South Bank station (Pittsburgh)

South Bank
South Bank station light rail platforms, April 2017
General information
LocationSaw Mill Run Boulevard and Midwood Avenue
Pittsburgh, Pennsylvania
Coordinates40°23′35″N 79°59′54″W / 40.3930°N 79.9983°W / 40.3930; -79.9983
OwnerPittsburgh Regional Transit
LinesOverbrook Line
South Busway
Platforms2 side platforms (light rail)
2 side platforms (busway)
Tracks2
Bus routesBus transport PRT:  Y1   Y45   Y46   Y47   Y49 
Construction
Structure type
At-grade
AccessibleYes
History
OpenedDecember 1977 (1977-12)
Rebuilt2004[1]
Passengers
2018141[2] (weekday boardings)
Services
Preceding station Pittsburgh Regional Transit Following station
Denise
toward Allegheny
Blue Line McNeilly
Silver Line McNeilly
toward Library
Whited South Busway Central
toward Glenbury
Former services
Preceding station Port Authority of Allegheny County Following station
Ansonia
toward Gateway
47D Drake
1984–1993
Central
toward Drake
47L Library
via Overbrook
Central
toward Library
47S South Hills Village
via Overbrook
Central
Location

South Bank station is an at-grade combined light rail and busway station operated by Pittsburgh Regional Transit in the Overbrook neighborhood of Pittsburgh, Pennsylvania. The station is located on an exclusive right-of-way shared by the Blue and Silver lines of the Pittsburgh Light Rail system, as well as South Busway routes Y1, Y45, Y46, Y47, and Y49. Separate platforms are provided for light rail vehicles and busway buses.

The light rail side of the station has two high-level side platforms for level boarding and is accessible.

The station is a major transit facility, but also designed to serve the crowded and mostly residential community that surrounds the site.

History

South Bank station busway platforms, September 2016

South Bank was opened in 1977, as a stop on the then-new South Busway, which served as the final connection point to the Overbrook line before reaching South Hills Junction, since the streetcar line left the busway at this point and crossed Route 51. In 1993, the Overbrook line was suspended, and the stop became a bus-only stop. Rail service returned when the Overbrook line was rebuilt in 2004, and was the only stop on the once shared portion of the busway to return as a rail-busway connection point.

References

  1. ↑ Grata, Joe (June 2, 2004). "Overbrook Rail Service Throttles Up". Pittsburgh Press-Gazette. pp. A9, A12. Retrieved May 6, 2024 – via Newspapers.com. Open access icon
  2. ↑ "System Map Winter 2018". Port Authority.