RECIP IV Power Station
| RECIP IV Power Station | |
|---|---|
![]() | |
| Country |
|
| Location | Oranjestad, Aruba |
| Coordinates | 12°28′33.4″N 69°58′56.1″W / 12.475944°N 69.982250°W |
| Status | Operational |
| Construction began | 2020 |
| Commission date | June 2022 |
| Owner | Water – En Energiebedrijf Aruba N.V. |
| Thermal power station | |
| Primary fuel | Diesel fuel |
| Power generation | |
| Units operational | 6 |
| Nameplate capacity | 102 MW |
| External links | |
| Commons | Related media on Commons |
The RECIP IV Power Station is a diesel fuel power station in Oranjestad, Aruba.
History
In December 2018, the contract to construct the power station was awarded to Wärtsilä.[1] The construction of the power station started in 2020.[2] The power station was then commissioned in June 2022.[3]
Technical specifications
The power station has six generating units with a total installed generation capacity of 102 MW.[3]
See also
References
- ↑ "Wärtsilä Smart Power Generation plant to support Aruba's move to renewable energy". Wärtsilä. 21 December 2018. Retrieved 20 December 2023.
- ↑ "Overall emissions reduced with new 102 MW electrical plant". Croon Caribe. 2 October 2020. Retrieved 20 December 2023.
- 1 2 "Energy Production History". WEB N.V. Retrieved 20 December 2023.
Wikimedia Commons has media related to RECIP IV Power Station.
.jpg)