Saraburi Gas Turbine

The term Saraburi Gas Turbine Power Plant is commonly used to describe major gas-fired combined-cycle power stations located in Saraburi Province, Thailand, notably Kaeng Khoi 2 (≈1,468 MW) and Nong Saeng (≈1,600 MW). Both facilities operate as independent power producer (IPP) projects under long-term power purchase agreements with the Electricity Generating Authority of Thailand (EGAT) and supply the Central Region grid.[1][2]

Location

Both plants are in Saraburi Province (central Thailand). Kaeng Khoi 2 is sited in Ban Pa/Kaeng Khoi area; Nong Saeng is in Nong Kop/Nong Saeng area.[1][3]

Capacity and Technology

Kaeng Khoi 2: two blocks of 734 MW each (≈1,468 MW total), gas-fired combined cycle (CCGT). Commercial operation dates: May 2007 (Block 1) and March 2008 (Block 2).[1][4]

Nong Saeng: 1,600 MW (800 MW × 2) CCGT, with units scheduled to enter service June 2014 and December 2014 per EPC notices; project financing documentation confirms 1,600 MW and a 25-year PPA with EGAT.[3][5][6]

Owner and Operator

Kaeng Khoi 2 is developed and operated by Gulf Power Generation Company Limited (GPG) under a Build-Own-Operate scheme; J-POWER reports a 49% investment share in the project company and confirms the 25-year PPA with EGAT.[1]

Nong Saeng is developed by Gulf JP NS Co., Ltd. (GNS) with international co-financing; JBIC's project finance release confirms the sponsor structure and PPA with EGAT.[5][3]

Operations

The plant operates under Thailand's Independent Power Producer (IPP) framework:

Fuel: primary natural gas; dual-fuel capability (e.g., distillate) is available for reliability.[1][7]

Grid offtake: electricity is sold to EGAT under long-term PPAs (25 years cited for Kaeng Khoi 2 and Nong Saeng).[1][5]

Performance upgrades (Saraburi gas turbines): case studies report gas-turbine inlet-air cooling retrofits on two GE 6561B turbines in Saraburi, adding ≈4.3 MW per unit (≈8.6 MW total) during high-temperature conditions.[8]

Finances

Kaeng Khoi 2: Total project cost ~ 36.1 billion Baht (≈108.1 billion yen).[1]

Nong Saeng: Project financing up to US$1.184 billion arranged by JBIC alongside co-financing; EPC by Mitsubishi Heavy Industries for two 800 MW trains with scheduled CODs in 2014.[5][3][6]

Environmental and “Green Energy” aspects

While gas-fired CCGT plants are fossil-fuel facilities, higher thermal efficiency means lower CO₂ intensity per MWh compared with older thermal units. Thailand-focused studies (JCM/Ministry of the Environment, Japan) describe inlet-air cooling/chiller retrofits as efficiency measures that can increase net output and reduce emissions per kWh.[9][8]

Kaeng Khoi 2 (≈1,468 MW CCGT).[1]

Nong Saeng (≈1,600 MW CCGT).[5][10]

Nong Khae (NK2) SPP (≈133 MW gas-fired SPP in Saraburi; distinct from the above IPPs).[11]

See also

Energy in Thailand

Electricity Generating Authority of Thailand

Energy Regulatory Commission (Thailand)

List of power stations in Thailand

References

  1. 1 2 3 4 5 6 7 8 "Operational launch of the Block 1 of the Kaeng Khoi #2 Power Station in Thailand" (PDF). J-POWER. 7 May 2007. Retrieved 23 October 2025.
  2. ↑ "Project Financing for Nong Saeng Natural Gas-Fired Combined Cycle Power Plant in Thailand". Japan Bank for International Cooperation (JBIC). 7 November 2011. Retrieved 23 October 2025.
  3. 1 2 3 4 "MHI Receives Full-turnkey Order for 1,600 MW GTCC Power Plant from Gulf JP NS". Mitsubishi Heavy Industries. 13 December 2011. Retrieved 23 October 2025.
  4. ↑ "Operational launch of the Block 2 of the Kaeng Khoi #2 Power Station in Thailand" (PDF). J-POWER. 3 March 2008. Retrieved 23 October 2025.
  5. 1 2 3 4 5 "Project Financing for Nong Saeng Natural Gas-Fired Combined Cycle Power Plant in Thailand". JBIC. 7 November 2011. Retrieved 23 October 2025.
  6. 1 2 "Extended Annual Review Report: Nong Saeng Power Project" (PDF). Asian Development Bank. 2016. Retrieved 23 October 2025.
  7. ↑ "MHI Receives Full-turnkey Order for 1,600 MW GTCC Power Plant". Mitsubishi Heavy Industries. 13 December 2011. Retrieved 23 October 2025.
  8. 1 2 "Two GE 6561B Gas Turbines Achieve 8.6 MW Boost—Saraburi, Thailand". MeeFog. 19 June 2024. Retrieved 23 October 2025.
  9. ↑ "Feasibility Study of Large-Scale CO₂ Reduction by JCM—Application of Inlet Air Cooling to Gas Turbine Combined Cycle in Thailand" (PDF). Ministry of the Environment, Government of Japan. 2016. Retrieved 23 October 2025.
  10. ↑ "MHI Receives Full-turnkey Order for 1,600 MW GTCC Power Plant from Gulf JP NS". MHI. 13 December 2011. Retrieved 23 October 2025.
  11. ↑ "Gulf NK2 power station (โรงไฟฟ้าหนองแค 2)". Global Energy Monitor. 2025. Retrieved 23 October 2025.

"Operational launch of Kaeng Khoi #2 (Block 1)" (PDF). J-POWER. 7 May 2007. Retrieved 23 October 2025.

"Operational launch of Kaeng Khoi #2 (Block 2)" (PDF). J-POWER. 3 March 2008. Retrieved 23 October 2025.

"JBIC Project Financing—Nong Saeng 1,600 MW CCGT". JBIC. 7 November 2011. Retrieved 23 October 2025.

"MHI EPC announcement—Nong Saeng GTCC (800 MW × 2)". Mitsubishi Heavy Industries. 13 December 2011. Retrieved 23 October 2025.

"ADB Extended Annual Review Report—Nong Saeng" (PDF). ADB. 2016. Retrieved 23 October 2025.

"Gas-turbine inlet cooling study—Thailand context" (PDF). Ministry of the Environment (Japan). 2016. Retrieved 23 October 2025.