Puebla–Cholula Tourist Train

Puebla–Cholula Tourist Train
Puebla-Cholula Tourist Train at Cholula station
Overview
Service typeTram-train
StatusDiscontinued
LocalePuebla
First service23 January 2017 (2017-01-23)
Last service31 December 2021 (2021-12-31)
Former operatorGovernment of the State of Puebla
Ridership161,377 (2019)[1]
Route
TerminiPuebla
Cholula
Stops2
Distance travelled17.4
Average journey time40 minutes
Technical
Rolling stockStadler Citylink
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Operating speed30
Route map

The Puebla–Cholula Tourist Train (Spanish: Tren turístico Puebla–Cholula) was a diesel tram-train service that connected the city centre of Puebla with the tourist zone in Cholula in the Mexican state of Puebla. Operation began in January 2017 and ended in December 2021.

History

The project was announced in July 2015 by Puebla State Governor Rafael Moreno Valle Rosas.[2] Construction began in November 2015 and was completed in early 2017 when it was inaugurated by President Enrique Peña Nieto and Governor Moreno Valle.[3] Initially budgeted to cost 800 million pesos, final project costs totaled 1,113 million pesos.[4]

Route

The 17.4 km (10.8 mi) single-track route largely utilized existing rail rights-of-way to the north and west of the city of Puebla. The route began at the National Railway Museum in Puebla's city centre. The first 2 km (1.2 mi) of the route operated as a tram line without any stops along city streets with mixed vehicle traffic. The remainder of the route utilized a dedicated at-grade right-of-way from Puebla to Cholula Station adjacent to the Cholula Archaeological Zone. An additional two intermediate stops, Mercado Hidalgo Station and Momoxpan Station, were constructed but have not been opened.[4]

Operations

The Puebla-Cholula Tourist Train's rolling stock consisted of two three-car diesel-electric 38 m (125 ft)-long trains supplied by Vossloh.[5] The trains have a capacity of 284 people.[3] Average train speed was 30 km/h and the approximate travel time between Puebla and Cholula was 40 minutes. There were three daily departures from each terminal on weekdays and nine daily departures from each terminal on weekends and holidays.[6]

Operations ended on December 31, 2021 due to a lack of profitability.[7] The rolling stock was transferred to Tren Interoceánico in the states of Veracruz and Oaxaca.[8]

References

  1. ↑ "Pulso del Sector Ferroviario Mexicano - Diciembre 2019" [Pulse of the Mexican Railway Sector - December 2019]. Gobierno de México (in Spanish). Agencia Reguladora del Transporte Ferroviario. February 5, 2020. Retrieved September 26, 2020.
  2. ↑ Martell, Mario (11 September 2015). "Gobierno estatal quiere adjudicar de manera directa el tren Puebla-Cholula". Intolerancia. Retrieved 26 September 2020.
  3. 1 2 "Puebla tram-train inaugurated". Metro Report International. DVV Media International. 25 January 2017. Archived from the original on 9 August 2020. Retrieved 11 December 2017.
  4. 1 2 de Jesús López, Esteban (1 August 2018). "A un año de su operación, estaciones intermedias del millonario Tren Turístico Puebla-Cholula ¡no funcionan!". Periodico Central. Retrieved 26 September 2020.
  5. ↑ "Diesel tram-trains for Puebla". Metro Report International. DVV Media International. 2 December 2015. Archived from the original on 16 August 2020. Retrieved 26 September 2020.
  6. ↑ "Horarios". Tren turístico Puebla-Cholula. Gobierno de Puebla. Archived from the original on January 7, 2019. Retrieved September 26, 2020.
  7. ↑ "Puebla tram-train ceases operation". Railway Gazette International. Metro Report International. January 11, 2022. Archived from the original on July 22, 2025. Retrieved January 11, 2022.
  8. ↑ "De Puebla para el Istmo: así será el tren de pasajeros del Corredor Interoceánico" [From Puebla to the Isthmus: this is what the passenger train of the Interoceanic Corridor will be like] (in Spanish). Radio Fórmula. September 11, 2023. Archived from the original on September 20, 2023. Retrieved January 24, 2024.