Siddhababa Tunnel

Siddhababa Tunnel
Overview
LocationLumbini Province, Nepal
StatusUnder construction
RouteC2 NH 47
Operation
Work beganDecember 2023
TrafficAutomotive
Technical
Length1.126 kilometres (0.700 mi)
No. of lanesTwo (one in each direction)

Siddhababa Tunnel (Nepali: सिद्धबाबा सुरुङ) is a highway tunnel, currently under-construction, along the Butwal-Palpa section of the Siddhartha Highway in Nepal.[1] The total length of the tunnel is 1,126 m (3,694 ft). The tunnel features double lanes, an 8.5 m (28 ft) width, and sidewalks to facilitate pedestrian safety.

Construction project

The project is being completed by China State Construction Engineering Corporation for around NPR 7.34 billion.[2] The project is scheduled to be finished by March 2027.[3] The initial cost estimate of the project is about NPR 10 billion.

See also

References

  1. ↑ "Preparatory work for Rs7.34 billion Siddhababa tunnel project begins". The Kathmandu Post.
  2. ↑ "Siddhababa Tunnel 65% complete, progress on track". My republica.
  3. ↑ "Siddhababa Tunnel pushes for November trial despite slow progress". My republica. 28 July 2026.