Ninh Thuận 1 Nuclear Power Plant

Ninh Thuận 1 Nuclear Power Plant
CountryVietnam
LocationPhước Dinh in Thuận Nam District, Khánh Hòa province
Coordinates11°24′48″N 108°58′29″E / 11.41333°N 108.97472°E / 11.41333; 108.97472
StatusProposed
Construction began2027 or 2028 (planned)
OwnerVietnam Electricity
OperatorEVNNPB
Nuclear power station
Reactor typeVVER-1200
Reactor supplierAtomstroyexport
Power generation
Units planned2 x 1,200 MWe
Nameplate capacity2,400 MW

The Ninh Thuận 1 Nuclear Power Plant is a planned nuclear power plant at Phước Dinh in Thuận Nam District, Khánh Hòa province, Vietnam. Plans for it were cancelled in 2016.[1] It will consisted of two 1,200 MWe VVER pressurised water reactors. The plant was to be built by Atomstroyexport, a subsidiary of Rosatom, and to be owned and operated by state-owned electricity company Vietnam Electricity. Fuel will be supplied and used fuel will be reprocessed by Rosatom.[2] The feasibility study was to be carried out by E4 Group.[3]

The plant would have been built based on a nuclear power development plan, approved by the Vietnamese government in 2007. In 2009, Vietnam's National Assembly approved a resolution on investment policy for the project.[4] On 31 October 2010, Vietnamese government and Rosatom signed a construction agreement.[2]

Works to prepare the construction site started in December 2011.[5] Construction was to start by 2014 and the first unit to be commissioned by 2020.[2] However, in 2014, the Prime Minister Nguyễn Tấn Dũng announced that the construction would be postponed until 2020 to ensure the highest degree of safety.[6] The construction was supposedly financed by the US$8 billion loan from Russia.[7] In 2024, the National Assembly of Vietnam approved the resumption of the nuclear power program in Ninh Thuận, largely as continuation of the frozen project.[8]

In early 2026, Vietnam and Russia formally inked agreement for two VVER-1200 reactors for Ninh Thuận 1, with Leningrad NPP 2 to become the reference project.[9][10]

See also

References

  1. ↑ "Vietnam abandons plan for first nuclear power plants". Reuters. 2016-11-22. Retrieved 2019-12-04.
  2. 1 2 3 "Russia to build nuclear plant in Vietnam". World Nuclear News. 2010-11-01. Retrieved 2011-12-03.
  3. ↑ "Vietnam signs up Japan for Ninh Thuan 2". Nuclear Engineering International. 2010-11-03. Archived from the original on 2012-06-07. Retrieved 2011-12-03.
  4. ↑ "Russia to build nuclear plant in Vietnam". World Nuclear News. 2009-11-25. Archived from the original on 2014-12-06. Retrieved 2011-12-03.
  5. ↑ "Russian specialists embark on construction of Vietnamese nuke plant". RIA Novosti. 2011-12-02. Retrieved 2011-12-03.
  6. ↑ "Vietnam delays building 1st nuclear power plant". Associated Press. 2014-01-15. Retrieved 2015-06-04.
  7. ↑ "Russia to grant $8 bln loan to Vietnam to build first nuke plant". RIA Novosti. 2011-11-23. Retrieved 2011-12-03.
  8. ↑ "Việt Nam resumes nuclear power project amid rising energy demands". Việt Nam News. Vietnam News Agency. Retrieved 2026-03-28.
  9. ↑ "Russia to build 2,400 MW nuclear plant in Vietnam under new deal". Thời báo Tài chính Việt Nam. Retrieved 2026-03-24.
  10. ↑ An, Trần Lê (2026-03-24). "Vietnam and Russia officially commit to nuclear power development". Ministry of Industry and Trade (Vietnam). Retrieved 2026-03-28.