List of tunnels of the Faroe Islands

The old Árnafjarðartunnilin closed to traffic in 2024. Pictured is the former entrance, now fenced off, in Árnafjørður. Several similar tunnels remain in use.
Red: Islands of the so-called Mainland connected by road (bridge, dam or tunnel), as of December 2023. Yellow: Islands that would be connected with the Suðuroyartunnilin. Green: Islands accessible only by water or air.

Tunnels and bridges are an important part of the Faroese transportation network.[1]

Road tunnels

Locations of the tunnels

This list shows the Faroese tunnels, listed by age:[1][2]

Bridges and causeways

This list shows the longest Faroese bridges and causeways, listed by age:

BridgeYearLength
m | ft
ConnectsIsland(s)Comments
Brúgvin um Streymin1973220720Oyrarbakki/Norðskáli and NesvíkStreymoy and EysturoyConcrete bridge. Replaced the ferry crossing from Nesvík to Oyrarbakki.
Byrging um Hvannasund1975220720 Hvannasund and NorðdepilBorðoy and ViðoyCauseway. Replaced post and milk boat services.
Byrging um Haraldssund19863501,150Haraldssund and StrondBorðoy and KunoyCauseway. Replaced post and milk boat services.
Causeway between Kunoy (left) and Borðoy (right).
Brúgvin um Sandá2016140460Argir and TórshavnStreymoyThe second longest bridge in the country.[20]

Tunnels under construction

TunnelYearApprox. length
m | ft
ConnectsIslandComments

Tunnels closed to traffic

TunnelYear of openingYear of closureLength
m | ft
ConnectsIslandComments
Gamli Hvalbiartunnilin196320211,4504,760Hvalba and TrongisvágurSuðuroyFirst tunnel in the country and also the first to be replaced by a new tunnel.
Gamli Árnafjarðartunnilin196520241,6805,510Ánir, Klaksvík and ÁrnafjørðurBorðoyFirst of the two original Tunlarnir norður um Fjall (also known as Borðoyartunlarnir). Single lane with passing places, unlit.
Gamli Hvannasundstunnilin196720242,1206,960Árnafjørður and Hvannasund/NorðdepilBorðoySecond of the two original Tunlarnir norður um Fjall (also known as Borðoyartunlarnir). Single lane with passing places, unlit.
Total closed 5,25017,220

In addition, there are custom-built tunnels in Fuglafjørður used as storage space for local fishing companies. All are cul-de-sacs and closed to the public. The newest tunnels open in 2025 and measure 899 and 985 meters in length.[21]

Planned and proposed tunnels

TunnelYearApprox. length
m | ft
ConnectsIsland(s)Comments
Suðuroyartunnilin2036+24,297 or 28,14579,715 or 92,339 Sandur or Skarvanes and Sandvík Sandoy and SuðuroyThe suggested route consists of a single long tube between Djúpadalur and Sandvík, with a branch to Skúvoy (1550 metres, included in the total length). The project would take 10.1 years to construct, excluding upgrades of access roads on Sandoy and a new Sandvíkartunnilin, which will be part of the overall project.[22][23][24] Alternative routes are still being discussed.
Tjørnuvíkartunnilinunknown2,3007,500 Tjørnuvík with HaldórsvíkStreymoyTo replace the narrow cliffside road.[25] The route will be finalised in 2025 and construction would start in 2026.[26][27]
Vestmannatunnilinunknown4,200 or 6,20013,800 or 20,300 Kvívík and VestmannaStreymoyTo replace the cliffside road, prone to icing, rockslides and windgusts. The tunnel would be combined with a tunnel for powerlines from Vestmanna's hydropower station, and would start tunnelling after the Tjørnuvíkartunnilin is complete.[28] The estimated costs are between 600 and 900 million DKK.[29]
Gøtudalstunnilinunknown00 Skálafjørður or and NorðragøtaEysturoyTo offer an alternative to the Gøtueiði mountain pass in between Søldarfjørður and Syðrugøta, which is prone to icing and windgusts.[30] The original plans stated construction between 2022 and 2025, but in 2025 it was announced that detailed plans will start soon, without a precise date.[31]
Tunnilin á Vagumunknown00 Vágatunnilin and VatnsoyrarVágarA bypass for through-traffic between Sørvágur, the airport and Streymoy, bypassing Mið- and Sandavágur. Construction planned 2027 or later.[32]
Gjáartunnilinunknown00 Gjógv with FunningurEysturoyTo replace the narrow mountain pass, prone to icing in winter.[33]

Operators

Public works authority Landsverk operates the national road network, excluding the four sub-sea toll tunnels. These tunnels are each operated by its own state-owned limited company, but the four companies are brought together under a single brand and organisation, Tunnil p/F. This company administers the tolls, which charged are via number plate recognition and collected at petrol stations or car rental companies upon return of the car. Reduced fares are available for vehicles with a subscription (in Faroese: hald). A 2022 poll suggested continued support for toll charges.[34]

Tórshavn Municipality owns and operates the Sandá Bridge[35] and Húsareynstunnilin, which is formally a municipal road, though functionally part of the national highway network.[36]

See also

References

  1. 1 2 "Tunlar" (in Faroese). Tórshavn: Landsverk. Archived from the original on 2 October 2015. Retrieved 1 October 2015.
  2. ↑ "Søgulig gongd" (in Faroese). Tórshavn: Landsverk. Archived from the original on 29 December 2008. Retrieved 22 April 2011.
  3. ↑ "The Eysturoy tunnel". estunlar.fo. Retrieved 19 November 2016.
  4. ↑ "Siglir nú seinastu túrarnar um skopunarfjørð". Kringvarp Føroya. Retrieved 2023-12-21.
  5. ↑ "Loysa fyrsta flagið fyri tunlum". Kringvarp Føroya (in Faroese). Retrieved 2021-02-12.
  6. 1 2 "Gongdin fyri tunlarnar norður um Fjall". www.landsverk.fo (in Faroese). Retrieved 2021-12-22.
  7. ↑ "Síðsta skotið í Árnafjarðartunlinum". www.landsverk.fo (in Faroese). Retrieved 2023-01-22.
  8. ↑ "Boringin byrjar í næstu viku". Kringvarp Føroya (in Faroese). Retrieved 2021-09-24.
  9. ↑ "Fegnast um nýggjar tunlar". Kringvarp Føroya (in Faroese). Retrieved 2021-01-26.
  10. ↑ "Síðsta skotið latið í tunlunum norður um Fjalll". www.landsverk.fo (in Faroese). Retrieved 2023-01-22.
  11. ↑ "Fámjinstunnilin letur upp í summar". Kringvarp Føroya (in Faroese). Retrieved 2025-03-28.
  12. ↑ "Fámjinstunnilin latin upp". Kringvarp Føroya (in Faroese). Retrieved 2025-06-25.
  13. ↑ "Kanna møguleika at gera tunnil ovarliga í Havn". www.in.fo. Retrieved 2021-02-25.
  14. ↑ "Avtalan um innkomuveg og tunnil undirskrivað". Tórshavnar kommuna (in Faroese). 2022-12-21. Retrieved 2022-12-23.
  15. ↑ "Húsareynstunnilin skotin ígjøgnum í næsta mánaði". Dagur.fo (in Faroese). 2024-02-06. Retrieved 2024-02-06.
  16. ↑ "Havnarvegur letur upp fyri ferðslu 6. juli". Kringvarp Føroya (in Faroese). Retrieved 2025-06-25.
  17. ↑ "Lata fyrsta skotið av". dagur.fo (in Faroese). Retrieved 2020-11-05.
  18. ↑ "Dalstunnilin skotin ígjøgnum í november". Kringvarp Føroya. Retrieved 2023-10-08.
  19. ↑ "Dalstunnilin – helvtin borað". www.landsverk.fo (in Faroese). Retrieved 2022-12-23.
  20. ↑ "Brúgvin um Sandá – J&K Contractors".
  21. ↑ "Tveir nýggir tunlar skjótt lidnir í Fuglafirði". dagur.fo (in Faroese). Retrieved 2025-04-13.
  22. ↑ "Suðuroy subsea tunnel research shows early promise". Kringvarp Føroya (in Faroese). 26 November 2018.
  23. ↑ "Minister: Suðuroy tunnel ready in 2030". Kringvarp Føroya (in Faroese). 5 February 2020.
  24. ↑ "Semja millum politiskar flokkar um linjuføring". www.lms.fo (in Faroese). Retrieved 2025-10-28.
  25. ↑ Landsverk. "Borgarafundur í Tjørnuvík um Tjørnuvíkartunnil (Citizen consultation meeting in Tjørnuvík about Tjørnuvíkartunnilin)". Landsverk. Retrieved 2024-01-29.
  26. ↑ "Fara undir Tjørnuvíkartunnilin næsta ár". dagur.fo (in Faroese). Retrieved 2024-03-07.
  27. ↑ "Fundur um komandi vestmannatunnilin mánakvøldið". dagur.fo (in Faroese). Retrieved 2025-08-18.
  28. ↑ "Fundur um komandi vestmannatunnilin mánakvøldið". dagur.fo (in Faroese). Retrieved 2025-08-18.
  29. ↑ "Berghol til Vestmanna kostar millum 600 og 900 milliónir". www.kvf.fo (in Faroese).
  30. ↑ "Gøtudalstunnil".
  31. ↑ "Projekteringin byrjar næsta ár". Kringvarp Føroya (in Faroese). Retrieved 2025-03-28.
  32. ↑ "Farið verður undir tunnilin til Vestmanna í 2022".
  33. ↑ "Samferðsluætlanin 2018-2030".
  34. ↑ "Poll: tunnel toll charge should continue". Kringvarp Føroya (in Faroese). 7 May 2022.
  35. ↑ "Brúgvin um Sandá".
  36. ↑ Tórshavn Municipality (3 June 2021). "Endiliga er avtalan um innkomuvegin undirskrivad". Tórshavn Municipality. Retrieved 13 April 2025.