communities, with landowners concerned about impacts to their properties and to the local environment.[57] Alto has stated that no final route has been selected and that it is undertaking studies and consultations to identify and mitigate potential impacts where possible.[58]
Notes
- ↑ Via's Siemens Charger locomotives and Venture cars are capable of 125 mph (200 km/h) speeds but are limited to 100 mph (160 km/h) in service.
References
- 1 2 "Cadence consortium selected to develop 300 km/h Toronto – Québec high speed railway". Railway Gazette International. February 19, 2025. Retrieved February 19, 2025.
- 1 2 "Martin Imbleau appointed Chief Executive Officer of Via HFR – Via TGF INC". Alto. Archived from the original on August 11, 2025. Retrieved September 12, 2025.
- ↑ Canada, Transport (November 26, 2024). "Via HFR - Via TGF Inc". Transport Canada. Retrieved April 30, 2026.
- ↑ "About Alto". www.altotrain.ca. Retrieved May 9, 2026.
- ↑ "Your questions about Alto | Cost, timeline and public feedback". www.altotrain.ca. Retrieved April 30, 2026.
- 1 2 "Project Delivery". Alto. Archived from the original on February 23, 2025. Retrieved March 29, 2025.
- 1 2 3 4 5 "Frequently Asked Questions (FAQs)". www.altotrain.ca. Retrieved April 30, 2026.
- ↑ "Alto's commitment to rural communities". www.altotrain.ca. Retrieved April 30, 2026.
- ↑ "Building Canada's Future with High‑Speed Rail". www.altotrain.ca. Retrieved May 9, 2026.
- ↑ May, Tiana (March 26, 2025). "Alto: Agreement Signed for Toronto-Quebec City High-Speed Rail Project". Railway-News. a2b Global Media. Retrieved March 29, 2025.
- ↑ "Canada chooses high-speed to connect its eastern cities". International Railway Journal. Retrieved November 25, 2025.
- ↑ "Full speed ahead: Ottawa–Montreal chosen as starting point for Alto High-Speed Rail". www.altotrain.ca. Retrieved April 30, 2026.
- 1 2 Caruso-Moro, Luca (February 19, 2025). "A 'game changer': Trudeau gives update on high-speed rail project". CTV News. Archived from the original on August 25, 2025. Retrieved February 19, 2025.
- ↑ "Via HFR Inc". Transport Canada. Retrieved February 19, 2025.
- 1 2 Wilson, Jack (February 19, 2025). "Trudeau announces high-speed rail line linking Montreal and Toronto in three hours". Montreal Gazette. Retrieved February 20, 2025.
- ↑ Corporate Plan Summary 2024-2025 – 2028-29 (PDF) (Report). Via HFR - TGF. p. 1. Archived (PDF) from the original on August 11, 2025. Retrieved September 3, 2025.
- ↑ 2023-24 Annual Report (PDF) (Report). Via HFR - TGF. pp. 12–13. Archived (PDF) from the original on August 11, 2025. Retrieved September 3, 2025.
- ↑ "Who's Involved". Alto. Archived from the original on August 7, 2025. Retrieved September 4, 2025.
- ↑ "Canada is getting high-speed rail". Prime Minister of Canada. Montreal. February 19, 2025. Retrieved February 20, 2025.
- ↑ Fast Forward: Shaping Canada's Future with a High-Speed Rail Network (PDF) (Report). March 2025. p. 24. Archived (PDF) from the original on January 29, 2026. Retrieved September 3, 2025.
- ↑ "High-speed rail line with 300 km/h trains will run between Toronto and Quebec City, Trudeau announces". CBC News. February 19, 2025. Retrieved February 19, 2025.
- ↑ "Liberal government considering Kingston, Ont., stop for Alto high-speed rail project". CBC News. Retrieved June 22, 2026.
- ↑ 2024-25 – 2028-29 Amended Corporate Plan Summary (PDF) (Report). Via HFR - TGF. pp. 21–26. Archived (PDF) from the original on August 11, 2025. Retrieved September 3, 2025.
- ↑ What will making the A-list mean for nation-building projects? (Podcast). CBC. September 14, 2025. Alto interview starts at 3:21.
- ↑ Shingler, Benjamin (December 12, 2025). "Ottawa-Montreal chosen as 1st segment of promised high-speed rail line". CBC. Retrieved December 12, 2025.
- ↑ Reynolds, Christopher (April 30, 2026). "Toronto area could get two high-speed rail stations — not just one — says Alto CEO". CTV News. Retrieved April 30, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ Nguyen, Khoi (January 11, 2023). "Request for Proposals Bidding Teams Announced". Alto. Archived from the original on February 20, 2025. Retrieved February 19, 2025.
- ↑ Kumari, Priyanka (July 19, 2023). "Bidding Teams – Information". Alto. Archived from the original on February 20, 2025. Retrieved February 19, 2025.
- ↑ "High Frequency Rail Project Request for Proposals". Canada.ca. Transport Canada. October 13, 2023. Retrieved February 19, 2025.
- ↑ "Responses to the High Frequency Rail Project Request for Qualifications". Canada.ca. Transport Canada. July 20, 2023. Retrieved February 19, 2025.
- ↑ Kumari, Priyanka (February 19, 2025). "Green Light for Development of a High-Speed Rail Network Between Toronto and Quebec City". Alto. Retrieved February 19, 2025.
- ↑ "Backgrounder: The High-Speed Rail Procurement Process". Canada.ca. Transport Canada. February 19, 2025. Retrieved March 29, 2025.
- 1 2 3 "Discover the Project's Features and Many Benefits". Alto. Retrieved February 19, 2025.
- ↑ The speed is calculated by dividing the Google Maps driving distance from Toronto to Ottawa and from Ottawa to Montreal (610 km (380 mi) altogether) and dividing it by Alto's estimated trip time of 3 hours and 7 minutes.
- ↑ "Northeast Corridor New York–Washington Timetable" (PDF). Amtrak. March 4, 2019. Archived from the original (PDF) on April 26, 2019. Retrieved April 26, 2019.
- ↑ The timetable gives 2 hours and 45 minutes, minimum, between Washington and New York. Dividing that into the distance traveled, 364 km (226 mi), gives an average speed of 132.3 km/h (82.2 mph).
- ↑ Taylor, Dr Colin (September 4, 2007). "World Speed Survey 2007: New lines boost rail's high speed performance". Railway Gazette International. Archived from the original on August 9, 2011. Retrieved July 6, 2023.
- ↑ Railway Gazette International 2007 World Speed Survey Tables Archived July 31, 2009, at the Wayback Machine Railway Gazette International (September 2007)
- 1 2 English, Jonathan (March 24, 2025). "Alto: A More Connected Canada Starts With High-Speed Rail". Railway-News. Retrieved March 29, 2025.
- ↑ "Alto explanatory document" (PDF). Alto. Retrieved June 7, 2026.
- ↑ David, Jones; Tasnim, Fariha (February 21, 2025). "All Aboard: The Benefits of Faster, More Frequent Passenger Trains between Ontario and Québec and The Costs of Delay". C.D. Howe Institute. Retrieved March 29, 2025.
- ↑ Trudeau, Justin (February 19, 2025). "Canada is getting high-speed rail". Prime Minister of Canada. Retrieved May 18, 2026.
- ↑ "Response from April 22, 2026 for Q-923 - Written Questions - House of Commons of Canada". www.ourcommons.ca. Retrieved June 5, 2026.
- ↑ Fang, Hanming (March 12, 2025). "Competition and Quality: Evidence from High-Speed Railways and Airlines". The Review of Economics and Statistics. 107 (2): 494–502.
- 1 2 3 "Cadence wins $3.9B High Speed Rail development contract but delivery timeline is cause for concern". Transport Action Canada. February 28, 2025. Retrieved March 31, 2025.
- 1 2 Enoch, Simon; Mertins-Kirkwood, Hadrian (February 25, 2025). "Canada's proposed high speed rail shouldn't be a public private partnership - CCPA". Canadian Centre for Policy Alternatives. Retrieved March 28, 2025.
- ↑ Noakes, Taylor C. (March 12, 2025). "Liberals' high-speed rail: a fast track to privatization ⋆ The Breach". The Breach. Retrieved March 31, 2025.
- ↑ Kurjata, Andrew (February 19, 2025). "NDP warns privatizing high-speed rail from Toronto to Quebec could kill passenger trains in rest of Canada". CBC. Retrieved March 28, 2025.
- ↑ McDonald, Tim (February 4, 2021). "Is high-speed rail travel on a track to nowhere?". BBC. Retrieved March 28, 2025.
- ↑ CJAD 800 Montreal (April 7, 2026). Alto CEO reacts to Pierre Poilievre's criticism of proposed high-speed rail project. Retrieved April 30, 2026 – via YouTube.
{{cite AV media}}: CS1 maint: numeric names: authors list (link) - ↑ Katz-Rosene, Ryan M. (April 29, 2026). "Proposed high speed rail will not make a big dent in Canada's greenhouse gas emissions". The Conversation. Retrieved May 18, 2026.
- ↑ "Field Studies: Protecting the Environment at Every Stage of the Project". Alto Train. March 20, 2026. Retrieved May 18, 2026.
- ↑ Canada, Transport Action. "Transport Action: Air Canada involvement raises concerns about High Frequency Rail procurement". Newswire. Retrieved April 30, 2026.
- ↑ "Air Canada joins the Cadence team for the HFR project". Air Canada. July 24, 2024. Retrieved May 19, 2026.
- ↑ "Speak up for wildlife: let's talk Alto high-speed rail". Wildlife Preservation Canada. March 13, 2026. Retrieved July 6, 2026.
- ↑ Major, Darren (March 31, 2026). "Poilievre says government should cancel Toronto-Quebec City high-speed rail project". Canadian Broadcasting Corporation. Archived from the original on March 31, 2026.
- ↑ Taekema, Dan (February 4, 2026). "Landowners, officials in South Frontenac fear 'devastation' from high-speed rail". Canadian Broadcasting Corporation. Retrieved May 9, 2026.
- ↑ "Field Studies: Protecting the Environment at Every Stage of the Project". Alto Train. March 20, 2026. Retrieved May 18, 2026.
External links