Signia by Hilton Indianapolis
| Signia by Hilton Indianapolis | |
|---|---|
![]() The Signia by Hilton Indianapolis nearing completion in 2026 | |
Interactive map of the Signia by Hilton Indianapolis area | |
General information | |
| Status | Under construction |
| Type | Hotel |
| Location | 101 W. Georgia St. Indianapolis, Indiana, U.S. |
| Coordinates | 39°45′50″N 86°9′38″W / 39.76389°N 86.16056°W |
| Topped-out | October 9, 2025 |
| Cost | US$510 million |
| Owner | Capital Improvement Board of Managers of Marion County, Indiana |
| Operator | Hilton Hotels & Resorts |
| Height | |
| Height | 441 ft (134 m) |
| Technical details | |
| Floor count | 38 |
| Design and construction | |
Architecture firm | Ratio Architects, Inc. |
| Developer | Kite Realty Group Trust |
| Website | |
| www | |
Signia by Hilton Indianapolis is an under-construction hotel located in Indianapolis, Indiana. The building is set to be completed by 2026.[1] Planned to be over 440 feet tall, upon completion it will be the fourth tallest building in Indianapolis and the tallest hotel building in the state of Indiana.[2]
Design
The structure of the hotel will be 38 stories and 441 ft (134 m) tall with 800 hotel rooms.[3][4][5] The hotel will contain a Sky Lounge and a Mezzanine center within the top two floors, alongside a 50,000 ft2 (4,600 m2) ballroom, a spa, and meeting space on the third floor.[6] Access to the Indiana Convention Center and Lucas Oil Stadium will be provided via a skywalk from the hotel.[7]
Timeline
Construction of a hotel in the area was first proposed in 2018, with plans for design being led by Indianapolis-based firm Ratio Architects and construction being led by Kite Realty Group Trust.[8] The construction of Signia was part of a larger redevelopment of the Indianapolis Pan Am Plaza and Convention Center, with the construction of the hotel initially expected to cost around $510 million.[9] Among the stated goals of the hotel was the need to reduce overcrowding in existing hotels and to accommodate additional convention traffic in Indianapolis.[6]
In May 2023, funding of the building was assumed by the Indianapolis city government after Kite Realty was unable to gain sufficient funding for the building.[10] A groundbreaking ceremony was held in August 2023.[11] Construction began in June 2024 with the pouring of nearly 1,500,000 US gal (5,700,000 L; 1,200,000 imp gal) of concrete over a 12-hour period as part of the creation of the hotel's foundation, making it the largest concrete pour in Indianapolis history. The pour involved a convoy of around 100 trucks and about 800 truckloads worth of concrete.[12] The building topped out in October 2025.[7] A second hotel at Pan Am Plaza is expected to be constructed following the completion of Signia.[5]
See also
References
- ↑ Runevitch, Jennie. "Signia by Hilton hotel halfway complete in downtown Indianapolis". WTHR. Retrieved 23 May 2026.
- ↑ Shuey, Mickey. "Signia, convention center expansion clear early design hurdle". Indianapolis Business Journal. Retrieved 23 May 2026.
- ↑ Simmons, Taj. "Signia Hotel construction is towering over downtown Indy". WRTV. Retrieved 23 May 2026.
- ↑ Simmons, Taj. "38-story Signia Hotel construction ahead of schedule thanks to mild weather". WRTV. Retrieved 23 May 2026.
- 1 2 Shuey, Mickey. "Most hotels planned for downtown still in works, but progress slow". Indianapolis Business Journal. Retrieved 23 May 2026.
- 1 2 Mack, Justin. "Downtown's Signia by Hilton stays ahead of schedule". Axios. Retrieved 23 May 2026.
- 1 2 "Signia by Hilton Indianapolis Tops Off". Lodging Magazine. Retrieved 23 May 2026.
- ↑ Shuey, Mickey. "Ratio principal Bill Browne talks Pan Am Plaza project". Indianapolis Business Journal. Retrieved 23 May 2026.
- ↑ White, Jacqueline. "City of Indianapolis to take over financing of Hilton Signia Hotel". WRTV. Retrieved 23 May 2026.
- ↑ Mack, Justin. "Indy's Signia hotel, convention center expansion reach new heights". Axios. Retrieved 23 May 2026.
- ↑ "Groundbreaking held for project that will reshape the Indianapolis skyline". WTHR. Retrieved 23 May 2026.
- ↑ Shuey, Mickey. "Record-setting Signia hotel concrete pour sets stage for construction". Inside Indiana Business. Retrieved 23 May 2026.