Line 2 (Coimbatore Metro)

Green Line
Overview
StatusProposed
Termini
Stations14
Service
TypeRapid transit
SystemCoimbatore Metro
Technical
Number of tracks2
Character14.4 km Elevated
Operating speed80 km/h (50 mph)
Route map

Valiyampalayam Pirivu
VGP Nagar
Viswasapuram
Saravanampatti
Chitra Nagar
Vinayagapuram
Ramakrishna Mills
Athipalayam
Ganapathy Pudur
Moor Market
Coimbatore Omni Bus Stand Bus interchange
Gandhipuram Bus Terminus Bus interchange
Ramnagar
Coimbatore Junction Mainline rail interchange

The GreenLine or Line 2 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Red line (Line 1). The line stretches from Coimbatore Junction to Valiyampalayam Pirivu. The line consists of 14 stations.[1][2]

Stations

The stations proposed in the first phase of Coimbatore Metro in the Line-2 are:[3]

Green Line
S.No Station Name Interchange connection Places Connected Layout Opened Depot Connection Depot Layout
EnglishTamil
1Coimbatore Junctionகோயம்புத்தூர் சந்திப்பு  Red Line, Mainline rail interchange Coimbatore Junction railway stationCoimbatore Government HospitalElevatedProposed Phase 1NoneNone
2Ramnagarராம்நகர்NoneNoneElevatedProposed Phase 1NoneNone
3Gandhipuram Central Bus Terminusகாந்திபுரம் மத்திய பேருந்து நிலையம்Bus interchange Gandhipuram Central Bus Terminus, Bus interchange Gandhipuram Town Bus standNoneElevatedProposed Phase 1NoneNone
4Coimbatore Omni Bus Standகோயம்புத்தூர் ஆம்னி பேருந்து நிலையம்Bus interchange Coimbatore Omni Bus TerminusNoneElevatedProposed Phase 1NoneNone
5Moor Marketமூர் மார்க்கெட்NoneNoneElevatedProposed Phase 1NoneNone
6Ganapathy Pudurகணபதி புதூர்NoneNoneElevatedProposed Phase 1NoneNone
7Athipalayamஅத்திபாளையம்NoneNoneElevatedProposed Phase 1NoneNone
8Ramakrishna Millsராமகிருஷ்ணா மில்ஸ்NoneProzone MallElevatedProposed Phase 1NoneNone
9Vinayagapuramவிநாயகபுரம்NoneNoneElevatedProposed Phase 1NoneNone
10Chithra Nagarசித்ரா நகர்NoneNoneElevatedProposed Phase 1NoneNone
11Saravanampattiசரவணம்பட்டிNoneNoneElevatedProposed Phase 1NoneNone
12Viswasapuramவிஸ்வாசபுரம்NoneNoneElevatedProposed Phase 1NoneNone
13VGP Nagarவிஜிபி நகர்NoneNoneElevatedProposed Phase 1NoneNone
14Valiyampalayam Pirivuவலியம்பாளையம் பிரிவுNoneNoneElevatedProposed Phase 1NoneNone

See also

References

  1. ↑ "DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15". The Hindu. 1 July 2023. Retrieved 1 July 2023.
  2. ↑ "CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects". The Metro Rail News. 15 July 2023. Retrieved 15 July 2023.
  3. ↑ "39km Metro Line project in Phase 1". India Herald. 7 July 2023. Retrieved 7 July 2023.