Waterbury station (Metro-North)

Waterbury
The station platform in January 2009
General information
Location333 Meadow Street
Waterbury, Connecticut
Coordinates41°33′16″N 73°02′49″W / 41.5544°N 73.0470°W / 41.5544; -73.0470
OwnerConnDOT[1]
OperatorConnDOT and Metro-North Railroad[1]
Platforms1 side platform
Tracks1
ConnectionsCT Transit Waterbury: 229, 441, 450, 925, 928[2]
Construction
Parking156 spaces[3]
AccessibleYes
Other information
Fare zone51
Passengers
2018275 daily boardings[4]
Services
Preceding station Metro-North Railroad Following station
Naugatuck
toward Bridgeport
Waterbury Branch Terminus
Location

Waterbury station is a commuter rail stop on the Waterbury Branch of the Metro-North Railroad's New Haven Line, located on Meadow Street in Waterbury, Connecticut. It is the northern terminus of the Waterbury Branch. Rail service on the line is replaced by buses from July 20, 2026, to May 31, 2027, during construction that includes a reconstruction of the Waterbury station platform.

Following its completion on March 28, 2015, improved express bus service began between Waterbury station to Hartford via the CTfastrak busway, servicing the communities of Southington and Cheshire using this partially grade-separated route.

Station layout

The current station is a large platform near the old one, a 1909 brick edifice known for its distinctive clock tower and which is the focal point of Waterbury's skyline. The old station is now the offices of the Republican-American, Waterbury's daily newspaper. The modern station has one high-level side platform to the east of the tracks long enough for one and a half train cars to receive and discharge passengers. The platform has a roof that covers it. A Metro-North siding is located just south of the station. The siding was once track one, directly adjacent to the old station. A section of the track was removed, and the parking lot built in its place. There is also a small coach yard to the west of the station.

The station is owned and operated by the Connecticut Department of Transportation, but Metro-North is responsible for maintaining platform lighting as well as trash and snow removal.[1] Parking is first-come, first-serve and operated by the city of Waterbury.[1]

In November 2021, Governor Ned Lamont indicated plans to reconstruct the five non-accessible Waterbury Branch stations.[5] By late 2024, the state also planned to replace the existing platform at Waterbury and add a waiting room in the station building. It was expected to cost $17 million for the platform and $3 million for the waiting room.[6] Construction began in October 2025; the new platform is expected to be open in September 2027, with the project fully complete in May 2028. Expected cost is $27.7 million for the platform and $11.3 million for the waiting room. The platform will be 350 feet (110 m) long with a canopy over its full length. [7][8] Buses will replace rail service from July 20, 2026, to May 31, 2027, to allow construction at the intermediate stations to take place.[9]

References

  1. 1 2 3 4 Office of Rail, Bureau of Public Transportation (January 2007). "New Haven Line Train Station Visual Inspection, Summary Report" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on March 18, 2022.
  2. ↑ "Greater Waterbury Bus System Map" (PDF). CT Transit. Retrieved April 29, 2020.
  3. ↑ Urbitran Associates Inc. (July 2003). "Task 2: Technical Memorandum parking Inventory and Utilization: Final Report" (PDF). Connecticut Department of Transportation. Table 1: New Haven Line Parking Capacity and Utilization, Page 6. Archived from the original (PDF) on September 19, 2006.
  4. ↑ Metro-North 2018 Weekday Station Boardings. Metro-North Railroad Market Analysis/Fare Policy Group. April 2019. p. 6.
  5. ↑ Falbo-Sosnovich, Jean (November 14, 2021). "Lamont Touts Infrastructure Investments". Valley Independent Sentinel. Archived from the original on January 19, 2022.
  6. ↑ "Waterbury Line High-Level Platforms and Waterbury Waiting Room Final Design" (PDF). Connecticut Department of Transportation. November 18, 2024.
  7. ↑ "Governor Lamont Announces Construction Underway To Redevelop the Waterbury Train Station" (Press release). Connecticut Office of the Governor. October 15, 2025.
  8. ↑ "Waterbury Branch Line Improvements - Waterbury Station". Connecticut Department of Transportation. Retrieved May 1, 2026.
  9. ↑ "Governor Lamont Announces Construction Underway on Four Waterbury Branch Line Station Upgrades" (Press release). Connecticut Office of the Governor. May 1, 2026.

Wikimedia Commons logo Media related to Waterbury station (Metro-North) at Wikimedia Commons