South Bank station (Pittsburgh)
South Bank | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() South Bank station light rail platforms, April 2017 | |||||||||||||||||||||
| General information | |||||||||||||||||||||
| Location | Saw Mill Run Boulevard and Midwood Avenue Pittsburgh, Pennsylvania | ||||||||||||||||||||
| Coordinates | 40°23′35″N 79°59′54″W / 40.3930°N 79.9983°W | ||||||||||||||||||||
| Owner | Pittsburgh Regional Transit | ||||||||||||||||||||
| Lines | Overbrook Line South Busway | ||||||||||||||||||||
| Platforms | 2 side platforms (light rail) 2 side platforms (busway) | ||||||||||||||||||||
| Tracks | 2 | ||||||||||||||||||||
| Bus routes | |||||||||||||||||||||
| Construction | |||||||||||||||||||||
Structure type | At-grade | ||||||||||||||||||||
| Accessible | Yes | ||||||||||||||||||||
| History | |||||||||||||||||||||
| Opened | December 1977 | ||||||||||||||||||||
| Rebuilt | 2004[1] | ||||||||||||||||||||
| Passengers | |||||||||||||||||||||
| 2018 | 141[2] (weekday boardings) | ||||||||||||||||||||
| Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
South Bank station is an at-grade combined light rail and busway station operated by Pittsburgh Regional Transit in the Overbrook neighborhood of Pittsburgh, Pennsylvania. The station is located on an exclusive right-of-way shared by the Blue and Silver lines of the Pittsburgh Light Rail system, as well as South Busway routes Y1, Y45, Y46, Y47, and Y49. Separate platforms are provided for light rail vehicles and busway buses.
The light rail side of the station has two high-level side platforms for level boarding and is accessible.
The station is a major transit facility, but also designed to serve the crowded and mostly residential community that surrounds the site.
History
.jpg)
South Bank was opened in 1977, as a stop on the then-new South Busway, which served as the final connection point to the Overbrook line before reaching South Hills Junction, since the streetcar line left the busway at this point and crossed Route 51. In 1993, the Overbrook line was suspended, and the stop became a bus-only stop. Rail service returned when the Overbrook line was rebuilt in 2004, and was the only stop on the once shared portion of the busway to return as a rail-busway connection point.
References
- ↑ Grata, Joe (June 2, 2004). "Overbrook Rail Service Throttles Up". Pittsburgh Press-Gazette. pp. A9, A12. Retrieved May 6, 2024 – via Newspapers.com.

- ↑ "System Map Winter 2018". Port Authority.
External links
