A5 motorway (Serbia)

Autoput A 5 shield}}
Autoput A 5
Serbian: Autoput A5
Serbian Cyrillic: Аутопут А5
Route information
Part of E761
Length102.355 km[1] (63.600 mi)
12.898 km (8 mi) under construction
Major junctions
From A1 / E75 at Pojate
Major intersections 38 at Kruševac
To A2 / E763 at Preljina
Location
CountrySerbia
Major citiesKruševac, Kraljevo, Čačak
Highway system
← A4→ A1

The A5 motorway (Serbian: Аутопут А5, Autoput A5), called the Morava Corridor (Моравски коридор, Moravski koridor) is a motorway in Serbia under construction and when finished it will span for 113 kilometers (70 mi). It begins in Pojate, north of Kruševac, at the junction with A1 motorway and runs westward to Preljina near Čačak, where it intersects with the A2 motorway. There is currently a gap between Adrani and Vrba which is expected to be finished in December 2026. The construction started in December 2019 with the main contractor Bechtel.[2]

Route

The highway will mostly go through The West Morava Valley, and next to Šumadija District and Pomoravlje District on the northern side, and will connect directly the Rasina District, Raška District and Moravica District /, with combined population of about 760,000 inhabitants. There will be no tunnels, but some 78 bridges are planned on the route.

List of exits

Nr km Name Route Places Note
- 0 Pojate A1 / E75 Belgrade, Novi Sad, Subotica, Sremska Mitrovica, Kragujevac, Niš
1 3 Ćićevac 190 Ćićevac, Varvarin
2 20 Kruševac East 38 Kruševac
3 21 Kruševac West 183 Kruševac
4 28 Koševi 260 Aleksandrovac
5 36 Velika Drenova 187 Rekovac
6 47 Trstenik 260 Trstenik
7 58 Vrnjačka Banja 260 Vrnjačka Banja
8 69 Vrba 260 Kraljevo
9 75 Kamidžora 24 Kraljevo This exit is planned to be constructed
10 82 Adrani 22 Kraljevo, Mataruška Banja, Novi Pazar
11 97 Katrga 22
46
24
Knić, Kragujevac, A1 / E75 This exit is planned to be constructed in the future.
12 108 Preljina South 179 Čačak
13 109 Preljina A2 / E763 Belgrade, Valjevo, Požega, Užice, Sarajevo (Bosnia and Herzegovina), Podgorica (Montenegro)

References

  1. ↑ "Списак државних путева" [List of state roads] (PDF). ЈП "ПУТЕВИ СРБИЈЕ".
  2. ↑ "Works on Morava Corridor to begin on December 15". ekapija.com. Retrieved 10 December 2019.