Alcove (Nashville)
| Alcove | |
|---|---|
![]() | |
Interactive map of the Alcove area | |
General information | |
| Status | Completed |
| Type | Residential |
| Location | 900 Church Street Nashville, Tennessee United States |
| Coordinates | 36°9′41″N 86°47′05″W / 36.16139°N 86.78472°W |
Construction started | 2021 |
| Topped-out | September 8, 2022[1] |
Completed | 2023 |
| Height | |
| Height | 419 ft (128 m) |
| Technical details | |
| Floor count | 34 |
| Floor area | 375,800 sq ft (34,910 m2) |
| Design and construction | |
Architecture firm | Goettsch Partners[2] |
| Developer | Giarratana Development, LLC[2] |
| Main contractor | AECOM Hunt[2] |
| Other information | |
| Number of units | 356 |
| Website | |
| https://alcovenashville.com/ | |
Alcove is a 419 ft (128 m), 34 story skyscraper in Nashville, Tennessee. Construction started in 2021 and finished in 2023 after originally being proposed in 2020.[3][4] It is located at the intersection of Ninth and Church Street, adjacent to the Nashville Yards district. The building contains 356 residential units and 375,800 sq ft (34,910 m2) of space.[4] Alcove's design is intended to resemble Amazon boxes stacked on top of each other, referencing the Amazon offices two blocks away.[5]
The building became noted in 2023 for being the first building in Nashville to use a Mitsubishi Electric elevator that includes touch-free calling capabilities.[6]
In October 2024, Alcove won the category of best skyscraper in the 100-199 meter category as designated by the Chicago-based Council on Tall Buildings and Urban Habitat (CTBUH). It is the first building in Nashville to be recognized by the firm in this way.[7]
On May 6, 2026, Elon Musk's Boring Company announced that they would tunnel through Church Street and add stations underneath Alcove, Prime, and the under-construction Paramount Tower for residents to use. The residents of these buildings would take an elevator from their building directly to the tunnels, which would eliminate the use of some conventional road trips. The Boring Company also states that the trip from Alcove would only be a two-minute drive from downtown, and nine minutes from the Nashville International Airport. No set completion date has been set for this project and would likely be built after phase one of the Music City Loop[8]
See also
References
- ↑ "Alcove building topped with signed beam in downtown Nashville". News Channel 5. 2022-09-08. Retrieved 2024-10-19.
- 1 2 3 "Alcove apartments". McHugh Concrete. Retrieved 2024-10-18.
- ↑ "Goettsch Partners Designs New 34-story Residential Building Adjacent to Nashville Yards". ArchDaily. 2020-04-21. Retrieved 2024-10-19.
- 1 2 "Goettsch Partners completes a "first-of-its-kind" residential tower in Nashville". Archello. 2023-08-15. Retrieved 2024-10-19.
- ↑ "Nashville gets 'first-of-its-kind' residential tower". Building Design + Construction. 2023-08-04. Retrieved 2024-10-19.
- ↑ "Downtown Nashville's newest 34-floor residential tower celebrates completion". WZTV. 2022-09-08. Retrieved 2024-10-19.
- ↑ "Giarrantana's Downtown Nashville tower wins international architecture award". The Tennessean. 2024-10-04. Retrieved 2024-10-19.
- ↑ "The Boring Company announces private Music City Loop access for downtown Nashville residents". WSMV4. 2026-05-06. Retrieved 2026-05-27.