Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
| North Ring Road — Guangtong Road |
30 October 2018 |
13.3 km (8.26 mi)[1] |
12 |
Phase 1 |
Service routes
- North Ring Road — Guangtong Road
Stations
| Station name |
Connections |
Distance km |
Location |
| English |
Chinese |
|
| North Ring Road |
北环城路 |
1 |
0.00 |
0.00 |
Kuancheng |
| No.123 Middle School |
一二三中学 |
|
1.23 |
1.23 |
| Xiaonan |
小南 |
|
1.11 |
2.34 |
| Xiaochengzi Street |
小城子街 |
|
0.66 |
3.00 |
| North Lake Bridge |
北湖大桥 |
|
2.37 |
5.37 |
| North Lake Park |
北湖公园 |
|
0.95 |
6.32 |
| He'an Street |
和安街 |
|
0.77 |
7.09 |
| Guangji Road |
光机路 |
|
1.46 |
8.55 |
| Daxuecheng Road |
大学城路 |
|
1.00 |
9.55 |
| Institute of Geography |
地理所 |
|
1.33 |
10.88 |
| Olympic Park |
奥林匹克公园 |
|
1.07 |
11.95 |
| Guangtong Road |
广通路 |
|
1.25 |
13.20 |
|
References
Public transportation in Jilin (JL) |
|---|
Changchun Rail Transit | | Lines in operation | |
|---|
| Under construction |
- 3 (South extension)
- 5
- 9 (Airport line)
- 1 (South extension)
|
|---|
|
|---|
Trams in Changchun | |
|---|
CR C-train | |
|---|
CR intercity railways | |
|---|
| Transportation hubs | Int'l airports | |
|---|
Railway stations | |
|---|
|
|---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|