Nachtigal Hydroelectric Power Station

Natchigal Dam
Natchigal Dam is located in Cameroon
Natchigal Dam
Natchigal Dam
Location of Natchtigal Power Station
LocationNatchtigal, Cameroon
Coordinates04°21′03″N 11°38′00″E / 4.35083°N 11.63333°E / 4.35083; 11.63333
Construction began2018
Opening dateFrom 10 May 2024 until 18 March 2025
Construction cost€1.2 billion
OwnerNachtigal Hydro Power Company
Dam and spillways
Type of damRCC Gravity dam
ImpoundsSanaga River
Height14 m (46 ft)
Length2,000 m (6,600 ft)
Reservoir
Total capacity27.9×106 m3 (9.9×108 cu ft)
Surface area4.21 km2 (1.63 sq mi)
Power Station
OperatorNachtigal Hydro Power Company
Commission dateJuly 2024 Expected
Turbines7 x GE Francis 60 MW
Installed capacity420 MW (560,000 hp)
Annual generation3,000 GWh (11,000 TJ)

The Nachtigal Hydroelectric Power Station is a 420 megawatt run-of-the-river hydroelectric power station under development in Cameroon across the Sanaga River, which harnesses the energy of the Nachtigal Falls. The development rights were granted to Nachtigal Hydro Power Company (NHPC), a company owned by a consortium comprising (a) Électricité de France (b) International Finance Corporation and (c) the Government of Cameroon. A 35-year power purchase agreement is in place, between Eneo Cameroon S.A. and NHPC.[1]

Location

The dam lies across the Sanaga River, about 65 kilometres (40 mi) north-east of Yaoundé, the capital city of Cameroon.[2]

Overview

Nachtigal Falls in 1973

The design calls for a gravity dam with a power potential of 420 megawatts, powered by seven turbines, each with a capacity of 60 megawatts. The roller-compacted concrete (RCC) dam will create a reservoir with a surface area of 4.21 square kilometres (1,040 acres), capable of storing 2.78 million m³ of water.[1]

As part of this project, NHPC the concessionaire, will construct a double circuit 225 kilovolt high voltage transmission line measuring 50.3 kilometres (31 mi) in length, that will transmit the generated power to a substation where it will be integrated into the national electricity grid. Once the high voltage transmission line is constructed and operational, ownership, operation and maintenance will transfer to National Electricity Transmission Company (Sonatrel).[1]

Ownership

The power station is owned by the special purpose company named Nachtigal Hydro Power Company (NHPC). The table below illustrates the shareholding in NHPC. In 2019, two more shareholders joined the original three. Africa50, a subsidiary of the African Development Bank, took a 15 percent shareholding in NHPC. Stoa Infra & Energy from France also acquired a 10 percent shareholding in the project.[3]

Shareholding In Nachtigal Hydro Power Company
RankShareholderDomicilePercentageNotes
1Électricité de FranceFrance
40.00
[1][3]
2International Finance CorporationUnited States
20.00
[1][3]
3Government of CameroonCameroon
15.00
[1][3]
4Africa50Ivory Coast
15.00
[1][3]
5Stoa Infra & EnergyFrance
10.00
[1][3]
Total
100.0

Construction costs

The estimated costs for the dam and power plant was €1.2 billion in 2018. Approximately €300 million (25 percent) was raised internally by the NHPC consortium as equity investment. The remaining amount, about €900 million, was borrowed from the eleven international financiers and four Cameroonian banks. Some of the lenders to this project include the following:[1][4]

Timeline and commissioning

In December 2021, Afrik21 reported that the first 60 megawatt turbine was expected to be commissioned in July 2023. The final and seventh of equally rated turbines is expected to come online in July 2024.[5]

On 10 May 2024, the first turbine started supplying 60 MW to the grid. The remaining six turbines are expected to come online at a rate of approximately one per month until the seventh turbine scheduled for activation in December 2024.[6] The last turbine was brought online on 18 March 2025.[7][8]

See also

References

  1. 1 2 3 4 5 6 7 8 9 NS Energy (2018). "Nachtigal Hydro Power Plant". United Kingdom: NS Energy Business. Retrieved 5 June 2021.
  2. ↑ "Nachtigal Hydropower Project".
  3. 1 2 3 4 5 6 Boris Ngounou (6 December 2018). "Cameroon: Nachtigal Hydropower Company's capital passes from 3 to 5 shareholders". Paris, France: Afrik21.africa. Retrieved 5 June 2021.
  4. ↑ Boris Ngounou (9 November 2018). "Cameroon: Funding for Nachtigal hydroelectric power plant (420 MW) complete". Paris, France: Afrik21.africa. Retrieved 5 June 2021.
  5. ↑ Benoit-Ivan Wansi (22 December 2021). "Cameroon: Nachtigal hydroelectric dam to come on stream mid-2024". Afrik21.africa. Paris, France. Retrieved 28 December 2021.
  6. ↑ Jean Marie Takouleu (14 May 2024). "Nachtigal Dam Injects Its First MW Into Cameroon's Power Grid". Afrik21.africa. Paris, France. Retrieved 14 May 2024.
  7. ↑ Yannick Kenné (10 October 2025). "Cameroon inaugurates controversial dam despite local dissent". Mongabay News. Menlo Park, California. Retrieved 2 July 2026.
  8. ↑ Ludovic Amara (7 June 2026). "Cameroon's Nachtigal plant tops 3.6 TWh output, but outages persist". Business in Cameroon. Yaoundé, Cameroon. Retrieved 2 July 2026.