A2 motorway (Tunisia)

A2 motorway
Route information
Length186 km (116 mi)
ExistedTBD–present
Major junctions
North endTunis
South endJilma
Location
CountryTunisia
Major citiesTunis, Zaghouan, El Fahs, Kairouan, Jilma
Highway system

The A2 Motorway is a major highway project currently under construction in Tunisia. Upon completion, it will connect the capital, Tunis, to Gafsa, with an additional branch extending to Kasserine.

In its initial phase, the motorway is planned to span 186 kilometers, linking Tunis to the town of Jilma, located approximately 50 kilometers northwest of Sidi Bouzid.[1] On December 6, 2022, Tunisian President Kaïs Saïed officially inaugurated the construction of this first segment.[2][3] As of April 2026, The Tunis-Jelma highway (A2) construction project has reached an overall completion rate of nearly 38%.[4] The progressive opening of this strategic route is expected by early 2027.[5]

References

  1. ↑ webmanagercenter.com; walid (2022-10-11). "Zaghouan: Les travaux de l'autoroute Tunis-Jelma peuvent désormais commencer". WMC -webmanagercenter (in French). Retrieved 2025-01-08.
  2. ↑ "Tunisie : Quatre gouvernorats concernés par l'autoroute Tunis-Jelma". Webdo TN (in French). 2022-12-07. Retrieved 2025-01-08.
  3. ↑ "Le président Saïed à Sidi Bouzid pour inaugurer les travaux de l'autoroute Tunis-Jelma". JawharaFM. Retrieved 2025-01-08.
  4. ↑ "تقدّم مشروع الطريق السيارة تونس–جلمة بنسبة %38". Radio RM FM (in Arabic). Retrieved 2026-06-02.
  5. ↑ مصباح ‭ ‬الجدي (2026-04-14). "ينتظر تدشينه السنة القادمة: مشروع الطريق السيارة تونس – جلمة يتقدم بنسبة 38 %". الصحافة اليوم - يومية اخبارية جامعة (in Arabic). Retrieved 2026-06-02.

34°14′53″N 10°02′10″E / 34.248136°N 10.036011°E / 34.248136; 10.036011